Enron email

Algorithmic Indexing

24 messages for with:lisa.gang@enron.com after:2001-06 before:2001-07

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

with:lisa.gang@enron.com means Lisa Gang (lisa.gang@enron.com).

  1. 30 Jun 2001

    Susie Wilson to Cara Semperger, Mark Fischer, Tom Alonso and 4 more

    change in late tags, going to real time

    Lisa's tags that have been withdrawn because they were late and reentered as delayed tags for Real Time: Withdrawn Tag New Delayed Tag for Real Time 25876 25881 25765 258…

  2. 30 Jun 2001

    Cara Semperger to dispatch@epelectric.com, jhadda1@epelectric.com, lzaragoz@epelectric.com and 21 more

    El Paso Schedule for 7/1 and 7/2 - Extremely Problematic

    This sheet is as complete as possible, and I am worried about it due to the following circumstances; 1. The Dispatch sheet that comes to Real time was 25 MW flat on Sunda…

  3. 30 Jun 2001

    Donald Robinson to Cara Semperger, Mark Fischer, Tom Alonso and 5 more

    Preschedule paths going real-time for Sunday and Monday, 07/01 and 07/02.

    Preschedule had a heck-u-va day on Friday. Due to many problems, some of our tags were not completed until after the 3pm preschedule deadline. Apparently, some of our cou…

  4. 30 Jun 2001
  5. 30 Jun 2001

    Susie Wilson to Cara Semperger, Mark Fischer, Tom Alonso and 4 more

    change in late tags, going to real time

    Lisa's tags that have been withdrawn because they were late and reentered as delayed tags for Real Time: Withdrawn Tag New Delayed Tag for Real Time 25876 25881 25765 258…

  6. 30 Jun 2001

    Cara Semperger to dispatch@epelectric.com, jhadda1@epelectric.com, lzaragoz@epelectric.com and 21 more

    El Paso Schedule for 7/1 and 7/2 - Extremely Problematic

    This sheet is as complete as possible, and I am worried about it due to the following circumstances; 1. The Dispatch sheet that comes to Real time was 25 MW flat on Sunda…

  7. 30 Jun 2001

    Donald Robinson to Cara Semperger, Mark Fischer, Tom Alonso and 5 more

    Preschedule paths going real-time for Sunday and Monday, 07/01 and 07/02.

    Preschedule had a heck-u-va day on Friday. Due to many problems, some of our tags were not completed until after the 3pm preschedule deadline. Apparently, some of our cou…

  8. 29 Jun 2001
  9. 27 Jun 2001

    Cara Semperger to presched2@power.bpa.gov and 12 more

    Change in procedure for Preschedules between Enron and BPA

    Per a phone conversation between Matt and myself, the follwing changes to the way Enron communicates with BPA Prescheduling will begin as of 6/27/01: 1. A daily E-mail fo…

  10. 26 Jun 2001

    Jill Chatterton to Zou Cherry and 84 more

    Travel on Clicktrip

    Zou, I am requesting a log-in for clicktrip.com please. I arrange travel for the following employees, and will need access to their travel profile. Thank you, Jill Chatte…

  11. 23 Jun 2001

    Cara Semperger to shift.portland@enron.com, Diane Cutsforth, Lisa Gang and 3 more

    IDAHO HAS A NEW NERC ACRONYM

    WHEN THEY ARE MAKING TAGS, THEY ARE IDAC01, When we tag them, and they are sinking, they are still IPCM01

  12. 22 Jun 2001

    Cara Semperger to shift.portland@enron.com, Diane Cutsforth, Lisa Gang and 3 more

    IDAHO HAS A NEW NERC ACRONYM

    WHEN THEY ARE MAKING TAGS, THEY ARE IDAC01, When we tag them, and they are sinking, they are still IPCM01

  13. 21 Jun 2001

    Cara Semperger to shift.portland@enron.com, Diane Cutsforth, Lisa Gang and 3 more

    MidC Schedule going real time heavy load June 21

    Heavy Load for 6/21 Our Upstream BPA deal # 504537.1 Our Downstream IPCO deal # 655127.1 The path 5 mw BPA C#24008-EPMI-IPC-SNPD(T)BPA(T)BPAP/PACW-IPC-PACW(T)PACW/ENTERPR…

  14. 20 Jun 2001

    Cara Semperger to shift.portland@enron.com, Diane Cutsforth, Lisa Gang and 3 more

    MidC Schedule going real time heavy load June 21

    Heavy Load for 6/21 Our Upstream BPA deal # 504537.1 Our Downstream IPCO deal # 655127.1 The path 5 mw BPA C#24008-EPMI-IPC-SNPD(T)BPA(T)BPAP/PACW-IPC-PACW(T)PACW/ENTERPR…

  15. 19 Jun 2001

    Cara Semperger to Bill Williams III, Holden Salisbury, Lisa Gang and 1 more

    FW: Loss Tag Reminder

    -----Original Message----- From: "LYNN RICHARDSON" <LERICHRD@wapa.gov>@ENRON [mailto:IMCEANOTES-+22LYNN+20RICHARDSON+22+20+3CLERICHRD+40wapa+2Egov+3E+40ENRON@ENRON.com] S…

  16. 18 Jun 2001

    Cara Semperger to Bill Williams III, Holden Salisbury, Lisa Gang and 1 more

    FW: Loss Tag Reminder

    -----Original Message----- From: "LYNN RICHARDSON" <LERICHRD@wapa.gov>@ENRON [mailto:IMCEANOTES-+22LYNN+20RICHARDSON+22+20+3CLERICHRD+40wapa+2Egov+3E+40ENRON@ENRON.com] S…

  17. 18 Jun 2001
  18. 18 Jun 2001

    Lisa Gang to Greg Wolfe and 4 more

    GOOD JOB

    I wanted to commend the real time group for their efforts. For the past 6 month, I've noticed a dramatic difference in the accuracy of deal entry in Enpower. Accordingly,…

  19. 15 Jun 2001

    Cara Semperger to Holden Salisbury, Virginia Thompson, Lisa Gang and 2 more

    FW: Change In WACM Loss Factor Effective July 1, 2001

    -----Original Message----- From: "LYNN RICHARDSON" <LERICHRD@wapa.gov>@ENRON [mailto:IMCEANOTES-+22LYNN+20RICHARDSON+22+20+3CLERICHRD+40wapa+2Egov+3E+40ENRON@ENRON.com] S…

  20. 14 Jun 2001

    Donald Robinson to Cara Semperger, Stacy Runswick, Lisa Gang and 7 more

    Vacation, again.

    I will be out of the office from 06/16 through 06/24 due to vacation. Thank you for your support. Donald Robinson.

  21. 8 Jun 2001

    Lisa Gang to Kate Symes and 2 more

    RE: Losses at Kyrene - 5/31

    I thought we already discussed this yesterday. They are in my EPE presched sheet as several different deal. Do you need more clarification? lisa

  22. 8 Jun 2001

    Kate Symes to Lisa Gang and 2 more

    Losses at Kyrene - 5/31

    Lisa - I'm trying to figure out why two deals entered to cover losses at Kyrene for the 31st of May didn't make it into the preschedule sheet. I'm looking for the followi…

  23. 6 Jun 2001

    Cara Semperger to Diane Cutsforth, Lisa Gang, Donald Robinson and 10 more

    Cross training for the week Donald is gone

    Because I have to go to a PRC meeting all Day, and Donald will be out that Day, here is the plan: Stacy moves to MidC to train with Donald all next week, Cara schedules t…

  24. 4 Jun 2001

    Cara Semperger to shift.portland@enron.com and 6 more

    Please respect the space and belongings of others on this row

    Good Afternoon, Although Real Time is forced to live in a quasi-communal way, I would ask that you please do not treat the prescheduler desks as part of the commune. Lisa…