  1. 30 Apr 2001

    Matt Smith to David Woodstrom

    RE:

    Dave, As discussed, I need to have daily power outages summarized by Natural Gas (NG) type plants and everything but NG for each WSCC region for the previous year and one…

  2. 30 Apr 2001
  3. 30 Apr 2001

    Matt Smith to Keith Holst

    power outages

    Keith, Take a look at this. Mat

  4. 30 Apr 2001
  5. 30 Apr 2001

    Matt Smith to Colin Tonks and 2 more

    RE: US Gas Phy EPNG SoCal Topk 28-30Apr01 USD/MM

    Colin, Great. As we discussed, we'll need the final query to list all counterparties for each product with net quantities stated for each day (dates listed as column head…

  6. 30 Apr 2001

    Matt Smith to charline.stevens@enron.com

    RE: A100594 Pricing Query

    I'm sorry I do not know what this is in regard to. Could you have meant to send it to another Mat Smith?

  7. 27 Apr 2001

    Matt Smith to lauren.schlesinger@enron.com

    FW: Enron In Action 04.30.01

    -----Original Message----- From: Enron Announcements/Corp/Enron@ENRON [mailto:IMCEANOTES-Enron+20Announcements_Corp_Enron+40ENRON@ENRON.com] On Behalf Of Enron In Action@…

  8. 27 Apr 2001

    Matt Smith to Chris Hyde

    RE: CIG data

    The value should be 0 for R (the value moved from DRN 30685 which should have been changed to zero) and 30685 for D. All the values were D's consistent with the existing …

  9. 27 Apr 2001

    Matt Smith to Chris Hyde and 2 more

    pge

    Chris, Remember way back when......we threw out a bunch of PGE (#17) data that we were going to reload from the saved html files? Anyway, it looks like we're missing data…

  10. 27 Apr 2001

    Matt Smith to Reagan Rorschach

    t

    lasjkdfakl; sdal;sdj ;alsdfj kl;asdjf

  11. 27 Apr 2001

    Matt Smith to Chris Hyde

    CIG data

    Chris, More changes............ For DRN 34585, please change the utilization value in the usage table for 4/23/01 to zero. Then change the DRN on all of the usage data fo…

  12. 27 Apr 2001

    Matt Smith to Chris Hyde

    El Paso Manual Entry

    Chris, I think we need a new pipeline for El Paso Manual Entry. We need to enter linepack once a day. Let's call the DRN LinePack and populate with flow type S. Thanks. M…

  13. 27 Apr 2001

    Matt Smith to Chris Hyde and 2 more

    CIG location and usage changes

    Chris, I stumbled across a few problems with CIG/WIC. First, location 2776 for pipeline has historicals loaded with flow type "D" yet new data is scraped with flow type "…

  14. 26 Apr 2001

    Matt Smith to Yan Wang and 2 more

    Report Time

    Yan, As discussed, it is acceptable to rerun the cube at 6:30 am. After the the refresh, the following West reports should be generated: #25 CIG_WIC (daily), #40 Rockies …

  15. 26 Apr 2001

    Matt Smith to Jody Crook

    Storage Value

    Jody, I have not confirmed that these are the correct values, but this should get you started. These are based on Socal's published long-term storage tariff. I cannot con…

  16. 24 Apr 2001
  17. 24 Apr 2001

    Matt Smith to Chris Hyde

    RE: another PGE point

    Good point. Let's assign a D to it. Mat

  18. 24 Apr 2001

    Matt Smith to Chris Hyde

    another PGE point

    Chris, I assumed we were scaping the "Inventory Chagne" point for PGE, but it doesn't look like any data is in the database. Can you check on this. It's the last row of t…

  19. 24 Apr 2001

    Matt Smith to Chris Hyde

    new locations

    Chris, Please add the following locations for pipeline #42 and populate with indicated flow type.......... 109489 Bullfrog Meter Station (BUL) R 4065 Desert Springs Meter…

  20. 24 Apr 2001

    Matt Smith to Angela Hylton

    data changes

    Angela, CIG (#42) is almost complete, but we have a few data changes to make: First, for DRN 24906 Big Blue Meter Station, please replace the utilized capacity values of …

  21. 23 Apr 2001

    Matt Smith to Monique Sanchez

    RE: EOL reports

    Anytime you get a chance is fine. Just let me know, but I'll tentatively plan on 3 pm. Mat

  22. 19 Apr 2001

    Matt Smith to vineet.arora@enron.com

    FW: Manual Entry

    -----Original Message----- From: Hyde, Chris Sent: Wednesday, April 18, 2001 8:49 PM To: Smith, Matt; Piazze, Tara; Blackburn, Nate; O'Malley, Justin; Rank, Sabina; Gaski…

  23. 19 Apr 2001

    Matt Smith to gerry@questar.com

    Questar Historicals

    Gerry, Per our conversation, I am requesting historical scheduled (final cycle) quantities for Questar Pipeline meter points. Questar previously provided flows up to June…

  24. 19 Apr 2001

    Matt Smith to gerryg@questar.com

    Questar Historicals

    Gerry, Per our conversation, I am requesting historical scheduled (final cycle) quantities for Questar Pipeline meter points. Questar previously provided flows up to June…

  25. 18 Apr 2001

    Matt Smith to Sheetal Patel

    curves