to:larry.campbell@enron.com means Larry Campbell (larry.campbell@enron.com).
-
29 Jul 2001
David Roensch to Larry Campbell, John Shafer
(no subject)
Larry, per our phone conversation tonight. I found this article interesting, especially in light of potential future expansions on TW. Note the section below in bold Red …
-
27 Jul 2001
Marc Phillips to allan.schoen@enron.com, dan.holli@enron.com, jacob.krautsch@enron.com and 14 more
oil & gas, transmission & storage MACT regulations
FYI. I have updated the environmental notices regarding the oil & gas, transmission & storage MACT regulations on the EH&S web site to reflect the recent technical change…
-
26 Jul 2001
George Robinson to david cobrain and 6 more
TW Roswell Station - Characterization Plan
David- Two files are attached. The first file is the text and figures of a plan for characterizing impacted soil in the former surface impoundment areas. The second file …
-
26 Jul 2001
John Shafer to Kevin Hyatt, Larry Campbell and 4 more
RE: Project Sun Devil EIS
Kevin, I am still working with the Arizona Chapter of TNC to get the information I was looking for. However, preliminary talks is that there are no show-stoppers from the…
-
25 Jul 2001
Edward Attanasio to scott.jones@enron.com, Molly Sample, Louis Soldano and 3 more
NCL Soil Contamination -- Indemnity Demand
Please comment on the attached proposed letter to Koch. Scott, could you also forward a copy to Jeff Gurican at Processes for his feedback? Thanks.
-
25 Jul 2001
Re: EOTT Crude Oil Tanks
Larry, This is what I have for the crane area. Mc Elroy Tank pumps about 7,000 bls a day Tank capacity is 5,000bls McAfee Tank pumps over 500 bls a day Tank capacity is 1…
-
24 Jul 2001
Robert Foree to Larry Campbell
Midland Team EOTT Oil Tanks
Station Tank # Tank Size Avg Daily Throughput Driver 56002 66,000 3,600 Garden City 56003 30,000 533 Wildfire 1524 10,000 1,000 Windham 1445 10,000 2,500 Mungalo 1516 15,…
-
19 Jul 2001
Team Eunice-Kermit to Larry Campbell
Re: EOTT Crude Oil Tanks
Larry this is for the Kermit Team 1. Lea Hendrick 260 80,000 BBL. Tank 16,032 BBls/d No serial number. 2. Hendrick Quito 58044 20,000BBL. Tank 39,44 BBls/d No serial numb…
-
19 Jul 2001
EOTT crude oil tanks
Larry we have one tank at Ozona that has greater than 500 bbls per day throughput the tank number is 1439 the serial number is BM2418 the Diameter is 100' hight is 50' an…
-
18 Jul 2001
Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 13 more
Sample run results
See attached for sample results for this months sample run. Larry I think the reson we got NDs on our samples is because the lab raised the reporting limit due to dilutio…
-
12 Jul 2001
Bill Glushko to Larry Campbell
EOTT P/L tank list , fees (revised 7-12)
Revised listing, assumes SIC 4612 only. For rationale for not classifying as 5171, please see Memo, para. 2. Currently, I'm collecting required info so that the TNRCC Reg…
-
11 Jul 2001
Rich Jolly to Arnie Bailey, Rick Smith, David Roensch and 89 more
San Juan Team Advisor
Effective July 2nd David (Tiny) Roensch) accepted the responsibilities of being the Advisor for the San Juan Team. He will be the Advisor for the Kingman, Flagstaff and S…
-
11 Jul 2001
Will Shutt to sm2@ev.state.az.us and 2 more
Transwestern Pipeline Company Kingman and Flagstaff Compressor Stations Netting Calculations
Shudeish, Per your request, Argent has prepared revised netting calculations for the Transwestern Pipeline Company Kingman and Flagstaff Compressor Stations. The revised …
-
6 Jul 2001
George Robinson to wolson@state.nm.us and 2 more
TW Roswell Station - Characterization Plan
Bill- Two files are attached. The first file is the text and figures of a plan for characterizing impacted soil in the former surface impoundment areas. The second file c…
-
3 Jul 2001
James R Lawrence to Larry Campbell and 8 more
Re: field visit of EOTT tanks
Larry Campbell 07/03/2001 04:06 PM To: Team Andrews/ET&S/Enron@ENRON, Team Spraberry@Enron, Myron Maresch@eott.com cc: James R Lawrence/ET&S/Enron@Enron, Scott Clark/OTS/…