to:rich.jolly@enron.com means Rich Jolly (rich.jolly@enron.com).
-
31 May 2001
Darrell Schoolcraft to Kenneth Young and 38 more
Re: TW 1090 Project Schedule - Stations 1-4
We need know everyday units need to be taken down and for how long. Depending on system conditions we may have to allocate. DS From: Kenneth Young 05/31/2001 09:36 AM To:…
-
31 May 2001
Darrell Schoolcraft to Kenneth Young and 38 more
Re: TW 1090 Project Schedule - Stations 1-4
Ken, We currently have a unit down at Station 4. If you need to work on something now is the time to do it and not wait until June. DS From: Kenneth Young 05/30/2001 11:5…
-
31 May 2001
Darrell Schoolcraft to Kenneth Young and 38 more
Re: TW 1090 Project - Stations 1-4
What is the time frame these units need to be down. There are no postings for volume deductions. Please someone give me some ideas. Thanks Ds From: Kenneth Young 05/30/20…
-
24 May 2001
Darrell Schoolcraft to james.moore@enron.com and 26 more
Re: Concern - Possible Change In Smartpigging Dates
Right now it looks like we can run station 9, station 7, station 6 or station 5. We will just have to see what we have scheduled for the day. This will allow us to set ou…
-
24 May 2001
Darrell Schoolcraft to Arnie Bailey and 22 more
Re: Concern - Possible Change In Smartpigging Dates
You are correct looking at the models Ken Chow ran before he left was between 175 to 225 this will allow the pig to move approx. between 5 to 6 miles an hour. DS From: Ar…
-
24 May 2001
Larry Campbell to Michael Adewumi and 14 more
RE: status, PCB pipeline modeling study
Michael, I will be discussing with John and others in the near future about the status of the study. When will your progress report be ready for review? It might be a goo…
-
24 May 2001
Darrell Schoolcraft to Max Brown and 22 more
Re: Concern - Possible Change In Smartpigging Dates
Is there a reason we think we will need to run station 8. I think with the volumes we will have to move to insure 6 miles and hour for the smart pig will be approx. 100 t…
-
24 May 2001
Larry Campbell to Byron Rance and 10 more
Re: Building Colors
Byron/Tiny, I spoke to Ken Jacobs with the Forest Service and have attached his e mail below concerning the Forest Sevice's choice for the building. I have informed him t…
-
24 May 2001
Michael Adewumi to Larry Campbell and 14 more
RE: status, PCB pipeline modeling study
Hi Larry: Sorry for the delayed response. I have just got back from an overseas trip yesterday. I am in the process of preparing a progress report for you. We have obtain…
-
21 May 2001
Larry Campbell to team.flagstaff-sta2@enron.com, Team Flagstaff and 8 more
Tree Removal, Sta. 2
I spoke with Ken Jacobs, with the Forest Service in Flagstaff, concerning his agencies approval for the turbine construction at Station 2. As a condition of the approval …
-
21 May 2001
Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 13 more
PG&E Samples
See attached PG&E sample results.
-
18 May 2001
Larry Campbell to Lorraine Lindberg, Team Laguna, Team Mountainair and 4 more
RE: PCB sampling at Rio Puerco
Laguna and or Moutainair team, because I dont know which team is responsible for the Belen delivery point, would someone check on liquids at this location and if present,…
-
17 May 2001
Kim Ladish to Rich Jolly, David Roensch, Larry Campbell and 3 more
FW: June 18 - 20 Flagstaff Trip
Hi guys! The itinerary for Randy and John is attached for your June 18 - 20 trip. Thank you, Kim Ladish 713-345-5863 SERVICE DATE FROM TO DEPART ARRIVE AMERICA WEST AIRLI…
-
15 May 2001
Peter R. Stark to Max Brown, John Keller, Morgan Gottsponer and 13 more
RE: Rough Estimate of Costs For Possible TW MAOP Upgrade - 30" Mainline & Loop Lines Sta 5 to Colorado River
Max, As an alternative to replacing pipe can we consider applying Armour Plate wrap? Peter. Eur Ing Peter R. Stark CEng BSc, BA, MSc, MIM, SenMWeldI, MIMarE. MICorr. Tel:…
-
14 May 2001
Larry Campbell to Louis Soldano, John Shafer, William Kendrick and 3 more
RE: status, PCB pipeline modeling study
Louie, after the presentation MIchael gave, there were some issues about the data and predictions ie., like how much solvent do we really need to clean the pipeline and t…
-
11 May 2001
Larry Campbell to team.flagstaff-sta2@enron.com, Team Flagstaff, team.kingman-sta1@enron.com and 6 more
pollution Prevention Training
Under the regulations of the state of Arizona, facilities which have a pollution prevention plan (sta.1, sta. 2 and Needles) are required to have an annual training to ev…
-
11 May 2001
Larry Campbell to Edward Attanasio and 8 more
Re: Bakersfield Environmental Action Items
Ed, I would appreciate it very much if you would review the action item list from Scott Jones and choose which items are Koch's responsibility and which items belong to E…
-
11 May 2001
Larry Campbell to Louis Soldano, Edward Attanasio, scott.jones@enron.com and 4 more
Bakersfield Environmental Action Items
Louie/Ed I know you guys are busy, but because of the emphasis Enron places on ensuring that action items from consolidated audits are completed prior to the action item …
-
11 May 2001
Edward Attanasio to Larry Campbell and 8 more
Re: Bakersfield Environmental Action Items
Sorry I have not responded sooner, but I've been tied up with the crude lines transaction. The mercury contamination by the old meter shop and hydrocarbon contamiantion a…
-
10 May 2001
Ray Smith to Jerry D. Martin and 34 more
Red Rock Weekly Report
1. ACTIVITIES: a. Successful visit to Nuovo Pignone in Italy this week by a team consisting of representatives from E&C, GE and the engineering contractor, UEI. Most of t…
-
8 May 2001
Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 13 more
PG&E Sample Report
See attached for liquids gathered for this months sample run. Results will follow.
-
7 May 2001
Max Brown to John Keller, Morgan Gottsponer, Kevin Hyatt and 13 more
Rough Estimate of Costs For Possible TW MAOP Upgrade - 30" Mainline & Loop Lines Sta 5 to Colorado River
As I will be out of town at Gallup NM this week for the excavations planned for TW L-154 line, I will will miss the the meeting on the 10th. I have begun preparation of a…