10 more fall outside these years.
to:tom.nemila@enron.com means Tom Nemila (tom.nemila@enron.com).
-
12 Jul 2002
Mark Fisher to Tom Nemila and 2 more
WR613 Pitch System performance
Tom, Here is the report I prepared on the methods and types of grpahs for this work request. As examples I used the May 2002 graphs, including the Paretos for the Pitch a…
-
12 Jul 2002
Mark Fisher to Tom Nemila and 2 more
WR627 Fault Paretos (May 2002)
Tom, Here are the fault paretos of fault counts for all sites for May 2002 (may2002paretos_faults.pdf). For readability only the top 30 faults for each site are displayed…
-
9 Jul 2002
Mark Fisher to Tom Nemila and 2 more
WR613 Pitch System Performance
Tom, Attached are the graphs for energy lost due to the pitch and overspeed faults you listed. As I mentioned before the methodology requires decent data recovery for the…
-
8 Jul 2002
Mark Fisher to andre.rast@enron.com and 4 more
Subset of data with extreme temp
Andre, Here is a short subset of 10-minute records containing the extreme temperature event (approximately 3 hours of before/after data). The turbine was #105 at Desert S…
-
8 Jul 2002
Mark Fisher to Tom Nemila and 2 more
Gearbox Temp graphs
Tom, The graphs attached are formatted the same as the sample set I sent you earlier. As of today, Desert Sky 10-minute data has not been uploaded for June 2002 yet, and …
-
8 Jul 2002
Mark Fisher to Tom Nemila and 2 more
Gear Box Temp Graphs
Tom, Here is a sample of the output for this request. For this I have only used May 2002. I for the boxplots one has had records removed when the ambient and gearbox temp…
-
5 Jul 2002
Mark Fisher to Tom Nemila and 2 more
WR613 Pitch System Performance (Energy)
Tom, I have energy estimates for May 2002 attached. Graph 1 is site totals, graph 2 is (total lost)/(total actual production) where total actual production is taken from …
-
3 Jul 2002
Mark Fisher to Tom Nemila and 2 more
WR613 Pitch System Fault Pareto
Tom, From the stage I was at on the duration and energy it was just as easy to do all 7 sites as the 3 you specifically requested. If you do not want the additional graph…
-
3 Jul 2002
Mark Fisher to Tom Nemila and 2 more
WR613 Pitch System Performance
Tom, Here are the new graphs with totals (bar charts) and distributions (boxplots) for all seven sites through May 2002. I believe that I have come up with a method of pr…
-
2 Jul 2002
Mark Fisher to Tom Nemila and 2 more
WR613 Pitch System Performance
Tom, Maybe I mis-interpreted again, but here are the graphs for site total (the boxplots are still by turbine). This is for May. I will wait to see if this is more like w…
-
14 Jun 2002
Tim Mohammed to Joe Thorpe and 16 more
Zilkha Availability
Joe, Lets not forget that we had measure problems due to failing MS3 relay in the SEG converter, which caused the crow bar to engage, which in turn forced CB1 to fault. C…
-
14 May 2002
Jeff Maurer to mike.westbeld@enron.com, craig.christenson@enron.com, Kevin Cousineau and 51 more
Lessons Learned Matrix for 2001 Projects
All, Attached is the Lessons Learned matrix developed from our meeting last week. I want to thank everyone who participated. There were some who wanted to attend but coul…
-
3 May 2002
Kevin Cousineau to Hollis Kimbrough, stan.ballard@enron.com, Paul Landers and 7 more
Re: 1.5 MW WTG SPC reports
Hollis: I am forwarding this to our Controls Group people who are working on a manual with full description of all sensors, locations, identification, names, etc. I am as…
-
2 May 2002
Hollis Kimbrough to Tom Nemila, Kevin Cousineau and 4 more
1.5 MW WTG SPC reports
Tom/Kevin, In the development of the 1.5 MW WTG Statistical Process Control (SPC) reporting tool we have some additional questions regarding the data which comes to us fr…
-
1 May 2002
Hollis Kimbrough to Tom Nemila and 4 more
Trent Pareto Fault Analysis - March
Tom, Attached is pareto analysis you requested for Trent during the month of March. The chart covers the site for the top 26 status messages and all the status messages a…
-
1 May 2002
Trent Mesa WTG 8 Work Request
Please see the attached work request. Tom - If we can build a performance related characteristic to identify these events we will follow up with another work request to l…
-
30 Apr 2002
Work Request
Please see attached... Tom - Please look over this work request and if you need something different please let me know. Thanks, Hollis
-
16 Apr 2002
Joe Chapman to john.admire@enron.com, stan.ballard@enron.com, Benjamin Bell and 13 more
Storm Lake 1 & 2 SCADA password changed
The new password for Storm Lake 1 is: office The new password for Storm Lake 2 is: window Joe
-
14 Mar 2002
Hollis Kimbrough to jim.wallace@enron.com and 12 more
Trent Mesa WTG #79 data
Jim, Attached is our report for WTG 79 which answers the questions posed by Eickoff. Please note that we provided more information than we were asked for in anticipation …
-
3 Aug 2001
Gina Corteselli to Michelle Thompson, richard.castillo@enron.com, Suzanne Danz and 135 more
Mid-Year PRC Process - Your Suggestions/Comments
Thank you for taking the time to share your comments regarding the Mid Year 2001 PRC process. Your comments, concerns, and suggestions have been reviewed and are currentl…