Enron email

Algorithmic Indexing

10 messages for from:robyn.zivic@enron.com to:john.arnold@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:robyn.zivic@enron.com means Robyn Zivic (robyn.zivic@enron.com).

to:john.arnold@enron.com means John Arnold (john.arnold@enron.com).

  1. 17 Oct 2001

    Robyn Zivic to John Arnold

    RE: Pira

    agreed- thks- i recall a few mths ago when this was being discussed by the west desk - they thought it would not be surprising but no confirmation of the rumours.....

  2. 17 Oct 2001
  3. 11 Oct 2001

    Robyn Zivic to John Arnold

    RE: Pira

    Low is seen ie 1.83 but contango needs to come out of curve so q1 has more downside from current but no lower than e seen in NGV1 Further out - will fax u price target sl…

  4. 11 Oct 2001

    Robyn Zivic to John Arnold

    Pira

    Thinks LNG pprt problems more of a problem for resid and diesel not arriving on time to NE demand- need to build those fuel inventories so prepared but - enough NG to sat…

  5. 11 Oct 2001

    Robyn Zivic to John Arnold

    Pira

    Thinks pwr suppliers in Calif shud be worried abt getting paid the long term contracts rates -------------------------- Sent from my BlackBerry Wireless Handheld (www.Bla…

  6. 11 Oct 2001

    Robyn Zivic to John Arnold

    Pira

    Sees NG lows in place Producers reacting to price mgmt Coal swithcing to NG and power guys stimulating demand But thinks jan feb neds to come of Bull spead --------------…

  7. 11 Oct 2001

    Robyn Zivic to John Arnold

    Pira

    Ignore previous - forecasts: Cinergy novdec 25.75 )al 02 30.75 Cal 03 38.51 Pjm novdec 27.31 cal 02 35.14. Cal 03 39.12 Problem with pwr overbuild of capacity - longer cy…

  8. 11 Oct 2001

    Robyn Zivic to John Arnold

    (no subject)

    By end of oct 02 if have normal winter, = 1.3 end of mar 02 + 2.5 this yrs inj rate + 0.4 with inc hydro gen = 3.8 - can't happen so needprice low - shocks to industry to…

  9. 11 Oct 2001

    Robyn Zivic to John Arnold

    (no subject)

    Cdn alberta prod = mature GOM, need to see prod sustain - don't think happen - need LNG -------------------------- Sent from my BlackBerry Wireless Handheld (www.BlackBer…

  10. 11 Oct 2001

    Robyn Zivic to John Arnold

    Pira

    Supply side is the side that changed- medium term - Expect cal 02 avg 2.45 nymex Q1 2.20 q2 2.30 q3 2.57 q4 2.73 -------------------------- Sent from my BlackBerry Wirele…