from:larry.campbell@enron.com means Larry Campbell (larry.campbell@enron.com).
to:earl.chanley@enron.com means Earl Chanley (earl.chanley@enron.com).
-
25 Jan 2002
Larry Campbell to Ron Matthews, Morgan Gottsponer, Ben Asante and 7 more
RE: Bloomfield horsepower
Ron you are correct. The permitted horsepower forBloomfield is 5879. We cant go over this value....without submitting a notification to the State of New Mexico and waitin…
-
4 Dec 2001
Larry Campbell to John Shafer, Rich Jolly, Earl Chanley and 3 more
FW: Summary of Progress
FYI from Penn State on the progress of the model to remove PCB's from Transwetern's pipeline.
-
2 Nov 2001
Larry Campbell to William Kendrick, John Shafer, Arnold L Eisenstein and 10 more
Status, Redrock Air Permits
Bill as per your request, presented below is a status of the air permitting activity by the agencies as of today 11/01/01. Stations 1 and 2. The EPA has completed is revi…
-
1 Nov 2001
Larry Campbell to William Kendrick, John Shafer, Arnold L Eisenstein and 10 more
Status, Redrock Air Permits
Bill as per your request, presented below is a status of the air permitting activity by the agencies as of today 11/01/01. Stations 1 and 2. The EPA has completed is revi…
-
18 Jul 2001
Larry Campbell to Donna Martens, Arnold L Eisenstein, Mike McCracken and 8 more
RE: TWPL Station 2 Timber
I just spoke to the state of Arizona concerning the tree removal at Station 2. Their response to our request to remove the trees has been APPROVED, provided that this is …
-
4 Apr 2001
Larry Campbell to Rich Jolly and 28 more
Re: DR/Pipe Cleaning on TW Mainline
Rich, I agree with your concern. The entire Arizona mainline is a potential concern for carrying PCB's into California. We have verification of this from the last cleanin…
-
15 Mar 2001
Larry Campbell to John Shafer, William Kendrick and 6 more
latest on the Az Mainline Expansion
John, Bill this is the latest on the environmental issues for the turbines in Arizona. The arch surveys at stations 3 and 4 on the Navajo reservation have been completed …
-
14 Mar 2001
Larry Campbell to john.march@rolls-royceesi.com and 6 more
Re: Transwestern project - expected CO emissions
Thanx John, for the attachment. How did the presentation go? John March <john.march@rolls-royce.com> on 03/14/2001 07:07:48 AM Please respond to john.march@rolls-royceesi…
-
12 Mar 2001
Larry Campbell to Rich Jolly, William Kendrick, Randy Rice and 4 more
Additional Noters on SoCals Meeting with Southwest Gas over PCBs
I spoke with Ralph Komai, PCB person with SoCal, concerning the SWG meeting about PBCs on the SWG system. As mentioned in the last note, SWG has discovered PCBs and has b…
-
9 Mar 2001
Larry Campbell to Donna Martens, Arnold L Eisenstein, Earl Chanley
F&W Issue on the Navajo Lands
I spoke to John Nystedt, the contact person for the Navajo Nation F&W service concerning the need to do endangered plants and animal surveys at the two C/S on reservation…
-
9 Mar 2001
Larry Campbell to Terry Hackett and 6 more
Re: Station 2 Concerns
Terry, the entire facility has not been disturbed. Only most of it. Id say approx 70%. The other 30% has been impacted but not tot the point of disturbing all the vegetat…
-
8 Mar 2001
Larry Campbell to Byron Rance, Arnold L Eisenstein, Earl Chanley
emissions levels for the auxillary units 1-4
Byron as per the Red Rock expansion conference call today presented below are the emissions estimates for the auxillary engines at sta. 1-4. Understand these are not actu…
-
6 Mar 2001
Larry Campbell to Arnold L Eisenstein, Earl Chanley, Donna Martens and 8 more
Re: TRANSWESTERN RB211
Arnold, I think I will pass on the meeting. Please apprise me of anything I may need to know from the meeting. To bring you up to date on the environmental events of the …
-
21 Feb 2001
Larry Campbell to Arnold L Eisenstein, Earl Chanley, Donna Martens and 10 more
Arizona Mainline Expansion
This is a gentle reminder, and Im sure that most are aware, but under no circumstances is there to be any construction activiy initiated for the turbine installation at t…
-
21 Feb 2001
Larry Campbell to William Kendrick and 8 more
RE: TW Expansion Project
Bill, the baseline noise surveys, which have been completed, were performed by Hoover and Keith out of Houston, Tx. I have a meeting scheduled with the permit engineers f…
-
12 Jun 2000
Larry Campbell to Michel Nelson, John Shafer, Rich Jolly and 11 more
Additonal PCB Sampling on the SoCal System
During the quarterly conference call with SoCal in which we discuss PCB costs on the SoCal system, for which Transwesten is 86% responsible, Ralph Komai, SoCal's PCB pers…
-
15 May 2000
Larry Campbell to Michel Nelson, Rich Jolly, Earl Chanley and 5 more
May PCB Meeting Notes ET&S and PG&E
1. Status of Mainline Filter Separator Project. Earl Chanley has indicated that the June 1 target date for in service is on schedule. There will be 2 mainline separators …
-
27 Aug 1999
Larry Campbell to Earl Chanley, William Kendrick, Rich Jolly and 6 more
PG&E PCB Meeting with John Woodyard
In light of the recent PCB issue with PG&E on the Topock Lateral, I have asked Mr. John Woodyard of Roy F. Westin to c ome to Houston and make a presentation on PCB's in …
-
10 Aug 1999
Larry Campbell to David Roensch and 12 more
Re: PG&E
The environmental clearances are still in effect as long as we stay on our right of way and in our measuring station yard. For any construction work at the PG&E station, …
-
23 Jul 1999
Larry Campbell to Michel Nelson, Rich Jolly, David Roensch and 11 more
Recent PCB Results, Topock Lateral
A 2:00 pm central time conference call has been scheduled to discuss the most recent analytical results from the Topock Lateral PCB sampling. Your attendence is requested…
-
23 Jul 1999
Larry Campbell to Michel Nelson, David Roensch, Rich Jolly and 9 more
Recent PCB Analytical Results, Topock Lateral
A 2:00 pm central time conference call has been scheduled to discuss the most recent PCB analytical results for the Topock Lateral. Your attendance is requested. The dial…
-
11 Jun 1999
Larry Campbell to Rich Jolly, Michel Nelson, David Roensch and 8 more
Cleaning Postponement of the pipeline between TW PG&E M/S and the Topock C/S
Based upon valving constraints and the innaccessability to the inside of the pipe between our M/S and the Topock C/S, a decision has been made to postpone cleaning of his…
-
2 Jun 1999
Larry Campbell to Louis Soldano, Rich Jolly, David Roensch and 8 more
Additonal Information Concerning PG&E
On a related note, I spoke to Vector concerning the equipment which was suggested for cleaning on the PG&E system. It is as follows: 2 scrubbers, some underground C/S pip…