Enron email

Algorithmic Indexing

28 messages for with:a..howard@enron.com after:2002-03 before:2002-04

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

with:a..howard@enron.com means Kevin A. Howard (a..howard@enron.com).

  1. 25 Mar 2002

    Kevin A. Howard to Shelley Corman

    TransPecos

    Just an fyi on this, last week I spent a considerable amount of time with Kim and her team going over strategy, both financial and commercial for the TransPecos deal. Kim…

  2. 20 Mar 2002

    Lindy Donoho to Kevin A. Howard

    New Sentence

    Currently, Transwestern is considering the TransPecos project, a joint venture where Transwestern would own a 50% undivided interest in a new pipeline with capacity of 31…

  3. 20 Mar 2002

    Davis Thames to Lindy Donoho, Kevin A. Howard and 2 more

    RE: updated Transwestern model

    Lindy, Current situation: we are planning on subscribing 70.8% of east leg capacity, with 5% currently under long term contracts (therefore, 65.8% will be resubscribed at…

  4. 20 Mar 2002
  5. 20 Mar 2002

    Steven Harris to Kevin A. Howard, Lindy Donoho, Davis Thames and 2 more

    RE: TW forecast

    How about tomorrow morning at 9am in my office (3902)?

  6. 20 Mar 2002

    Kevin A. Howard to Steven Harris, Lindy Donoho, Davis Thames

    TW forecast

    Steve: I think it makes sense to get together either later today or tomorrow morning to go over the forecast. Given that Tracy is out, I don't want anything to slip throu…

  7. 20 Mar 2002

    Kevin A. Howard to Denis Tu, Lindy Donoho and 2 more

    RE: TW Business Plan Draft

    Agreed -------------------------- Sent from my BlackBerry Wireless Handheld (www.BlackBerry.net)

  8. 20 Mar 2002

    Kevin A. Howard to Lindy Donoho, Davis Thames and 2 more

    RE: updated Transwestern model

    Today -------------------------- Sent from my BlackBerry Wireless Handheld (www.BlackBerry.net)

  9. 20 Mar 2002

    Lindy Donoho to Davis Thames, Kevin A. Howard and 2 more

    RE: updated Transwestern model

    I see at the bottom of the Business Plan where Tracy has asked for written assumptions for the forecast from you. Has this been completed? Steve would like to see this by…

  10. 20 Mar 2002

    Denis Tu to Lindy Donoho, Kevin A. Howard and 2 more

    RE: TW Business Plan Draft

    Kevin: I just checked with Rob Kilmer, a TW old hand. He said that Texas Eastern bought TW before 1974, but he was not sure exactly when. I suggest that in the Historical…

  11. 20 Mar 2002

    Shelley Corman to Kevin A. Howard

    RE: TW/Border meeting

    I have another meeting at 3. I'll join you late if I can. I'm just finishing up my comments on the NNG business plan and will forward shortly. This morning I discovered a…

  12. 20 Mar 2002

    Shelley Corman to Kevin A. Howard

    Re: NNG clarification

    No material impact . The filing concerns various scheduling and balancing rules. -------------------------- Sent from my BlackBerry Wireless Handheld (www.BlackBerry.net)

  13. 19 Mar 2002

    Shelley Corman to Kevin A. Howard

    RE: NNG revised business plan

    Thanks, I needed a little bedtime reading!

  14. 19 Mar 2002

    Denis Tu to Kevin A. Howard, Lindy Donoho, David E. Rosenberg

    Revised TW Business Plan

    Kevin: Dave will wordsmith his California write-up and send the document to us. Is the attached for IX. Summary Financial Data? New Source Review: When we put in new engi…

  15. 19 Mar 2002

    Ron Matthews to Denis Tu, Tracy Geaccone, Kevin A. Howard and 3 more

    FW: TW Asset Description

    Denis caught a mistake (or typo) in yesterday's memo. The correction is in RED below. Ron M.

  16. 18 Mar 2002

    Ron Matthews to Denis Tu, Tracy Geaccone, Kevin A. Howard and 3 more

    TW Asset Description

    Asset Base TW's physical assets will include 2,618 miles of pipe ranging from 2 inch to 30 inch diameter and 29 mainline and lateral compressor stations including three e…

  17. 13 Mar 2002

    Teb Lokey to Kevin A. Howard

    RE: Accumulated Deferred inc taxes

    We're still refining the post-Red Rock regulatory rate base and won't know the offset until sometime tomorrow pm. The same theory would apply to TW - if you don't collect…

  18. 12 Mar 2002

    Lindy Donoho to Kevin A. Howard and 2 more

    TW Spreadsheet

    Here is the projected subscribed capacity and revenue through 2010. This was updated in February, 2002. Please review it to determine all of this info is appropriate to b…

  19. 8 Mar 2002

    Tracy Geaccone to Kimberly Watson and 2 more

    FW: TransPecos KMI LOI

    Can you help with this one?

  20. 7 Mar 2002

    Steven Harris to Kevin A. Howard and 2 more

    RE: TW business plan

    No problem, Lindy did all the hard work!

  21. 7 Mar 2002

    Kevin A. Howard to Steven Harris and 2 more

    TW business plan

    Steve: I just wanted to thank you and Lindy for helping us with the TW business plan. I think it looks very good. Kevin

  22. 6 Mar 2002

    Gina Taylor to kimberlee.driscoll@enron.com, Mariella Mahan, ralph.edwards@enron.com and 25 more

    Graphics Services and Design

    Your group has been using Debbie Moore for graphics services and design work. We want to be sure that you are aware that we are eliminating our graphics services and desi…

  23. 5 Mar 2002
  24. 5 Mar 2002

    Kevin A. Howard to Lindy Donoho

    RE: Power gen mkts slide

    Thanks - that's what I was hoping it was. Heading in to see Moodys. Thanks again for your help. -------------------------- Sent from my BlackBerry Wireless Handheld (www.…

  25. 5 Mar 2002

    Lindy Donoho to Kevin A. Howard

    RE: Power gen mkts slide

    It is my understanding (from Kevin Hyatt) that its like Arizona's PUC.