  1. 31 Aug 2001

    Kevin Hyatt to Dennis Alters, Nancy Bagot, Larry Campbell and 30 more

    Sun Devil Open Season Results --CONFIDENTIAL--

    Overall, the results from Thursday's open season on our Sun Devil Project were very favorable (see below). Contract terms ranged from two to sixteen years. San Juan 84% s…

  2. 31 Aug 2001

    Doug Cebryk to Ron Matthews, Norm Spalding, Morgan Gottsponer and 9 more

    RE: Sun Devil Pipeline Lengths

    To All: I was very optimistic in my target of getting the Level B estimate ready by Sept 21. Based on the amount of work that will need to be done to get a decent +/- 10%…

  3. 31 Aug 2001

    Larry Campbell to John Shafer and 18 more

    Re: Sun Devil - Helicopter Fly-Over of Routes

    John, I plan on grabbing not only a digital camera but also my video camera to handle the panarama part of the equations. In conversations with Doug Cebryk, it looks like…

  4. 31 Aug 2001

    John Shafer to Larry Campbell and 18 more

    Sun Devil - Helicopter Fly-Over of Routes

    Larry, Please give me a report following your fly-over of the route with Doug Cebryk. I am very interested in what you see and the potentials that are there. Don't forget…

  5. 31 Aug 2001

    Larry Campbell to John Shafer and 22 more

    Re: Sun Devil - Helicopter Fly-Over of Routes

    John, I plan on grabbing not only a digital camera but also my video camera to handle the panarama part of the equations. In conversations with Doug Cebryk, it looks like…

  6. 31 Aug 2001

    John Shafer to Larry Campbell and 22 more

    Sun Devil - Helicopter Fly-Over of Routes

    Larry, Please give me a report following your fly-over of the route with Doug Cebryk. I am very interested in what you see and the potentials that are there. Don't forget…

  7. 30 Aug 2001

    Ron Matthews to Norm Spalding, Morgan Gottsponer, John R. Keller and 7 more

    RE: Sun Devil Pipeline Lengths

    A preliminary model has been developed based on the limited information Doug, Kevin, and I discussed yesterday. A finished product won't be complete until such time as el…

  8. 30 Aug 2001

    Darrell Schoolcraft to Doug Cebryk, Kevin Hyatt

    RE: 4th Annual Energize Houston Golf Tournament

    I would be glad to play. However I am not a scratch golfer anymore. My handicap is at 15 now that I don't play as much. If you still want me to play let me know. Thanks f…

  9. 29 Aug 2001

    Doug Cebryk to Kevin Hyatt, Ron Matthews and 4 more

    RE: Sun Devil Pipeline Lengths

    Kevin I'll need to fly the routes and assess the terrain conditions. I plan to do this on Sept 11&12 Ron will need to run the hydraulics on the various options. We both t…

  10. 27 Aug 2001

    Kevin Hyatt to scott'.'patti@enron.com, Doug Cebryk

    Sun Devil Project Phoenix terminus

    For right now, consider the info below as the likely terminus for the Phoenix lateral. This was taken from the APS press release announcing their gas storage project. Let…

  11. 22 Aug 2001

    Ron Matthews to Kevin Hyatt, Morgan Gottsponer, Doug Cebryk and 4 more

    Sun Devil Project - Level B Request "REVISED"

    I found a mistake in the first Excel spreadsheet when discussing with Kim Kouri. Cost Estimate Summary sheet (2nd tab) did not add all of the rows down for the San Juan p…

  12. 22 Aug 2001

    John Shafer to Eric Gadd, Kevin Hyatt and 14 more

    Preliminary Environmental Timeline - Sun Devil

    Eric and Kevin, Attached is a preliminary timeline for working through all of the environmental related issues to deliver the necessary Resource Reports (F-1) for the FER…

  13. 20 Aug 2001

    Susan Wadle to Sarah Haden, Michelle Lokay, Doug Cebryk and 17 more

    Sun Devil Team introductory get together

    Please join us for lunch from 11:30 to 12:30 on Wednesday, August 22 in the Executive Dining Room on 50M to meet other members of the team and discuss the project. RSVP b…