to:david.roensch@enron.com means David Roensch (david.roensch@enron.com).
-
31 Oct 2001
Lee Huber to Lindy Donoho, Rich Jolly, David Roensch and 6 more
RE: Installation of Pigging Facilities
I agree with using your Special Services assessment. It's not an expansion as there is no increase in certificated capacity. So nothing ventured, nothing gained.
-
29 Oct 2001
Darrell Schoolcraft to David Roensch
FW: Texas Monthly November 2001: How Enron Blew It
This came out last week thought you might want to read. DS
-
26 Oct 2001
Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 10 more
Sample Run Report Update.
Here are the results from PG&E. See attached.
-
25 Oct 2001
Jerry Graves to Jesse Alvarado, Roy Armitage, team.artesia@enron.com and 74 more
Albuquerque Region Outage Report Through May2002
Please review the attached outage report. Jerry Graves 713-345-8923
-
25 Oct 2001
Lindy Donoho to Rich Jolly, David Roensch, Lee Huber and 6 more
Installation of Pigging Facilities
I have reviewed the La Plata Facilities O&O Agreement. Lee, could you please review the same and see if you agree with this assessment? It appears to me that the pigging …
-
25 Oct 2001
Kenneth Young to Eric Faucheaux and 22 more
Re: FW: TW Sta. 4 capacity in 3 unit scenario
Just so that everyone is aware, the units at Station 4 can be operated at levels above their rated horsepower of 4,000 during periods of lower ambient temperatures. Clark…
-
24 Oct 2001
Team Gallup to Team San-Juan and 24 more
Re: Pigging San Juan
We received 2 pigs at Gallup today at 1305 MDST with a pressure of 816# and a flow rate of 800 MMCF/D. We had about 2 gallons of black liquid in the receiver barrel. We t…
-
24 Oct 2001
Team San-Juan to Rich Jolly, David Roensch, Rick Smith and 9 more
Pigging San Juan
We kicked two squeegee pigs on the San Juan lateral on 10/24/01 @ 07:45 with a flow rate of 885 and 1173 pressure all pigs were in good shape. Thanks Team San Juan
-
24 Oct 2001
Darrell Schoolcraft to Rich Jolly, David Roensch, Kimberly Watson and 11 more
Station 2 maintenance
The attached was posted to the Transwestern's Web Site. Kim would you distribute to your group. Thanks DS
-
23 Oct 2001
Sharon Brown to Ben Asante, Arnie Bailey, perry.bender@enron.com and 46 more
Oct. 22 log
Sharon Brown ETS Gas Control 713-853-5660
-
19 Oct 2001
Sharon Brown to Ben Asante, Arnie Bailey, perry.bender@enron.com and 46 more
Oct. 18 Log
Sharon Brown ETS Gas Control 713-853-5660
-
18 Oct 2001
Jerry Graves to Jesse Alvarado, Roy Armitage, team.artesia@enron.com and 74 more
Albuquerque Region Outage Report Through May 2002
Please review the attached outage report. Jerry Graves
-
18 Oct 2001
Darrell Schoolcraft to controllers.dl-ets@enron.com and 4 more
Gallup Peaks
When we slow Gallup down or take it down to avoid the electric peaks, please log it. This will help the field to keep track of the days and give Rich Jolly and David Roen…
-
18 Oct 2001
Mike McCracken to Donna Martens and 52 more
Re: Red Rock Regulatory Matrix
Off site fabrication tie-in assemblies and scrubber piping for Station 2 has begun at the contractors yard in Bloomfield, NM. We anticipate on site activities related to …
-
18 Oct 2001
Sharon Brown to Ben Asante, Arnie Bailey, perry.bender@enron.com and 46 more
Oct. 17 Log
Sharon Brown ETS Gas Control 713-853-5660
-
17 Oct 2001
-
17 Oct 2001
Donna Martens to Kelly Allen, Larry Campbell, Earl Chanley and 24 more
Red Rock Regulatory Matrix
Attached is the revised regulatory matrix for Transwestern's Red Rock Expansion project reflecting the notice that tree clearing activities commenced on October 11, 2001 …
-
15 Oct 2001
Team San-Juan to John Sturn, Jesse Alvarado, Steven January and 7 more
Pig San Juan
We kick two squeegee pigs in the San Juan lateral at 07:50 on 10/15/2001 with 1145 psi at a flow rate of 860. The pigs were newly rebuilt and in good shape. We kicked the…
-
15 Oct 2001
Larry Campbell to Shudeish Mahadev and 20 more
Re: Transwestern Alternative Operating Scenario
Shudeish, our advisor in Arizona left me a voice mail message that the signs were posted at both locations...thanks for your help with an expited request to Region IX EPA…
-
15 Oct 2001
Rich Jolly to Team Gallup and 24 more
Re: San Juan Lateral Pigging
Thanks Team Gallup 10/12/2001 10:02 AM To: Rick Smith/ET&S/Enron@Enron, David Roensch/ET&S/Enron@Enron, Rich Jolly/ET&S/Enron@Enron, Team San-Juan/ET&S/Enron@Enron, Team …
-
12 Oct 2001
Team Gallup to Rick Smith, David Roensch, Rich Jolly and 18 more
San Juan Lateral Pigging
The pigs arrived at Gallup about 1:00 pm, and were pulled out of the trap for inspection. We found very little liquid and about a gallon of yellow chalk looking powder. T…
-
12 Oct 2001
-
12 Oct 2001
Rich Jolly to Team Kingman-Needles, team.kingman-sta1@enron.com, team.kingman@enron.com and 19 more
New Interconnects
Help needed from each team. I need a list of all equipment that you will need when we connect a new meter run to our pipeline. All quality equipment for different volumes…
-
11 Oct 2001
Jerry Graves to Jesse Alvarado, Roy Armitage, team.artesia@enron.com and 75 more
Albuquerque Region Outage Report Through May 2002
Please review the attached outage report. Jerry Graves 713-345-8923
-
10 Oct 2001
Jerry Graves to c..alexander@enron.com, Lynn Blair, mike.bonnstetter@enron.com and 76 more
Outage Commericial Review Meeting
FYI, The next Outage Coordination Commercial Review meeting is 10/11/01. The purpose for the meeting is to discuss outages that have a flow impact with the Commercial gro…