Enron email

Algorithmic Indexing

131 messages for to:mark.walker@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

20 more fall outside these years.

to:mark.walker@enron.com means Mark V Walker (mark.walker@enron.com).

  1. 12 Jul 2002

    Kurt Anderson to gverkleeren@zilkha.com and 18 more

    Re: FW: RE: Revised Availability Numbers

    Gary, thank you very much for your feedback. I apologize for the content of the reports sent to you yesterday. With respect to the content of those reports, it is obvious…

  2. 12 Jul 2002
  3. 11 Jul 2002

    Jeff Duff to gverkleeren@zilkha.com and 10 more

    Re: Re-calculation of Monthly Availability (Mill Run/Somerset)

    Gary, The following update preceeds the summary sent yesterday. This summary included the breakout of the MT credit, which will be included in the next owner report. Plea…

  4. 10 Jul 2002

    Jeff Duff to gverklern@zilkha.com and 10 more

    Re-calculation of Monthly Availibility (Mill Run/Somerset)

    Gary, On behalf of the GEWE Systems Performance team, please find a re-calculation of Monthly Availability for both the Mill Run and Somerset projects. The following work…

  5. 10 Jul 2002

    Mark Fisher to Kurt Anderson and 4 more

    Re: Mill Run report through May with Virtual Mode corrections.

    On a per turbine basis he would be expecting some to have big drops. However for the entire site, the amount we were talking about would be about .5% (for 1 month). Thoug…

  6. 10 Jul 2002

    Kurt Anderson to Jeff Duff, Mark V Walker, Mark Fisher

    Mill Run report through May with Virtual Mode corrections.

    If we are only talking about a .6% drop in avg. availability, we had better be ready to defend our numbers. Not just defend but convince Zilkha why we are right with our …

  7. 10 Jul 2002

    Claire Soares to alan.nueman@enron.com, becky.radovich@enron.com, becky.bayne@enron.com and 58 more

    Kevin's lunch

    Hi all, Reminder. Tomorrow. Noon. Domingo's. See you there. Claire

  8. 10 Jul 2002

    Christy Wire to alan.nueman@enron.com, becky.radovich@enron.com, becky.bayne@enron.com and 58 more

    Kevin's Lunch

    You are cordially invited to a luncheon in honor of Kevin Cousineau in order to say farewell. Kevin's last day will be Friday, July 12th. Please see e-mail below for deta…

  9. 10 Jul 2002

    John M Ruiz to Jeff Duff, Mark V Walker, Mark Fisher and 1 more

    (no subject)

    The Weekly Availabilty Status report and excel files are located at Eng_server:\\ Field Support \ Friday_Report \ -jr

  10. 9 Jul 2002

    John M Ruiz to Mark V Walker, Jeff Duff, Mark Fisher and 1 more

    SCADA Green Power

    The field reports that there was no data for the month of May for Green Power 3 (WECS 28). June is OK Alos, the SCADA computer for Green Power 2 (WECS 67) has been down a…

  11. 9 Jul 2002

    John M Ruiz to Mark V Walker, Jeff Duff, Mark Fisher and 1 more

    VisuPro site numbers

    FYI, You need to edit the phone number for each of the sites by adding a 9 to dial out. If you need help doing this come get me. -J

  12. 8 Jul 2002

    Kurt Anderson to gverkleeren@zilkha.com and 10 more

    Re: Monthly Reporting

    Gary, I apologize for the delay, our goal is to provide validated data for the January through May period by Wednesday, July 10th. At my request, upon Mark Fisher's retur…

  13. 8 Jul 2002

    Jeff Duff to Mark Fisher, Mark V Walker, Matthew Meyers and 1 more

    Visupro

    I will be getting a Visupro CD from Joe Chapman today. We can install it ourselves since it is an internal product and GEWE has the license. JD

  14. 5 Jul 2002

    Ronald Brzezinski to Jeff Duff and 32 more

    Re: New Download tool

    Jeff, We will work with you and the site operators to ensure the new system is performing as expected, and the site operators have sufficient documentation to use this to…

  15. 5 Jul 2002

    Jeff Duff to bo.thisted@enron.com, flemming.pedersen@enron.com, John Nemila and 20 more

    New Download tool

    It was brought to our attention that there was confusion downloading the wind data using the new Download tool deployed by the SCADA team. To ensure we do not loose any d…

  16. 3 Jul 2002

    John M Ruiz to Mark V Walker, Jeff Duff, Mark Fisher

    Uploads

    Lake Benton 1, Strom Lake 2, VGR, 750kw STAR data is complete. The Mon0206 file for all of June have been uploaded to STAR: Fenner Klondike Mill Run Monfort Somerset Tren…

  17. 3 Jul 2002

    Jeff Duff to Mark V Walker, Mark Fisher

    Desert Sky Warranty Aggreements

    I've place electronic copies of the Desert Sky warranty agreement on the service2 network under the TSA_and_aggreement folder for Desert Sky. JD

  18. 3 Jul 2002

    John M Ruiz to flemming.pedersen@enron.com and 6 more

    Minana files

    Flemming, In reviewing the Klondike visupro files for processing for the month of June, there are minana.db files missing. These files contain 8 days of records which get…

  19. 3 Jul 2002

    John M Ruiz to Jeff Duff, Mark Fisher, Mark V Walker and 1 more

    Printers

    Due to the network cabling, printers are currently not available. -John

  20. 2 Jul 2002

    Matthew Meyers

    Meyers out of office

    Greetings, Karol, kids, and I will be traveling over the 4th and beyond. Here is my schedule and contact numbers (starting with 7/1 for Julie's attendance records): Work …

  21. 28 Jun 2002

    Patricia Hunter to Mark V Walker and 6 more

    Re: New 6.1 Version of SPLUS will be shipped soon.

    We have the new software. Rabi will load SPlus and Oracle on his and my system to make sure he does not encounter any problems with the new GE Core Load. Once our test is…

  22. 27 Jun 2002

    Joe Chapman to Mark V Walker and 8 more

    Operating State 29

    Mark, The operating state codes 2 to 6 represent manual pitch overide. The user can issue these pitch overides from the "Control blade angle" screen as shown in Figure-1.…

  23. 27 Jun 2002

    Jeff Duff to Mark V Walker, Mark Fisher

    Total Down Time

    As a verification of understanding; Total Down Time = TO - (DT + RT +LOT + MT + EST + WOT) Where TO = Total possible survey time. Thanks, Jeff

  24. 26 Jun 2002

    John M Ruiz to Matt Allsup, ronda.foster@enron.com, richard.soles@enron.com and 18 more

    VisuPro data for June 2002

    Please be advised. The VisuPro download to cd for June SCADA data should be done on Monday, July 1 and sent to Tehachapi as "Next Day Delivery." The files needed for mont…

  25. 26 Jun 2002

    Jeff Duff to julie.johnson@enron.com and 8 more

    Work request

    Julie, Could you print off the current work request report by 1:30 today? Gentlemen, I'd like to review this today at 1:30 in our office. Also, could you provide me with …