Enron email

Algorithmic Indexing

124 messages for to:hollis.kimbrough@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

11 more fall outside these years.

to:hollis.kimbrough@enron.com means Hollis Kimbrough (hollis.kimbrough@enron.com).

  1. 10 Jul 2002

    Claire Soares to alan.nueman@enron.com, becky.radovich@enron.com, becky.bayne@enron.com and 58 more

    Kevin's lunch

    Hi all, Reminder. Tomorrow. Noon. Domingo's. See you there. Claire

  2. 10 Jul 2002

    Christy Wire to alan.nueman@enron.com, becky.radovich@enron.com, becky.bayne@enron.com and 58 more

    Kevin's Lunch

    You are cordially invited to a luncheon in honor of Kevin Cousineau in order to say farewell. Kevin's last day will be Friday, July 12th. Please see e-mail below for deta…

  3. 9 Jul 2002

    Mark Fisher to Tom Nemila and 2 more

    WR613 Pitch System Performance

    Tom, Attached are the graphs for energy lost due to the pitch and overspeed faults you listed. As I mentioned before the methodology requires decent data recovery for the…

  4. 8 Jul 2002

    Mark Fisher to andre.rast@enron.com and 4 more

    Subset of data with extreme temp

    Andre, Here is a short subset of 10-minute records containing the extreme temperature event (approximately 3 hours of before/after data). The turbine was #105 at Desert S…

  5. 8 Jul 2002

    Mark Fisher to Tom Nemila and 2 more

    Gearbox Temp graphs

    Tom, The graphs attached are formatted the same as the sample set I sent you earlier. As of today, Desert Sky 10-minute data has not been uploaded for June 2002 yet, and …

  6. 8 Jul 2002

    Mark Fisher to Tom Nemila and 2 more

    Gear Box Temp Graphs

    Tom, Here is a sample of the output for this request. For this I have only used May 2002. I for the boxplots one has had records removed when the ambient and gearbox temp…

  7. 5 Jul 2002

    Mark Fisher to Tom Nemila and 2 more

    WR613 Pitch System Performance (Energy)

    Tom, I have energy estimates for May 2002 attached. Graph 1 is site totals, graph 2 is (total lost)/(total actual production) where total actual production is taken from …

  8. 3 Jul 2002

    Mark Fisher to Tom Nemila and 2 more

    WR613 Pitch System Fault Pareto

    Tom, From the stage I was at on the duration and energy it was just as easy to do all 7 sites as the 3 you specifically requested. If you do not want the additional graph…

  9. 3 Jul 2002

    Mark Fisher to Tom Nemila and 2 more

    WR613 Pitch System Performance

    Tom, Here are the new graphs with totals (bar charts) and distributions (boxplots) for all seven sites through May 2002. I believe that I have come up with a method of pr…

  10. 2 Jul 2002

    Mark Fisher to Tom Nemila and 2 more

    WR613 Pitch System Performance

    Tom, Maybe I mis-interpreted again, but here are the graphs for site total (the boxplots are still by turbine). This is for May. I will wait to see if this is more like w…

  11. 2 Jul 2002

    Matthew Meyers

    Meyers out of office

    Greetings, Karol, kids, and I will be traveling over the 4th and beyond. Here is my schedule and contact numbers (starting with 7/1 for Julie's attendance records): Work …

  12. 19 Jun 2002

    Jeri Fish to jerry.holt@enron.com, naomi.brown@enron.com, John Nemila and 59 more

    SIX SIGMA

    Ladies and Gentlemen, Many of you have received the Six Sigma Green Belt Training CD. If you have not, contact your supervisor or Jeri Fish to obtain a copy. All salaried…

  13. 19 Jun 2002

    Hollis Kimbrough to elliott.fong@enron.com, mike.lewis@enron.com and 12 more

    Old VG SPC Results

    Attached please find a new Statistical Process Control analytic which displays the turbine performance for your site. The report pdf is a summary of the other two reports…

  14. 19 Jun 2002

    Hollis Kimbrough to alden.zeitz@enron.com and 12 more

    750 SPC Analytic

    Attached please find a new Statistical Process Control analytic which displays the turbine performance for your site. The report pdf is a summary of the other two reports…

  15. 18 Jun 2002

    Ronald Brzezinski to Mark Fisher and 10 more

    Re: Questions/Observations about VisuPro

    Mark, I'd like to expand on Kevin's explanation: - Time-stamping: If the owner wants Standard time all year and have a 1 hour offset for half the year, that is his decisi…

  16. 18 Jun 2002

    Kevin Cousineau to Hollis Kimbrough, Mark V Walker, Mark Fisher

    Meter Readings

    Guys: Attached are the meter readings for Indian Mesa for both feeders (transformers). They includ the production and the cumsumption, and cover a period between May 19 a…

  17. 18 Jun 2002

    Kevin Cousineau to Mark Fisher and 8 more

    Re: Questions/Observations about VisuPro

    Mark: First, the new version of VisuPro (Version IV) will use standard local time, not daylight time. This means that during the year it will be off by one hour for 1/2 o…

  18. 17 Jun 2002

    Mark V Walker to John M Ruiz, Jeff Duff, Mark Fisher and 3 more

    Six Sigma Pitch

    The attached Powerpoint slide file gives the high level overview of the Six Sigma program as it will be applied at GEWE. The comments I'll give you this afternoon are in …

  19. 17 Jun 2002

    Jeff Maurer to Kurt Anderson, Hollis Kimbrough and 10 more

    Re: CPS curtailment meeting

    Hollis, In your absence, I have decided to appoint Jeff Duff to meet in San Antonio with AEP and CPS to go over curtailment calculation. He will review and familiarize hi…

  20. 17 Jun 2002

    Joe Thorpe to Kurt Anderson, Mark Fisher, Hollis Kimbrough and 5 more

    Meeting with Gary

    Kurt, As requested here is a brief overview of the discussion between Mark Fisher , myself and Gary Verklereen that took place on 6/13/02 & 6/14/02 regarding availability…

  21. 14 Jun 2002

    Kurt Anderson to Hollis Kimbrough and 10 more

    CPS curtailment meeting

    Hollis, we need to determine who from GEWE will attend this meeting. Please discuss this issue with Jeff Maurer on Monday and make the necessary arrangements. On Monday A…

  22. 14 Jun 2002

    Kurt Anderson to Tim Mohammed and 10 more

    Re: Zilkha Availability

    First off I want to thank all for their involvement and assistance in addressing Zilkha's concerns regarding our availability calcs at Mill Run Somerset. The customer is …

  23. 14 Jun 2002

    Tim Mohammed to Mark V Walker, Kevin Cousineau and 8 more

    Re: Zilkha Availability

    Mark, How would the generator run if the PMT breaker tripped? Normally, CB1 will trip for undervolatge due to lose of power. Thanks

  24. 14 Jun 2002

    Mark V Walker to Tim Mohammed and 8 more

    Re: Zilkha Availability

    To cut to the chase....would CB1 fault the turbine when the PMT breaker tripped and if so then would the downtime or line out time availability hour counter be incremente…

  25. 14 Jun 2002

    Tim Mohammed to Joe Thorpe and 16 more

    Zilkha Availability

    Joe, Lets not forget that we had measure problems due to failing MS3 relay in the SEG converter, which caused the crow bar to engage, which in turn forced CB1 to fault. C…