Enron email

Algorithmic Indexing

196 messages for to:susan.scott@enron.com from:drew.fossum@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:drew.fossum@enron.com means Drew Fossum (drew.fossum@enron.com).

to:susan.scott@enron.com means Susan M Scott (susan.scott@enron.com).

  1. 30 Apr 2001

    Drew Fossum to Maria Pavlou, Steven Harris, Kevin Hyatt and 13 more

    RE: TW capacity options order

    Ugh. Not only does this result stink in this docket, but my paranoid side (about 95% of me) thinks this is an entirely political decision and bodes ill for our overall Ca…

  2. 12 Apr 2001

    Drew Fossum to Steven Harris, Susan M Scott and 14 more

    RE: Red Rock posting -- URGENT

    We need to clear up the "minimum bid" issue and this posting would be a good place to do that. Can we put in a new sentence setting out the minimum NPV bid? We need to cr…

  3. 3 Apr 2001

    Drew Fossum to Maria Pavlou, rhirasuna@akingump.com, fkelly@gbmdc.com and 9 more

    Re: FW: Draft Transwestern Response to FERC Order

    From: Maria Pavlou/ENRON@enronXgate on 04/02/2001 04:12 PM To: Drew Fossum/ET&S/Enron@ENRON, Mary Kay Miller/ET&S/Enron@ENRON, Susan Scott/ENRON@enronXgate, Steven Harris…

  4. 2 Apr 2001

    Drew Fossum to Susan M Scott

    Re: Additional Needles capacity

    Got lunch plans? Lets talk about this at 12:30--my joint. (I'll buy) df From: Susan Scott/ENRON@enronXgate on 03/30/2001 03:01 PM To: Glen Hass/ET&S/Enron@ENRON, Mary Kay…

  5. 2 Apr 2001

    Drew Fossum to Susan M Scott

    Re: Additional Needles capacity

    Got lunch plans? Lets talk about this at 12:30--my joint. (I'll buy) df From: Susan Scott/ENRON@enronXgate on 03/30/2001 03:01 PM To: Glen Hass/ET&S/Enron@ENRON, Mary Kay…

  6. 30 Mar 2001

    Drew Fossum to Eric Gadd, Steven Harris, Phil Lowry and 9 more

    TW Generation

    Are we still considering adding ETS-owned generation at one or more of the TW compressor stations in Arizona or NM? In case that is still a possibility, let me pass on so…

  7. 30 Mar 2001

    Drew Fossum to Maria Pavlou and 6 more

    Re: TW's negotiated rate deals

    This may be a good idea, but lets not forget that BP is the entity formerly known as "BP Amoco" which, if I'm not mistaken, is the home of Jeff Hooligan. That guy sees ev…

  8. 30 Mar 2001

    Drew Fossum to Eric Gadd, Steven Harris, Phil Lowry and 9 more

    TW Generation

    Are we still considering adding ETS-owned generation at one or more of the TW compressor stations in Arizona or NM? In case that is still a possibility, let me pass on so…

  9. 30 Mar 2001

    Drew Fossum to Maria Pavlou and 6 more

    Re: TW's negotiated rate deals

    This may be a good idea, but lets not forget that BP is the entity formerly known as "BP Amoco" which, if I'm not mistaken, is the home of Jeff Hooligan. That guy sees ev…

  10. 29 Mar 2001

    Drew Fossum to Gina Taylor and 24 more

    Re: Transwestern Press Release

    Great. DF From: Gina Taylor/ENRON@enronXgate on 03/28/2001 03:21 PM To: Drew Fossum/ET&S/Enron@ENRON, Steven Harris/ET&S/Enron@ENRON, Mary Ellen Miller/ENRON@enronxgate, …

  11. 28 Mar 2001

    Drew Fossum to Gina Taylor and 24 more

    Re: Transwestern Press Release

    Great. DF From: Gina Taylor/ENRON@enronXgate on 03/28/2001 03:21 PM To: Drew Fossum/ET&S/Enron@ENRON, Steven Harris/ET&S/Enron@ENRON, Mary Ellen Miller/ENRON@enronxgate, …

  12. 27 Mar 2001

    Drew Fossum to Mary Kay Miller and 4 more

    Re: Red Rock posting

    I think we do say that in the "to the extent we didn't get binding bids for all of the capacity" sentence. With that clarification, I think we ought to get this posted an…

  13. 27 Mar 2001

    Drew Fossum to Susan M Scott and 4 more

    FW: CEC Interviews

    FYI. Feel free to sit in so you have a better sense of what you might face at the CPUC workshop on the 17th. I'm not sure where we'll do this--probably either Shelley's o…

  14. 27 Mar 2001

    Drew Fossum to Maria Pavlou and 12 more

    RE: Red Rock form contract

    I think its ok because its not a unilateral termination right--its a termination right triggered by a changed circumstance that upsets the basic bargain of the parties. I…

  15. 27 Mar 2001

    Drew Fossum to Mary Kay Miller and 4 more

    Re: Red Rock posting

    I think we do say that in the "to the extent we didn't get binding bids for all of the capacity" sentence. With that clarification, I think we ought to get this posted an…

  16. 27 Mar 2001

    Drew Fossum to Susan M Scott and 4 more

    FW: CEC Interviews

    FYI. Feel free to sit in so you have a better sense of what you might face at the CPUC workshop on the 17th. I'm not sure where we'll do this--probably either Shelley's o…

  17. 27 Mar 2001

    Drew Fossum to Susan M Scott and 4 more

    Re: Red Rock posting

    Here are my comments--I'd like to take out the stuff about the rate and any implication that we have flexible terms and conditions. DF From: Susan Scott/ENRON@enronXgate …

  18. 26 Mar 2001

    Drew Fossum to Susan M Scott and 4 more

    Re: Red Rock posting

    Here are my comments--I'd like to take out the stuff about the rate and any implication that we have flexible terms and conditions. DF From: Susan Scott/ENRON@enronXgate …

  19. 24 Mar 2001

    Drew Fossum to Susan M Scott and 2 more

    Re: Red Rock shipper letter

    Good--the "to the extent that" phrase is appropriately ambiguous on what actually happened--should make Harris happy. DF From: Susan Scott/ENRON@enronXgate on 03/23/2001 …

  20. 23 Mar 2001

    Drew Fossum to Dorothy McCoppin and 20 more

    RE: Section 5 Argument of Segmentation Brief

    The author was obviously not aware that the Enron pipelines pride themselves in having standardized our "operational nuisances" !! df From: Dorothy McCoppin/ENRON@enronXg…

  21. 23 Mar 2001

    Drew Fossum to Susan M Scott and 2 more

    Re: Red Rock shipper letter

    Good--the "to the extent that" phrase is appropriately ambiguous on what actually happened--should make Harris happy. DF From: Susan Scott/ENRON@enronXgate on 03/23/2001 …

  22. 23 Mar 2001

    Drew Fossum to Dorothy McCoppin and 20 more

    RE: Section 5 Argument of Segmentation Brief

    The author was obviously not aware that the Enron pipelines pride themselves in having standardized our "operational nuisances" !! df From: Dorothy McCoppin/ENRON@enronXg…

  23. 23 Mar 2001

    Drew Fossum to Susan M Scott and 6 more

    Re: TW posting procedures

    I'm good with it, but have one question. In par. 2, does the reference to Sec. 13 of the tariff incorporate the lottery method? I think that's what we are getting at with…

  24. 22 Mar 2001

    Drew Fossum to Susan M Scott and 6 more

    Re: TW posting procedures

    I'm good with it, but have one question. In par. 2, does the reference to Sec. 13 of the tariff incorporate the lottery method? I think that's what we are getting at with…

  25. 21 Mar 2001

    Drew Fossum to Susan M Scott

    U.S. Gypsum request for capacity

    Lets talk tomorrow about the whole basket of TW issues, including this one. thanks. df