with:joe.hartsoe@enron.com means Joe Hartsoe (joe.hartsoe@enron.com).
-
31 May 2000
Cynthia Sandherr to Steven J Kean and 10 more
Re: MidAmerican RTO drafting re: Alliance Language
Steve: the ACE language has been modified somewhat from the original form which you have indeed seen before but not enough modification so as to correspond to FERC Order …
-
25 May 2000
Sarah Novosel to J Mark Metts, Mitchell Taylor, Ann Ballard and 5 more
PGE/Sierra FERC Answer to Protests
A copy of the final, filed answer by PGE/Sierra in response to the protests filed in the FERC merger proceeding is attached. Please let me know if you have any questions …
-
24 May 2000
Shelley Corman to tim.aron@enron.com, John Ballentine, Martha Benner and 96 more
Summary of Order 637-A
Sorry for the delay. Attached is a 13 page summary of Order No. 637-A.
-
24 May 2000
Christi L Nicolay to Richard Shapiro, Steven J Kean, Joe Hartsoe and 1 more
NERC 2000 Summer Assessment
This talks about the need for the proposed merchant generation to be built, so Dan W. is including this in the Entergy rehearing.
-
23 May 2000
Cynthia Sandherr to Steven J Kean, Richard Shapiro, Joe Hillings and 5 more
NARUC letter
Attached is NARUC's letter opposing the MidAmerican transmission compromise. In addition, by mail, I have forwarded to you Southern Company's lobbying piece to also oppos…
-
19 May 2000
Richard Ingersoll to Christi L Nicolay, Richard Shapiro, Dave Mangskau and 2 more
MAIN Policy Interpretation Request
Look good at this stage.
-
19 May 2000
Christi L Nicolay to tbradley@bracepatt.com, Harry Kingerski, Robert Frank and 4 more
Most industrials do not need EWG filings
We were wondering if industrials would need to file "expedited" EWG filings in order to take advantage of the ImPower order and the FERC order on Interim Reliability meas…
-
18 May 2000
Christi L Nicolay to Steven J Kean, Sarah Novosel, Richard Shapiro and 33 more
FERC order on Entergy's interconnection procedure
On 5/17/00, FERC issued an order accepting Entergy's pro forma interconnection agreement ("IA") and procedures subject to modification. As I mentioned earlier, Entergy ha…
-
18 May 2000
Christi L Nicolay to Jeff Brown, Charles Yeung, Richard Ingersoll and 4 more
APX presentation
APX's presentation about purchasing transmission rights over constrained flowgates. Discussed at Dynegy last week and to be presented to FERC on May 24 by APX.
-
17 May 2000
Linda L Lawrence to Daniel Allegretti, Roy Boston, Jeff Brown and 21 more
May 17, 200 Commission Meeting
May 17, 2000 Via Internet MEMORANDUM TO: Interested Clients FROM: John & Hengerer RE: Commission Meeting -- May 17, 2000 At today's meeting, the Commissioners approved th…
-
16 May 2000
Susan J Mara to Steven J Kean, Richard Shapiro, Tim Belden and 2 more
Summaries of Positions
Attached are cryptic summaries of the current positions. WPTF, APX, ISO and IEP are all fairly similar. Enron is working with those parties to develop a common proposal. …
-
16 May 2000
Susan J Mara to Steven J Kean, Richard Shapiro, Tim Belden and 1 more
CAISO Congestion Model
Carl has been working with Enron and others and the ISO to develop a model that works for CA as well as for the Desert Southwest (which the ISO would then operate). I thi…
-
5 May 2000
Sarah Novosel to Mitchell Taylor, Ann Ballard, Steven J Kean and 4 more
Re: Memorandum on Interventions in PGE/Sierra Pacific Resources Merger Application
Attached is a quick blurb on the major protests filed in the PGE/Sierra merger. There's good news and bad news. The good news is that there were only a couple of signific…
-
5 May 2000
Jeffrey Keeler to Michael Terraso, Marc Phillips, Mary Schoen and 66 more
TVA - EPA talks break down; TVA files court petition
EPA and TVA have been negotiating for some time over possible settlements in enforcement actions filed by EPA over modifications made to TVA power plants in violation of …
-
3 May 2000
Christi L Nicolay to Joe Hartsoe, Richard Shapiro, Sarah Novosel and 20 more
TVA and Entergy respond to S&S protests
TVA and Entergy filed answers to the numerous protests to Entergy's source and sink filing. TVA responded specifically to Enron and VEPCO's filings basically stating that…
-
2 May 2000
Christi L Nicolay to Dave Mangskau and 28 more
Re: ECAR filing
I reviewed the ECAR filing. ECAR is requiring Enron to agree to use it as an ECAR control area. I generally think it is a good filing and of importance because it is one …