Enron email

Algorithmic Indexing

12 messages for to:will.smith@enron.com after:2001-11 before:2001-12

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

to:will.smith@enron.com means Will Smith (will.smith@enron.com).

  1. 28 Nov 2001

    Bill Williams III to MIchael Tully, Will Smith, Pete Davis

    FW: Approval...

    I have also not been able to approve these. I do need those folks to have access...

  2. 27 Nov 2001
  3. 27 Nov 2001

    Cara Semperger to Corry Bentley, Duong Luu, David Poston and 4 more

    Build Route Difficulties

    I have re-started Enpower since the e-mail came out saying that the new version has been put into production. I ran the attatched sheet, and the last group of deals that …

  4. 26 Nov 2001

    Cara Semperger to Vishwanatha Venkataswami and 8 more

    The problem with running a whole new build route for the month when a problem occurrs

    We need to be able to rely on the repeated running of the build route. Running a month long sheet from scratch is a huge problem for us, it forces us to do massive amount…

  5. 26 Nov 2001

    Cara Semperger to Vishwanatha Venkataswami, Will Smith, William Crooks

    I NEED SOMEONE TO CALL STACY RUNSWICK AS SOON AS POSSIBLE

    Stacy just ran her build route for December and got data with no counterparty names, I just ran my build route for December and got new data blended with old data. We nee…

  6. 21 Nov 2001

    Dave Nommensen to Bill Williams III, Don Baughman Jr., Stacey W. White and 34 more

    Enpower weekend maintenance - down times

    All, The Enpower Database is in need of some routine maintenance and clean-up. The work is designed to improve performance and expandability for the future. We were hopin…

  7. 21 Nov 2001

    Cara Semperger to Vishwanatha Venkataswami and 8 more

    RE: Pre Schdule Work Space - Including Other Deals Section in Build Route

    Other deals is fine, Build route has been selecting the hourly deals just fine, and including them in the off peak sections. We must be able to see these deals, as we hav…

  8. 15 Nov 2001

    Cara Semperger to Corry Bentley, Duong Luu, David Poston and 8 more

    another thing about PSW build Route

    The old build route remembered what the user chose last for delivery points, and had it in the defaults each time Build route was opened. Can this be duplicated in the PS…

  9. 15 Nov 2001

    Cara Semperger to Corry Bentley, Duong Luu, David Poston and 8 more

    Another Change To Build Route Preferences

    Please have the default set to "Starting on" not "Active on". We use Starting on Every day, and Active on much more rarely. Thanks, Cara

  10. 13 Nov 2001

    Cara Semperger to shift.dl-portland@enron.com, Mike Purcell, Virginia Thompson and 17 more

    All West Power Delivery Points in the new system as of Flow Date 11/15/01

    Good Afternoon, The last of our kinks has been worked out and we are going to go ahead with all schedules in the new system as of 11/15. We will then have a good couple o…

  11. 12 Nov 2001

    Steve Nat to Kristin Albrecht, Thresa A. Allen, Harry Arora and 184 more

    Wholesale Power - Bi-Weekly Update

    Period ending 11/09/01. Please note changes to content and format. An updated org chart is also attached. Glad to discuss... Steve

  12. 9 Nov 2001

    Cara Semperger to Corry Bentley, Duong Luu, David Poston and 2 more

    Take a look at the off peak deals in this sheet

    Good Evening I ran a master download for December 1 so that over the next few days I can test the overwriting fix, and found two deals that are 24 hour deals, show schedu…