5 more fall outside these years.
to:john.nemila@enron.com means John Nemila (john.nemila@enron.com).
-
10 Jul 2002
Claire Soares to alan.nueman@enron.com, becky.radovich@enron.com, becky.bayne@enron.com and 58 more
Kevin's lunch
Hi all, Reminder. Tomorrow. Noon. Domingo's. See you there. Claire
-
10 Jul 2002
Christy Wire to alan.nueman@enron.com, becky.radovich@enron.com, becky.bayne@enron.com and 58 more
Kevin's Lunch
You are cordially invited to a luncheon in honor of Kevin Cousineau in order to say farewell. Kevin's last day will be Friday, July 12th. Please see e-mail below for deta…
-
5 Jul 2002
Ronald Brzezinski to Jeff Duff and 32 more
Re: New Download tool
Jeff, We will work with you and the site operators to ensure the new system is performing as expected, and the site operators have sufficient documentation to use this to…
-
5 Jul 2002
Jeff Duff to bo.thisted@enron.com, flemming.pedersen@enron.com, John Nemila and 20 more
New Download tool
It was brought to our attention that there was confusion downloading the wind data using the new Download tool deployed by the SCADA team. To ensure we do not loose any d…
-
3 Jul 2002
John M Ruiz to flemming.pedersen@enron.com and 6 more
Minana files
Flemming, In reviewing the Klondike visupro files for processing for the month of June, there are minana.db files missing. These files contain 8 days of records which get…
-
26 Jun 2002
John M Ruiz to Matt Allsup, ronda.foster@enron.com, richard.soles@enron.com and 18 more
VisuPro data for June 2002
Please be advised. The VisuPro download to cd for June SCADA data should be done on Monday, July 1 and sent to Tehachapi as "Next Day Delivery." The files needed for mont…
-
19 Jun 2002
Jeri Fish to jerry.holt@enron.com, naomi.brown@enron.com, John Nemila and 59 more
SIX SIGMA
Ladies and Gentlemen, Many of you have received the Six Sigma Green Belt Training CD. If you have not, contact your supervisor or Jeri Fish to obtain a copy. All salaried…
-
19 Jun 2002
Hollis Kimbrough to elliott.fong@enron.com, mike.lewis@enron.com and 12 more
Old VG SPC Results
Attached please find a new Statistical Process Control analytic which displays the turbine performance for your site. The report pdf is a summary of the other two reports…
-
17 Jun 2002
Joe Thorpe to Kurt Anderson, Mark Fisher, Hollis Kimbrough and 5 more
Meeting with Gary
Kurt, As requested here is a brief overview of the discussion between Mark Fisher , myself and Gary Verklereen that took place on 6/13/02 & 6/14/02 regarding availability…
-
14 Jun 2002
Tim Mohammed to Joe Thorpe and 16 more
Zilkha Availability
Joe, Lets not forget that we had measure problems due to failing MS3 relay in the SEG converter, which caused the crow bar to engage, which in turn forced CB1 to fault. C…
-
13 Jun 2002
Joe Thorpe to Kurt Anderson, Kevin Cousineau, Tim Mohammed and 10 more
Zilkha Availability
Kurt, Per our phone conversation, Mark Fisher and myself have been discussing availability with Gary from Zilkha. A question arose regarding the many operations of our br…
-
13 Jun 2002
Shirley Peters to pat.weaver@enron.com, norm.phillips@enron.com, phil.waddell@enron.com and 50 more
Fax Number 661.823.6752
FYI - Fax number 661.823.6752 will change tomorrow 06/14/02 to 661.823.6428. I do not have a definite time that this change will happen tomorrow, but it will take place s…
-
29 May 2002
Mark V Walker to Joe Thorpe and 4 more
Re: Preliminary results from analysis of Visupro data for 5/17/02 time period that Gary Verkleeren asked about
I just noticed that I referred to month 5 in some of the dates in memo0529AEP. My apologies. Below is a corrected version that replaces the previous memo0529AEP.
-
29 May 2002
Mark V Walker to Joe Thorpe and 4 more
Preliminary results from analysis of Visupro data for 5/17/02 time period that Gary Verkleeren asked about
Joe, See the file Memo0529AEP. Is there a simple explanation for why the system OK counter continued to increment 44.7 hrs when the turbine blades were pitched out to 80 …
-
29 May 2002
Kurt Anderson to Benjamin Bell and 16 more
Re: FW: GEWE reporting and follow-up
Ben, Rick Winsor's note below has prompted me to provide a timeline with regards to the issue of Zilka's concerns with our Availability calculations. 5/2/02 Rick Winsor s…
-
14 May 2002
Jeff Maurer to mike.westbeld@enron.com, craig.christenson@enron.com, Kevin Cousineau and 51 more
Lessons Learned Matrix for 2001 Projects
All, Attached is the Lessons Learned matrix developed from our meeting last week. I want to thank everyone who participated. There were some who wanted to attend but coul…
-
16 Apr 2002
Joe Chapman to john.admire@enron.com, stan.ballard@enron.com, Benjamin Bell and 13 more
Storm Lake 1 & 2 SCADA password changed
The new password for Storm Lake 1 is: office The new password for Storm Lake 2 is: window Joe
-
12 Mar 2002
Ed Agner to Ronald Brzezinski and 40 more
SCADA Requirements
Ron, The training department has already provided recommended changes and additions to Joe. If you do not have a copy, let me know and we will send them to you. I think t…