    WR613 Pitch System performance

    Tom, Here is the report I prepared on the methods and types of grpahs for this work request. As examples I used the May 2002 graphs, including the Paretos for the Pitch a…

  2. 12 Jul 2002

    Mark Fisher to Tom Nemila and 2 more

    WR627 Fault Paretos (May 2002)

    Tom, Here are the fault paretos of fault counts for all sites for May 2002 (may2002paretos_faults.pdf). For readability only the top 30 faults for each site are displayed…

  3. 9 Jul 2002

    Mark Fisher to Tom Nemila and 2 more

    WR613 Pitch System Performance

    Tom, Attached are the graphs for energy lost due to the pitch and overspeed faults you listed. As I mentioned before the methodology requires decent data recovery for the…

  4. 8 Jul 2002

    Mark Fisher to andre.rast@enron.com and 4 more

    Subset of data with extreme temp

    Andre, Here is a short subset of 10-minute records containing the extreme temperature event (approximately 3 hours of before/after data). The turbine was #105 at Desert S…

  5. 8 Jul 2002

    Mark Fisher to Tom Nemila and 2 more

    Gearbox Temp graphs

    Tom, The graphs attached are formatted the same as the sample set I sent you earlier. As of today, Desert Sky 10-minute data has not been uploaded for June 2002 yet, and …

  6. 8 Jul 2002

    Mark Fisher to Tom Nemila and 2 more

    Gear Box Temp Graphs

    Tom, Here is a sample of the output for this request. For this I have only used May 2002. I for the boxplots one has had records removed when the ambient and gearbox temp…

  7. 5 Jul 2002

    Mark Fisher to Tom Nemila and 2 more

    WR613 Pitch System Performance (Energy)

    Tom, I have energy estimates for May 2002 attached. Graph 1 is site totals, graph 2 is (total lost)/(total actual production) where total actual production is taken from …

  8. 3 Jul 2002

    Mark Fisher to Tom Nemila and 2 more

    WR613 Pitch System Fault Pareto

    Tom, From the stage I was at on the duration and energy it was just as easy to do all 7 sites as the 3 you specifically requested. If you do not want the additional graph…

  9. 3 Jul 2002

    Mark Fisher to Tom Nemila and 2 more

    WR613 Pitch System Performance

    Tom, Here are the new graphs with totals (bar charts) and distributions (boxplots) for all seven sites through May 2002. I believe that I have come up with a method of pr…

  10. 2 Jul 2002

    Mark Fisher to Tom Nemila and 2 more

    WR613 Pitch System Performance

    Tom, Maybe I mis-interpreted again, but here are the graphs for site total (the boxplots are still by turbine). This is for May. I will wait to see if this is more like w…

  11. 14 Jun 2002

    Tim Mohammed to Joe Thorpe and 16 more

    Zilkha Availability

    Joe, Lets not forget that we had measure problems due to failing MS3 relay in the SEG converter, which caused the crow bar to engage, which in turn forced CB1 to fault. C…

  12. 14 May 2002

    Jeff Maurer to mike.westbeld@enron.com, craig.christenson@enron.com, Kevin Cousineau and 51 more

    Lessons Learned Matrix for 2001 Projects

    All, Attached is the Lessons Learned matrix developed from our meeting last week. I want to thank everyone who participated. There were some who wanted to attend but coul…

  13. 3 May 2002

    Kevin Cousineau to Hollis Kimbrough, stan.ballard@enron.com, Paul Landers and 7 more

    Re: 1.5 MW WTG SPC reports

    Hollis: I am forwarding this to our Controls Group people who are working on a manual with full description of all sensors, locations, identification, names, etc. I am as…

  14. 2 May 2002

    Hollis Kimbrough to Tom Nemila, Kevin Cousineau and 4 more

    1.5 MW WTG SPC reports

    Tom/Kevin, In the development of the 1.5 MW WTG Statistical Process Control (SPC) reporting tool we have some additional questions regarding the data which comes to us fr…

  15. 1 May 2002

    Hollis Kimbrough to Tom Nemila and 4 more

    Trent Pareto Fault Analysis - March

    Tom, Attached is pareto analysis you requested for Trent during the month of March. The chart covers the site for the top 26 status messages and all the status messages a…

  16. 1 May 2002

    Hollis Kimbrough

    Trent Mesa WTG 8 Work Request

    Please see the attached work request. Tom - If we can build a performance related characteristic to identify these events we will follow up with another work request to l…

  17. 30 Apr 2002

    Hollis Kimbrough

    Work Request

    Please see attached... Tom - Please look over this work request and if you need something different please let me know. Thanks, Hollis

  18. 16 Apr 2002

    Joe Chapman to john.admire@enron.com, stan.ballard@enron.com, Benjamin Bell and 13 more

    Storm Lake 1 & 2 SCADA password changed

    The new password for Storm Lake 1 is: office The new password for Storm Lake 2 is: window Joe

  19. 14 Mar 2002

    Hollis Kimbrough to jim.wallace@enron.com and 12 more

    Trent Mesa WTG #79 data

    Jim, Attached is our report for WTG 79 which answers the questions posed by Eickoff. Please note that we provided more information than we were asked for in anticipation …

  20. 3 Aug 2001

    Gina Corteselli to Michelle Thompson, richard.castillo@enron.com, Suzanne Danz and 135 more

    Mid-Year PRC Process - Your Suggestions/Comments

    Thank you for taking the time to share your comments regarding the Mid Year 2001 PRC process. Your comments, concerns, and suggestions have been reviewed and are currentl…