  1. 10 Jul 2002

    Claire Soares to alan.nueman@enron.com, becky.radovich@enron.com, becky.bayne@enron.com and 58 more

    Kevin's lunch

    Hi all, Reminder. Tomorrow. Noon. Domingo's. See you there. Claire

  2. 10 Jul 2002

    Christy Wire to alan.nueman@enron.com, becky.radovich@enron.com, becky.bayne@enron.com and 58 more

    Kevin's Lunch

    You are cordially invited to a luncheon in honor of Kevin Cousineau in order to say farewell. Kevin's last day will be Friday, July 12th. Please see e-mail below for deta…

  3. 5 Jul 2002

    Ronald Brzezinski to Jeff Duff and 32 more

    Re: New Download tool

    Jeff, We will work with you and the site operators to ensure the new system is performing as expected, and the site operators have sufficient documentation to use this to…

  4. 5 Jul 2002

    Jeff Duff to bo.thisted@enron.com, flemming.pedersen@enron.com, John Nemila and 20 more

    New Download tool

    It was brought to our attention that there was confusion downloading the wind data using the new Download tool deployed by the SCADA team. To ensure we do not loose any d…

  5. 3 Jul 2002

    John M Ruiz to flemming.pedersen@enron.com and 6 more

    Minana files

    Flemming, In reviewing the Klondike visupro files for processing for the month of June, there are minana.db files missing. These files contain 8 days of records which get…

  6. 26 Jun 2002

    John M Ruiz to Matt Allsup, ronda.foster@enron.com, richard.soles@enron.com and 18 more

    VisuPro data for June 2002

    Please be advised. The VisuPro download to cd for June SCADA data should be done on Monday, July 1 and sent to Tehachapi as "Next Day Delivery." The files needed for mont…

  7. 19 Jun 2002

    Jeri Fish to jerry.holt@enron.com, naomi.brown@enron.com, John Nemila and 59 more

    SIX SIGMA

    Ladies and Gentlemen, Many of you have received the Six Sigma Green Belt Training CD. If you have not, contact your supervisor or Jeri Fish to obtain a copy. All salaried…

  8. 19 Jun 2002

    Hollis Kimbrough to elliott.fong@enron.com, mike.lewis@enron.com and 12 more

    Old VG SPC Results

    Attached please find a new Statistical Process Control analytic which displays the turbine performance for your site. The report pdf is a summary of the other two reports…

  9. 17 Jun 2002

    Joe Thorpe to Kurt Anderson, Mark Fisher, Hollis Kimbrough and 5 more

    Meeting with Gary

    Kurt, As requested here is a brief overview of the discussion between Mark Fisher , myself and Gary Verklereen that took place on 6/13/02 & 6/14/02 regarding availability…

  10. 14 Jun 2002

    Tim Mohammed to Joe Thorpe and 16 more

    Zilkha Availability

    Joe, Lets not forget that we had measure problems due to failing MS3 relay in the SEG converter, which caused the crow bar to engage, which in turn forced CB1 to fault. C…

  11. 13 Jun 2002

    Joe Thorpe to Kurt Anderson, Kevin Cousineau, Tim Mohammed and 10 more

    Zilkha Availability

    Kurt, Per our phone conversation, Mark Fisher and myself have been discussing availability with Gary from Zilkha. A question arose regarding the many operations of our br…

  12. 13 Jun 2002

    Shirley Peters to pat.weaver@enron.com, norm.phillips@enron.com, phil.waddell@enron.com and 50 more

    Fax Number 661.823.6752

    FYI - Fax number 661.823.6752 will change tomorrow 06/14/02 to 661.823.6428. I do not have a definite time that this change will happen tomorrow, but it will take place s…

  13. 29 May 2002

    Mark V Walker to Joe Thorpe and 4 more

    Re: Preliminary results from analysis of Visupro data for 5/17/02 time period that Gary Verkleeren asked about

    I just noticed that I referred to month 5 in some of the dates in memo0529AEP. My apologies. Below is a corrected version that replaces the previous memo0529AEP.

  14. 29 May 2002

    Mark V Walker to Joe Thorpe and 4 more

    Preliminary results from analysis of Visupro data for 5/17/02 time period that Gary Verkleeren asked about

    Joe, See the file Memo0529AEP. Is there a simple explanation for why the system OK counter continued to increment 44.7 hrs when the turbine blades were pitched out to 80 …

  15. 29 May 2002

    Kurt Anderson to Benjamin Bell and 16 more

    Re: FW: GEWE reporting and follow-up

    Ben, Rick Winsor's note below has prompted me to provide a timeline with regards to the issue of Zilka's concerns with our Availability calculations. 5/2/02 Rick Winsor s…

  16. 14 May 2002

    Jeff Maurer to mike.westbeld@enron.com, craig.christenson@enron.com, Kevin Cousineau and 51 more

    Lessons Learned Matrix for 2001 Projects

    All, Attached is the Lessons Learned matrix developed from our meeting last week. I want to thank everyone who participated. There were some who wanted to attend but coul…

  17. 16 Apr 2002

    Joe Chapman to john.admire@enron.com, stan.ballard@enron.com, Benjamin Bell and 13 more

    Storm Lake 1 & 2 SCADA password changed

    The new password for Storm Lake 1 is: office The new password for Storm Lake 2 is: window Joe

  18. 12 Mar 2002

    Ed Agner to Ronald Brzezinski and 40 more

    SCADA Requirements

    Ron, The training department has already provided recommended changes and additions to Joe. If you do not have a copy, let me know and we will send them to you. I think t…