to:jalstad@ensr.com means Jon Alstad (jalstad@ensr.com).
-
28 Sep 2001
Larry Campbell to alstad@enron.com, Jon Alstad and 14 more
RE: Review Draft - Sundevil Fatal Flaw Analysis/Briefing Report
Jon, I was referring to the actual monument site, not all lands dedicated to the monument by BLM, which occur for several miles on both sides of I-17. I was under the imp…
-
26 Sep 2001
Larry Campbell to Scott Patti and 16 more
RE: Review Draft - Sundevil Fatal Flaw Analysis/Briefing Report
Scott, I shold probably clearify something. The existing right of way, which we intend on staying in, at least around Cordes Junction is located west of I-17, which will …
-
26 Sep 2001
Scott Patti to Larry Campbell and 2 more
RE: Additional Note
Absolutely - we can outline what it would take. Greg Simmons definitely said that it would be a congressional decision in D.C. - I asked him "what about the 'energy initi…
-
26 Sep 2001
Larry Campbell to Scott Patti and 16 more
Re: Additional Note
Thanks Scott, I heard about the same thing, and was checking futrher to see if this was actually the case.... "Patti, Scott" <SPatti@ensr.com> on 09/25/2001 08:35:35 PM T…
-
25 Sep 2001
Scott Patti to John Shafer and 14 more
RE: Review Draft - Sundevil Fatal Flaw Analysis/Briefing Report
Gentlemen, Attached is our work to date (minus the telephone call summary sheets and permit requirement summary sheets [Appendix A] you've already received) on the Fatal …
-
19 Sep 2001
Scott Patti to Larry Campbell and 16 more
T&E species update - Red Rock Mainline Expansion
As an update to many of you, I have been on the phone with Roger Kohn of EPA Region 9 a couple of different times today. It turns out that what they really were expecting…
-
7 Sep 2001
Scott Patti to Larry Campbell and 14 more
RE: Endangered Species Surveys, Red Rock Expansion
Larry, just to keep you posted, Jon has returned from CS 3 and 4. He did not find anything of concern. We are working on the survey report and should have it to you next …