Enron email

Algorithmic Indexing

6 messages for to:team.monahans@enron.com from:larry.campbell@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:larry.campbell@enron.com means Larry Campbell (larry.campbell@enron.com).

to:team.monahans@enron.com means team.monahans@enron.com.

  1. 7 Sep 2001

    Larry Campbell to William Kendrick, John Shafer, Sarita Garza and 37 more

    Albuquerque Environmental Roundtable, Oct. 16-17

    The 2001 environmental roundtable has been confirmed for the above location and dates. Make your reservations at the Holiday Inn Crowne Plaza (505) 821-3333. The hotel is…

  2. 14 Aug 2001

    Larry Campbell to team.artesia@enron.com, team.big-lake@enron.com, team.carlsbad@enron.com and 54 more

    Southwest Region Environmental Roundtable Oct. 16-18

    The Southwest Region will be hosting its 2001 environmental roundtable in Albuquerque, NM on October 16-17 at the Holiday Inn Crowne Plaza (505) 821-3333. Room rates are …

  3. 17 Jul 2001

    Larry Campbell to team.big-lake@enron.com, team.eunice-jal@enron.com, Team Eunice-Kermit and 22 more

    EOTT Crude Oil Tanks

    A newly revised rule (Subpart HH) has just been implemented by the EPA concerning curde oil tanks with a daily throughput of equal to or greater than 500 bbls. per day. I…

  4. 7 Mar 2000

    Larry Campbell to team.big-lake@enron.com, Team Eunice-Kermit, team.monahans@enron.com and 13 more

    Natrual Gas Release Reporting Requirements for Texas

    As a reminder, the state of Texas requires releases of natural gas greater than 119 mscf to the atmosphere (in a 24 hour period), to be reported to the Regional Offices o…

  5. 2 Feb 2000

    Larry Campbell to team.artesia@enron.com, team.monahans@enron.com, Team San-Juan and 8 more

    Nitrogen and Sulfur reporting and Recordkeeping for Turbines

    For those teams that have turbines installed after 1990 and/or for those turbines which have undergone power unit changouts, the following recordkeeping and monitoring co…

  6. 15 Jul 1999

    Larry Campbell to team.monahans@enron.com and 10 more

    Groundwater Monitoring to be Discontinued at the Puckett Plant

    Approval was received from the Texas Railroad Commission to discontinue groundwater monitoring at the Pucket Plant. As you may remember, Transwestern constructed a permit…