Enron email

Algorithmic Indexing

18 messages for with:duong.luu@enron.com after:2001-09 before:2001-10

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

with:duong.luu@enron.com means Duong Luu (duong.luu@enron.com).

  1. 28 Sep 2001

    Steve Nat to Donald Wayne Vinson, Kim S. Theriot, Thresa A. Allen and 50 more

    Power Trading Systems - Bi-Weekly Status

    Week Ending 9/28/01: Glad to discuss... Steve

  2. 27 Sep 2001

    John M. Forney to Duong Luu and 4 more

    Enpower changes

    Duong, Can I get a change in Enpower? We have done this type thing on the West desk: For every counterparty "Ercot Imbalance" , I would like the Risk Mark to market flag …

  3. 27 Sep 2001

    Duong Luu to Cara Semperger and 10 more

    Re: Testing the PSW

    Hello Cara, Please see comments showing below in RED BTW, if you need me to unroute all daily route & term route for June 22, i will be happy to do so. Thanks for taking …

  4. 25 Sep 2001

    Duong Luu to Corry Bentley, Cara Semperger, asem@enron.com and 3 more

    RE: Testing the PSW

    Thanks Cara & Corry, i will make sure every item get resolved dluu

  5. 25 Sep 2001

    Corry Bentley to Cara Semperger, asem@enron.com, David Poston and 4 more

    RE: Testing the PSW

    I ran the PSW for the East (6/22 data) and also had problems with each of the following: 1) Enter moves cell to the left 2) Colors changed 3) Path with transmission did n…

  6. 20 Sep 2001

    Duong Luu to Cara Semperger

    Term Route & Daily Route

    Cara, We have unrouted all term & daily route for June 22 on pwrtestp and also emptied all path confirmation records. We have also granted you access to the new applicati…

  7. 17 Sep 2001

    Margie Nguyen to Chris Abel, thomas.araujo@enron.com, David Baumbach and 85 more

    Correction: Curve Load with Tibco

    Please note the correction in red below Thanks

  8. 17 Sep 2001

    Margie Nguyen to Chris Abel, thomas.araujo@enron.com, David Baumbach and 85 more

    Curve Load with Tibco

    Hi all, There has been a problem some of us have had with a Curve Load excel file. This curve load file was not developed by TAGG/ERMS. Therefore, to resolve this problem…

  9. 14 Sep 2001

    Steve Nat to Donald Wayne Vinson, Kim S. Theriot, Thresa A. Allen and 50 more

    Power Trading Systems Update

    Week Ending 9/14/01: Glad to discuss... Steve

  10. 13 Sep 2001

    Debra Bailey to Debra Bailey, Duong Luu, Stacey W. White and 10 more

    Other Commodities into Consolidated Position Manager - Scoping Meeting

    Meeting Objective: We will scope new requirements for position manager to provide functionality for other commodities (gas, coal). In addition, we will discuss the potent…

  11. 10 Sep 2001

    Asem Atta to Corry Bentley, Cara Semperger and 8 more

    Preschedule Workspace

    A new version of Preschedule Workspace has been migrated to Stage addressing the 'EDIT' bug of copying workspace. regards, Asem Atta x31700 Enron Net Works

  12. 10 Sep 2001

    Asem Atta to Corry Bentley, Will Smith and 6 more

    RE: PSW/PSC 0910 Test

    Corry, As per Will, the understanding was that deals with transmissions were far and few in between and were currently being manually routed, and this was not a feature t…

  13. 7 Sep 2001

    Francis S. Lim to Chris Abel, thomas.araujo@enron.com, David Baumbach and 131 more

    Please read: ERMT migration to 8i

    All, As you are aware that the ERMT database will be migrated to Oracle 8i on Saturday, September 15. In order to start the process, TAGG/ERMS will be unavailable from 8 …

  14. 7 Sep 2001

    Asem Atta to Cara Semperger, Corry Bentley, David Poston and 4 more

    RE: Status Report and Production Release Note

    Just got done talking with Corry, and Deal Scheduling showing the incorrect status of a physical routed flag is an issue. Corry will proceed and test against pwrtestp on …

  15. 6 Sep 2001

    Asem Atta to Cara Semperger, Corry Bentley and 8 more

    RE: Testing PSW and Path confirmation for Target date 6/20

    Cara, Thanks for stepping me through Deal Scheduling to see exactly what the problem was in regards to the Physical/Non-Physical issue. Addressed this issue and we have s…

  16. 6 Sep 2001

    Asem Atta to Cara Semperger, Corry Bentley and 8 more

    RE: Testing PSW and Path confirmation for Target date 6/20

    Cara et all, Following list of bug fixes are moving out to stage to address the recently reported issues: New versions of both applications have been moved out to stage..…

  17. 5 Sep 2001

    Asem Atta to Cara Semperger and 8 more

    RE: Testing the PSW and Path Confirm Report

    Cara, Could I get a copy of the psc file for the preschedworkspace tests you ran today? Id like to mimic your actions to see exactly how these errors were generated and p…

  18. 4 Sep 2001

    Steve Nat to Donald Wayne Vinson, Kim S. Theriot, Thresa A. Allen and 47 more

    Power Trading Systems - Bi-Weekly Status

    Week Ending 8/31/01: Glad to discuss... Steve