10 more fall outside these years.
from:mark.fisher@enron.com means Mark Fisher (mark.fisher@enron.com).
to:tom.nemila@enron.com means Tom Nemila (tom.nemila@enron.com).
-
12 Jul 2002
Mark Fisher to Tom Nemila and 2 more
WR613 Pitch System performance
Tom, Here is the report I prepared on the methods and types of grpahs for this work request. As examples I used the May 2002 graphs, including the Paretos for the Pitch a…
-
12 Jul 2002
Mark Fisher to Tom Nemila and 2 more
WR627 Fault Paretos (May 2002)
Tom, Here are the fault paretos of fault counts for all sites for May 2002 (may2002paretos_faults.pdf). For readability only the top 30 faults for each site are displayed…
-
9 Jul 2002
Mark Fisher to Tom Nemila and 2 more
WR613 Pitch System Performance
Tom, Attached are the graphs for energy lost due to the pitch and overspeed faults you listed. As I mentioned before the methodology requires decent data recovery for the…
-
8 Jul 2002
Mark Fisher to andre.rast@enron.com and 4 more
Subset of data with extreme temp
Andre, Here is a short subset of 10-minute records containing the extreme temperature event (approximately 3 hours of before/after data). The turbine was #105 at Desert S…
-
8 Jul 2002
Mark Fisher to Tom Nemila and 2 more
Gearbox Temp graphs
Tom, The graphs attached are formatted the same as the sample set I sent you earlier. As of today, Desert Sky 10-minute data has not been uploaded for June 2002 yet, and …
-
8 Jul 2002
Mark Fisher to Tom Nemila and 2 more
Gear Box Temp Graphs
Tom, Here is a sample of the output for this request. For this I have only used May 2002. I for the boxplots one has had records removed when the ambient and gearbox temp…
-
5 Jul 2002
Mark Fisher to Tom Nemila and 2 more
WR613 Pitch System Performance (Energy)
Tom, I have energy estimates for May 2002 attached. Graph 1 is site totals, graph 2 is (total lost)/(total actual production) where total actual production is taken from …
-
3 Jul 2002
Mark Fisher to Tom Nemila and 2 more
WR613 Pitch System Fault Pareto
Tom, From the stage I was at on the duration and energy it was just as easy to do all 7 sites as the 3 you specifically requested. If you do not want the additional graph…
-
3 Jul 2002
Mark Fisher to Tom Nemila and 2 more
WR613 Pitch System Performance
Tom, Here are the new graphs with totals (bar charts) and distributions (boxplots) for all seven sites through May 2002. I believe that I have come up with a method of pr…
-
2 Jul 2002
Mark Fisher to Tom Nemila and 2 more
WR613 Pitch System Performance
Tom, Maybe I mis-interpreted again, but here are the graphs for site total (the boxplots are still by turbine). This is for May. I will wait to see if this is more like w…