Enron email

Algorithmic Indexing

7 messages for from:m..forney@enron.com to:christopher.watts@enron.com after:2001-06 before:2001-07

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:m..forney@enron.com means John M. Forney (m..forney@enron.com).

to:christopher.watts@enron.com means Christopher Watts (christopher.watts@enron.com).

  1. 27 Jun 2001

    John M. Forney to Joe Errigo, Eric Saibi, Steve Olinde and 1 more

    JULY SCHEDULE IS OUT

    CHECK IT OUT. IF YOU TRADE DAYS WITH ANYONE, MAKE SURE THEY HAVE A SIMILAR SKILLSET. IE, DONT TRADE WITH THE NEW GUY TO FILL A NIGHT SHIFT ALONE. THANKS! JMF

  2. 27 Jun 2001

    John M. Forney to Joe Errigo, Christopher Watts, Eric Saibi and 10 more

    Real Time Group Expectations

    Greetings - I have attached the most basic expectations for our group. We have been spending a lot of time balancing the books lately, and the attached will relieve some …

  3. 21 Jun 2001

    John M. Forney to Christopher Watts

    City of Bryan for May 29th, hour ending 19

    Chris, I think we already discussed this issue but let me summarize what I think happened: we were parking 50 mw's with COB. We sold 50 to Reliant/HLP, but the transmissi…

  4. 20 Jun 2001

    John M. Forney to Joe Errigo, Christopher Watts, Eric Saibi and 1 more

    Frontera Screen

    As you know, the Frontera status screen goes away at night, as the flat screens are taken down. You can find the same screen on the East Power Portal under Frontera Produ…

  5. 19 Jun 2001

    John M. Forney to Joe Errigo, Christopher Watts, Eric Saibi and 10 more

    ERCOT DIRECT LINES

    We have four direct lines to the Ercot ISO that have been installed on each of your turrets. As an ISO participant, we are required to be staffed 24-7 to handle any reque…

  6. 15 Jun 2001
  7. 7 Jun 2001

    John M. Forney to Christopher Watts, Joe Errigo, Eric Saibi and 1 more

    Ercot Scheduling Fees

    Please note that when you start/stop a schedule to or from the following control areas, the listed static scheduling fee applies. Reliant/HLP - $49 TNMP - $55 COA - $40 B…