Eric Faucheaux to Steven Harris, Jo Williams, Kevin Hyatt and 23 more
P-2 Recycle & Cooling Issue
Upon further review of previous recommendations to install recycle and cooling at CS P-2 to provide greater turndown, it has been determined that the P-2 turbine has too …
-
15 Mar 2001
Arnold Eisenstein to Jerry D. Martin and 30 more
Red Rock Weekly Report
1. ACTIVITIES: A. Discussions with TW on critical items in order to finalize FERC application: Navajo Environmental has requested a Threatened & Endangered Species (T&E) …
-
10 Mar 2001
Arnold Eisenstein to Jerry D. Martin and 30 more
Red Rock Weekly Report
1. ACTIVITIES: a. Completed site visit to all stations and evaluation of existing facilities b. Discussions with TW on critical items in order to finalize FERC applicatio…
-
9 Mar 2001
Elaine Concklin to Phil Lowry, Rick Craig, Don Hawkins and 40 more
Upsides/Downsides
Please see attached upside/downside list for ETS Operations. I have shown a sub-total for the items we will be including in our 1st Current Estimate per Phil's request. T…
-
8 Mar 2001
Lorraine Lindberg to Perry Frazier and 18 more
RE: EPFS interconnect
I need as close to the exact cost for both 65,000 and 90,000 MMBtu/d as we can get. EPFS is going to pay for this and I don't want ETS to fund anything so it's important …
-
8 Mar 2001
Perry Frazier to Lorraine Lindberg and 18 more
RE: EPFS interconnect
Let me know if you need a level A or level B, in my book a level B is a "good to go" estimate. The prior scope of 60 MMBtu/d was the max. the tap could handle, any thing …
-
7 Mar 2001
Jeffery Fawcett to Ben Asante, Eric Faucheaux and 6 more
Topock Lateral
Gentlemen, In addition to looking for ways in which Transwestern can improve mainline deliverability, another important criteria is access to markets. With the addition o…
-
7 Mar 2001
Lorraine Lindberg to Perry Frazier, Arnie Bailey and 16 more
RE: EPFS interconnect
I just got off the phone with El Paso Field Services. At this time, I now need 2 cost estimates. One to increase the facilities to be able to handle up to 65,000 MMBtu/d …
-
6 Mar 2001
Mike McCracken to Kevin Hyatt, Michelle Lokay, Jeffery Fawcett and 34 more
Marketing Roundtable Notes
All Thank you very much for the great attendance and participation! Thanks, also, to all those who had to juggle this meeting with others. Attached are the notes from the…
-
3 Mar 2001
Donna Martens to Rich Jolly, Arnold L Eisenstein, David Roensch and 22 more
Red Rock Expansion
Please review attached redline draft and provide comments and the signed FERC approval form by 2 P.M. on Tuesday, March 6. Questions, let me know. Thanks. Donna
-
2 Mar 2001
Ben Asante to Gary Choquette and 30 more
Re: Needles Pressure Requirement
Great Gary, Can you please do something quick to tell us what the Needles pressure need to be? Thx
-
2 Mar 2001
Gary Choquette to Kenneth Chow, bob.mcchane@enron.com, Kim Kouri and 12 more
Needles Pressure Requirement
I've got a copy of the SoCal contract for Needles. The exact wording for the pressure requirement is: SECTION 5. PRESSURE. Seller shall tender gas to Buyer, at the delive…