Enron email

Algorithmic Indexing

9 messages for to:stephen.stock@enron.com from:louise.kitchen@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:louise.kitchen@enron.com means Louise Kitchen (louise.kitchen@enron.com).

to:stephen.stock@enron.com means Stephen Stock (stephen.stock@enron.com).

  1. 9 Oct 2001

    Louise Kitchen to Stephen Stock

    RE: Budget

    Those guys will do the full horizontals too wherever possible - I'll do the others

  2. 26 Sep 2001
  3. 26 Sep 2001

    Louise Kitchen to Stephen Stock

    RE: Budget

    I was sort of assuming Sally would bring this with her to the meeting. Am I wrong?

  4. 17 Apr 2001

    Louise Kitchen to Zhiyong Wei, Geoff Storey and 6 more

    Re: GTV weekly status update

    I'm a bit confused - I think that the current document distributed for circulation is too small. I would suggest this be abandonned and a next draft produced which includ…

  5. 17 Apr 2001

    Louise Kitchen to Zhiyong Wei and 10 more

    Re: GTV weekly status update

    Who is responsible for the upgrade and do we have a plan in place to implement this? From: Zhiyong Wei/ENRON@enronXgate on 04/16/2001 06:30 PM To: Louise Kitchen/HOU/ECT@…

  6. 27 Mar 2001

    Louise Kitchen to Zhiyong Wei and 10 more

    GTVII

    Zhiyong Thanks for getting me the signed (so far) copy. (Beth and Philippe, please sign the document today ). When they have signed please recirculate the final signed co…

  7. 27 Mar 2001

    Louise Kitchen to Zhiyong Wei and 10 more

    GTVII

    Zhiyong Thanks for getting me the signed (so far) copy. (Beth and Philippe, please sign the document today ). When they have signed please recirculate the final signed co…

  8. 19 Mar 2001

    Louise Kitchen to Zhiyong Wei and 10 more

    RE: GTV II

    Comments: Zhiyong Wei to be added to signature lists. Timeline to include production dates - ie include UAT and production roll-out dates. Dependencies - where there are …

  9. 19 Mar 2001

    Louise Kitchen to Zhiyong Wei and 10 more

    RE: GTV II

    Comments: Zhiyong Wei to be added to signature lists. Timeline to include production dates - ie include UAT and production roll-out dates. Dependencies - where there are …