Enron email

Algorithmic Indexing

16 messages for to:perry.frazier@enron.com from:darrell.schoolcraft@enron.com from:darrell.schoolcraft@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:darrell.schoolcraft@enron.com means Darrell Schoolcraft (darrell.schoolcraft@enron.com).

to:perry.frazier@enron.com means Perry Frazier (perry.frazier@enron.com).

  1. 10 Mar 2002

    Darrell Schoolcraft to Ramona Betancourt, Perry Frazier

    Re: TW Displacement Pointss

    Talk to tk but I think these will be fine. Ds -------------------------- Sent from my BlackBerry Wireless Handheld (www.BlackBerry.net)

  2. 10 Mar 2002

    Darrell Schoolcraft to Ramona Betancourt, Perry Frazier, TK Lohman

    Re: TW IT contracts - System implementation issues

    I think these will be just fine. Ds -------------------------- Sent from my BlackBerry Wireless Handheld (www.BlackBerry.net)

  3. 25 Feb 2002
  4. 24 Jan 2002
  5. 24 Jan 2002
  6. 11 Jan 2002

    Darrell Schoolcraft to Lorraine Lindberg, Perry Frazier

    RE: Duke/Pampa

    Yes I can. Let me know when this is finalized. ds

  7. 30 Aug 2001

    Darrell Schoolcraft to Karen Brostad, Elizabeth Brown, John Buchanan and 25 more

    RE: Change for Oneok Interconnect( Oneok Ward County)

    POI 500168 has been changed in CAS to 200,000 both receipt and delivery. DS

  8. 29 Aug 2001

    Darrell Schoolcraft to Karen Brostad and 8 more

    One Oak Ward County

    Can we use a summation meter for the POI 500168 Westar Ward County Meter # 9089 and Meter # 10187 We can make this a bi-directional point in our system. This will make it…

  9. 29 Jun 2001

    Darrell Schoolcraft to Lindy Donoho, Ramona Betancourt, Jeanne Licciardo and 4 more

    RE: Operational/Design Capacity Requirements from Order 637

    I agree with lindy that non-physical points be excluded. DS

  10. 28 Jun 2001
  11. 20 Jun 2001
  12. 24 May 2001

    Darrell Schoolcraft to james.moore@enron.com and 26 more

    Re: Concern - Possible Change In Smartpigging Dates

    Right now it looks like we can run station 9, station 7, station 6 or station 5. We will just have to see what we have scheduled for the day. This will allow us to set ou…

  13. 24 May 2001

    Darrell Schoolcraft to Arnie Bailey and 22 more

    Re: Concern - Possible Change In Smartpigging Dates

    You are correct looking at the models Ken Chow ran before he left was between 175 to 225 this will allow the pig to move approx. between 5 to 6 miles an hour. DS From: Ar…

  14. 24 May 2001

    Darrell Schoolcraft to Max Brown and 22 more

    Re: Concern - Possible Change In Smartpigging Dates

    Is there a reason we think we will need to run station 8. I think with the volumes we will have to move to insure 6 miles and hour for the smart pig will be approx. 100 t…

  15. 22 Feb 2001

    Darrell Schoolcraft to Perry Frazier and 8 more

    Re: BP WTX to Oasis

    Current operating Capacity of the Oasis Lateral is 340,000 mmbtu/d. We need to be careful that we don't oversell our capacity. DS

  16. 8 Nov 2000

    Darrell Schoolcraft to Bob Burleson and 10 more

    Re: EOG Pronghorn Location

    Can we Gas Control make an assumption that no gas will flow until EFM is installed. We need this info. to balance our system. DS