  1. 31 Jul 2001

    Cara Semperger to Corry Bentley, David Poston, Will Smith and 1 more

    RE: Outstanding Issues with Pre-Schedule and Path Confirmation

    Please see my comments in blue What follows are known issues with the Pre-Schedule Workspace and Path Confirmation Report. Pre-Schedule Workspace: Generating Transmission…

  2. 31 Jul 2001

    Will Smith to Cara Semperger, Corry Bentley and 4 more

    Outstanding Issues with Pre-Schedule and Path Confirmation

    What follows are known issues with the Pre-Schedule Workspace and Path Confirmation Report. Pre-Schedule Workspace: Generating Transmission confirmation records appears n…

  3. 27 Jul 2001

    Will Smith to Cara Semperger, Corry Bentley

    FW: New version of PathConfirm moved to P:\PowerSys\Stage

    I have released the new Path Confirmation to Stage. See changes below. Regards, Will

  4. 27 Jul 2001
  5. 27 Jul 2001
  6. 27 Jul 2001

    Glenda Rodriguez to glenda@nerc.com

    Fall 2001 System Operator Workshops

    To: NERC Roster Standards Operating Manual System Operator Training You are invited to participate in one of three workshops designed to solicit input into training issue…

  7. 25 Jul 2001

    Will Smith to Cara Semperger, Corry Bentley, David Poston and 1 more

    RE: Test Results for June 23rd

    A new Path Confirm has been release that should fix your problem of not being able to see your path records. Regards, Will

  8. 25 Jul 2001

    Will Smith to Cara Semperger, Corry Bentley, David Poston and 1 more

    RE: Test Results for June 23rd

    Cara, There is a bug in Path confirm that which will not allow you to select the Trading Region/Desk. Vish is working on a fix and there should be a new version available…

  9. 25 Jul 2001

    Will Smith to Cara Semperger, Corry Bentley, David Poston and 1 more

    RE: Resuming Testing Today

    Routes deleted for these points: MidColumbia COB N/S Portland General System BPA Busbar Palo Verde Midway-PSC Mead-230KV Four Corners-345KV Four Corners-230KV West Wing C…

  10. 25 Jul 2001

    Will Smith to Cara Semperger, Corry Bentley and 4 more

    Pre-Schedule WS and Path Confirmation

    Corry, Cara, There are new versions have been released to stage. What's new and what's fixed: Pre-Schedule Workspace: Now able to select a Trading Region/Desk (EAST or WE…

  11. 24 Jul 2001

    Amy Fitzpatrick to center.dl-portland@enron.com

    Electric Systems for Non-Engineers

    Electric Systems for Non-Engineers Date: August 24 and August 25 Time: 8:30 am to 5:00 pm Location: Oregon Room, 2 World Trade Center This workshop provides you with a co…

  12. 24 Jul 2001

    Vishwanatha Venkataswami to Will Smith and 6 more

    New Version of PathConfirm

    Will, I moved the new version of PathConfirm.Exe into P:\PowerSys\Stage, Please migrate this version into stage. In new version of Path Confirmation following items are f…

  13. 24 Jul 2001

    Frank Billington to Cara Semperger

    RE: OATI Etag 1.7 Training

    Cara, Portland will be Tuesday Sept 18 (with hospitality suite evening of Sept 17), barring major unforeseen circumstances with the venue. When it is contractually locked…

  14. 24 Jul 2001

    Corry Bentley to Cara Semperger

    RE: More name changes for the short Enpower Names

    We're OK with CPS (Constellation) also. If you agree to the list I'll go ahead and submit them. Thanks, Corry

  15. 23 Jul 2001

    David Poston to Cara Semperger and 2 more

    FW: User Testing - Stage - Build Route

    Good Morning Cara, The changes you requested for the Buildroute report have been migrated to stage. You can either test it in either of the test environments (pwrtestn or…

  16. 23 Jul 2001

    Corry Bentley to Cara Semperger and 2 more

    RE: Testing June 22

    Cara, I was out Friday, but totally agree on segregation of East and West Confirmations. Also, I agree that there needs to be a method to delete confirmation records (eit…

  17. 20 Jul 2001

    service@energycentral.com to undisclosed-recipients@enron.com

    Welcome to Energy Central

    To: cara.semperger@enron.com Thank you for registering on the Energy Central website, recognized as the leading energy portal on the Internet today! We are pleased you ch…

  18. 19 Jul 2001

    Asem Atta to Cara Semperger

    RE: Preparing for Next Test Day

    Cara, Following issues are handled in this version.. Slowness - Overall optimization of handling all routines dealing with data extraction within sheets. "Variant Convers…

  19. 19 Jul 2001

    Asem Atta to Cara Semperger, Corry Bentley and 4 more

    RE: Preparing for Next Test Day

    New version of PreSchedWS has been migrated to Stage.. Corry - TVA routing records have been deleted for 6/22/01 Cara - All specified delivery points records have been de…

  20. 18 Jul 2001

    Corry Bentley to Cara Semperger, Will Smith

    RE: Continued Testing-June 21 target Date

    Cara, I pulled several comments you made out, and dittos from here. I agree with your following statements: Even though this path could be consolidated to be smaller, we …

  21. 18 Jul 2001

    Corry Bentley to Cara Semperger

    RE: Transmission Stuff in the new system

    Regardless of your "misc mind altering" habits, I think Will did say that they would only be able to have path modifications/cuts modified in the notes part initially. Th…

  22. 18 Jul 2001

    Cara Semperger to Corry Bentley, David Poston, Will Smith and 1 more

    RE: Preschedule Workspace Testing-June 21 target date

    Good Morning All, I will talk to Corry about how we need our transmission represented. The format is ok, I just need more information in the path or the ability to put th…

  23. 18 Jul 2001

    Will Smith to Cara Semperger and 6 more

    RE: Preschedule Workspace Testing-June 21 target date

    Cara, PreSchedule: 1. Concerning the path with transmission data... The original format was based off of Corry's suggestion. Perhaps the two of you need to discuss your n…

  24. 18 Jul 2001

    David Poston to Jeff Richter, Cara Semperger, Phillip Platter and 9 more

    DS3 Failure and Next Steps

    Good Afternoon, Short-History In case you haven't heard, our project to implement a high-bandwidth connection between Houston & Portland and remove our dependence on Term…

  25. 17 Jul 2001