with:fred.kelly@enron.com means Fred L Kelly (fred.kelly@enron.com).
-
22 Feb 2001
John G Rigby to Kay Mann and 12 more
(no subject)
1.0 ALL- The attached DRAFT letter is confidential and to remain with addresses only, except as Kay Mann deems necessary to share for coordination purposes. 2.0 ALL- I ha…
-
21 Feb 2001
Fred L Kelly to Ben Jacoby, Kay Mann, John G Rigby and 9 more
Siemens/West 501DA meeting w/ Ben Jacoby - 3:00pm EB3148
Notes from subject mtg. Steve Stein - please schedule something where we can get together and I can hand this off to you. Need your involvement. 0) Prior to the meeting -…
-
15 Feb 2001
John Schwartzenburg to Fred L Kelly and 6 more
Re: Siemens Westinghouse Points of Contractor- Generator Inspection
Thanks for the update, Fred. The idea of the meeting is great, and any further views of the matter should be either expressed in that meeting or by phone, and not in e-ma…
-
14 Feb 2001
Fred L Kelly to Ben Jacoby and 6 more
Re: Siemens Westinghouse Points of Contractor- Generator Inspection
Ben - although my role is changing inside Enron, you know I will always help you as requested/required. I am discussing this particular situation with Keith Dodson inside…
-
9 Feb 2001
-
6 Feb 2001
Kay Mann to Richard Leibert, Fred L Kelly, Peter Nassab and 5 more
Cost plus contract for Co Op City
As a follow up to my previous e-mail, here is the second request, which was in my opinion adequately addressed by John Schwartzenburg. I am frustrated with beginning the …
-
6 Feb 2001
Kay Mann to John G Rigby, Richard Leibert, Fred L Kelly and 7 more
Re: FW: Draft Coop City Term Sheet - priority.
Gentlemen, This was my first written request for a cost plus contract. The request was made to NEPCO because at that time NEPCO was supposedly still involved in the proje…
-
6 Feb 2001
Sandra EECC Rodriguez to jude.rolfes@enron.com, Fred L Kelly, Robert Sevitz and 7 more
CO-OP CITY - MEETING MINUTES
Sent on behalf of Dan Shultz:
-
1 Feb 2001
Brian D Barto to Chris Booth and 12 more
Re: Cost Breakout for Blue Dog #1 storage
The delivery point is the Factory by the contract since $198K was deducted delete delivery to a site in the U.S.. They are providing the lifting (Handling) service at the…
-
1 Feb 2001
Chris Booth to Matthew Tezyk and 12 more
Re: Cost Breakout for Blue Dog #1 storage
Matt, Why do I have to pay for the cranes at GE's factory to get the turbine on a rail car? Section 10.2 1 states that the Seller shall be responsible for loading Purchas…