  1. 21 Sep 2001

    Doug Cebryk to Eric Gadd, Kevin Hyatt, Jerry D. Martin and 2 more

    Costs/Activities to FERC Filing- Sun Devil

    Gentlemen We have completed the analysis of activities and costs to progress the Sun Devil Project to a FERC Filing by March 30/01 This file details the FERC ACTIVITIES T…

  2. 18 Sep 2001

    Doug Cebryk to John Shafer, Larry Campbell and 8 more

    RE: Additional Cost Estimate - Sun Devil Project

    John I apologize for the tone of my e-mail, but hope you agree that from your e-mail, it could be interpreted that at the last minute, I was asking for a new,comprehensiv…

  3. 13 Sep 2001

    Doug Cebryk to rich.plachy@enron.com, Jerry D. Martin, Kevin Hyatt

    RE: GITA GIS for Oil and Gas meeting

    Rich Thanks for the information. Please contact RUPP AERIAL PHOTOGRAPHY,INC. 740 E Highland Ave #100 Phoenix, AZ 85014 (602) 277-0439 Fax (602)277-0460 www.ruppaerialphot…

  4. 13 Sep 2001

    Doug Cebryk to John Shafer, scott'.'patti@enron.com, armando.diaz@enron.com and 10 more

    RE: Schedule for Preliminary Cost Estimate

    To all We have covered most of the routes on the ground, but are unable to fly at this time. Current plans are to stay in Phoenix until we can fly the routes by helicopte…

  5. 31 Aug 2001

    Doug Cebryk to Ron Matthews, Norm Spalding, Morgan Gottsponer and 9 more

    RE: Sun Devil Pipeline Lengths

    To All: I was very optimistic in my target of getting the Level B estimate ready by Sept 21. Based on the amount of work that will need to be done to get a decent +/- 10%…

  6. 29 Aug 2001

    Doug Cebryk to Kevin Hyatt, Ron Matthews and 4 more

    RE: Sun Devil Pipeline Lengths

    Kevin I'll need to fly the routes and assess the terrain conditions. I plan to do this on Sept 11&12 Ron will need to run the hydraulics on the various options. We both t…