from:larry.campbell@enron.com means Larry Campbell (larry.campbell@enron.com).
to:rick.smith@enron.com means Rick Smith (rick.smith@enron.com).
-
14 Dec 2001
Larry Campbell to steve.sanmiguel@enron.com, Team Mountainair, Rich Jolly and 4 more
RE: Station 7: Unit 703
Steve, what I have on my board is that when cubix did the test for 703 the engine load was 89%. If Cubix is willing to provide us a report that shows the load on 703 to b…
-
30 Nov 2001
Larry Campbell to Team Gallup, Gallup-Sta4, Team, team.flagstaff-sta3@enron.com and 5 more
Public water system sampling
Stations 3,4 and 5. I spoke with Danny Collier of the EPA today, Friday, November 30, 2001 and he has instructed me that the EPA is to receive copies of all monthly water…
-
7 Sep 2001
Larry Campbell to William Kendrick, John Shafer, Sarita Garza and 37 more
Albuquerque Environmental Roundtable, Oct. 16-17
The 2001 environmental roundtable has been confirmed for the above location and dates. Make your reservations at the Holiday Inn Crowne Plaza (505) 821-3333. The hotel is…
-
19 Jul 2001
Larry Campbell to Arnie Bailey, Bob Bandel, David Roensch and 10 more
TNC Membership
Advisors, presented below is a memo from GPG Houston requesting that we provide to them the number of ETS employees in each team who have taken advantage of the one year …
-
18 Jul 2001
Larry Campbell to team.flagstaff-sta3@enron.com, Gallup-Sta4, Team, Gallup-Sta5, Team and 6 more
Public Water System Sampling Time Again
Sta.3, 4 and 5 As you may know, we are at the end of our grace period for not being required to do monthly sampling for the public water systems at sta. 3,4 and 5. Jeff L…
-
18 May 2001
Larry Campbell to Lorraine Lindberg, Team Laguna, Team Mountainair and 4 more
RE: PCB sampling at Rio Puerco
Laguna and or Moutainair team, because I dont know which team is responsible for the Belen delivery point, would someone check on liquids at this location and if present,…
-
11 May 2001
Larry Campbell to Lorraine Lindberg and 6 more
RE: PCB sampling at Rio Puerco
Lorraine, Ill give you a call this afternoon. By the way, did they test the liquids for PCBs? I havent heard from the Gallup team on whether they have gone and checked fo…
-
14 Mar 2001
Larry Campbell to okpala.maria@epamail.epa.gov and 6 more
Re: FOLLOW-UP INFORMATION ON THROUGHPUT AND OPERATING HOURS
Maria, as per your request, please see the attached data: All the below figures were calculated using the 4500 hp factor on the mainline ( TCV-12 Clark ) units and 450 hp…
-
7 Mar 2001
Larry Campbell to team.flagstaff-sta3@enron.com, Team Flagstaff, Gallup-Sta4, Team and 9 more
Archeology Survey C/S 3 and 4
I was just informed by the Navajo Nation that prior to receiving approval from the agency fo rthe installation of the turbines, an archeology survey is to be performed at…
-
21 Feb 2001
Larry Campbell to Arnold L Eisenstein, Earl Chanley, Donna Martens and 10 more
Arizona Mainline Expansion
This is a gentle reminder, and Im sure that most are aware, but under no circumstances is there to be any construction activiy initiated for the turbine installation at t…
-
24 Jan 2001
Larry Campbell to Team San-Juan-LaPlata and 6 more
Re: La Plata emissions issues
Rick, Terry had informed me that Solar had trouble with this unit in making its emissions guarantees, prior to shipping it to La Plata. I was not aware of this when I per…
-
24 Jan 2001
Larry Campbell to John Shafer, Louis Soldano, Cutty Cunningham and 13 more
Meeting with the Laguna's over the PCB remediation at C/S 6
I wanted to present this summary of the meeting Transwestern had with representatives of the Laguna Pueblo concerning the status of the PCB remediation activities by TW. …
-
3 May 2000
Larry Campbell to Team San-Juan-LaPlata and 6 more
Emission Factors for Permit No. 97LP0653
Larry, as per our conversation, presented below are the emissions factors provided by the state of Colorado for the T-7000 Centaur under permit 97LP0653 : PM10 14.000/MMS…
-
13 Mar 2000
Larry Campbell to steve.sanmiguel@enron.com and 36 more
Re: Request
Steve, you have been given all the written permit history and portable analyzer correspondance from myself to and from the State of New Mexico. All of my air permit files…
-
10 Nov 1999
Larry Campbell to William Kendrick and 8 more
Re: LaPlata
Bill, we had an air inspection at the facility a couple of weeks ago and all went well. Prior to the state visit, we went through a "trouble shooting" scenario and found …
-
22 Jun 1999
Larry Campbell to Team San-Juan-LaPlata and 4 more
Fuel Consumption, La Plata A
Guys, I received Harrell's memo concerning the fuel use for the turbine and the fact that you had to reduce gas producer speeds to comply with the permits fuel use requir…