from:kevin.cousineau@enron.com means Kevin Cousineau (kevin.cousineau@enron.com).
-
18 Jun 2002
Kevin Cousineau to Hollis Kimbrough, Mark V Walker, Mark Fisher
Meter Readings
Guys: Attached are the meter readings for Indian Mesa for both feeders (transformers). They includ the production and the cumsumption, and cover a period between May 19 a…
-
18 Jun 2002
Kevin Cousineau to Mark Fisher and 8 more
Re: Questions/Observations about VisuPro
Mark: First, the new version of VisuPro (Version IV) will use standard local time, not daylight time. This means that during the year it will be off by one hour for 1/2 o…
-
15 May 2002
Kevin Cousineau to Mark Ratekin and 6 more
Re: Consumption for for GE1.5
Mark, Mark and Mark: I have reviewed the attached power curve and clearly it will not help in formulating an answer to your question. I would like to ask Mark Fisher to l…
-
14 May 2002
Kevin Cousineau to Mark Fisher, Mark Ratekin and 4 more
Re: Consumption for for GE1.5
Mark Eilers, Fisher and Ratekin: Mark Ratekin has in his possession an IEC standard power curve for the Tehachapi 1.5 Turbine. This power curve shows both the power produ…
-
10 May 2002
Kevin Cousineau to Mark Fisher, stan.ballard@enron.com and 2 more
Re: Desert Sky ZMET graphs
Stan: Here is the data, 100% data recovery, with a very quick turn-around from Mr. Fisher. Thanks Mark! Regards KLC
-
3 May 2002
Kevin Cousineau to Hollis Kimbrough, stan.ballard@enron.com, Paul Landers and 7 more
Re: 1.5 MW WTG SPC reports
Hollis: I am forwarding this to our Controls Group people who are working on a manual with full description of all sensors, locations, identification, names, etc. I am as…
-
17 Apr 2002
Kevin Cousineau to Mark Fisher, Ronald Brzezinski, Alaadin Suliman and 1 more
Re: Trent ATP test
Mark, Ron, Alaadin and Hollis: I am uncomfortable, extremely uncomfortable, with trying to make this test pass by using data that is not synchronized within the same peri…
-
15 Apr 2002
Kevin Cousineau to thomas.wilkins@enron.com, Tim Mohammed, Ronald Brzezinski and 8 more
Meter Test
Ron, Val, Jeff and Russell: Please read the attached test performed by Russell. He installed a calibrated watt/watthour meter and noted the difference between this meter …
-
9 Apr 2002
Kevin Cousineau to Mark Fisher
Re: Clear Sky SCADA testing
Mark: We have not yet started the Final SCADA test. I will keep you informed when we start this test. Regards KLC
-
14 Mar 2002
Kevin Cousineau to Mark Fisher and 2 more
Re: Availability Calculation Indian Mesa
See Blue Notes Below
-
6 Mar 2002
Kevin Cousineau to Mark Fisher and 2 more
Re: Indian Mesa Testing
Mark: The initial testing was delayed due to not being able to get Garrad Hassan inspector on site in time. I will let you know but I was told that we would proceed durin…