Enron email

Algorithmic Indexing

11 messages for from:kevin.cousineau@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:kevin.cousineau@enron.com means Kevin Cousineau (kevin.cousineau@enron.com).

  1. 18 Jun 2002

    Kevin Cousineau to Hollis Kimbrough, Mark V Walker, Mark Fisher

    Meter Readings

    Guys: Attached are the meter readings for Indian Mesa for both feeders (transformers). They includ the production and the cumsumption, and cover a period between May 19 a…

  2. 18 Jun 2002

    Kevin Cousineau to Mark Fisher and 8 more

    Re: Questions/Observations about VisuPro

    Mark: First, the new version of VisuPro (Version IV) will use standard local time, not daylight time. This means that during the year it will be off by one hour for 1/2 o…

  3. 15 May 2002

    Kevin Cousineau to Mark Ratekin and 6 more

    Re: Consumption for for GE1.5

    Mark, Mark and Mark: I have reviewed the attached power curve and clearly it will not help in formulating an answer to your question. I would like to ask Mark Fisher to l…

  4. 14 May 2002

    Kevin Cousineau to Mark Fisher, Mark Ratekin and 4 more

    Re: Consumption for for GE1.5

    Mark Eilers, Fisher and Ratekin: Mark Ratekin has in his possession an IEC standard power curve for the Tehachapi 1.5 Turbine. This power curve shows both the power produ…

  5. 10 May 2002

    Kevin Cousineau to Mark Fisher, stan.ballard@enron.com and 2 more

    Re: Desert Sky ZMET graphs

    Stan: Here is the data, 100% data recovery, with a very quick turn-around from Mr. Fisher. Thanks Mark! Regards KLC

  6. 3 May 2002

    Kevin Cousineau to Hollis Kimbrough, stan.ballard@enron.com, Paul Landers and 7 more

    Re: 1.5 MW WTG SPC reports

    Hollis: I am forwarding this to our Controls Group people who are working on a manual with full description of all sensors, locations, identification, names, etc. I am as…

  7. 17 Apr 2002

    Kevin Cousineau to Mark Fisher, Ronald Brzezinski, Alaadin Suliman and 1 more

    Re: Trent ATP test

    Mark, Ron, Alaadin and Hollis: I am uncomfortable, extremely uncomfortable, with trying to make this test pass by using data that is not synchronized within the same peri…

  8. 15 Apr 2002

    Kevin Cousineau to thomas.wilkins@enron.com, Tim Mohammed, Ronald Brzezinski and 8 more

    Meter Test

    Ron, Val, Jeff and Russell: Please read the attached test performed by Russell. He installed a calibrated watt/watthour meter and noted the difference between this meter …

  9. 9 Apr 2002

    Kevin Cousineau to Mark Fisher

    Re: Clear Sky SCADA testing

    Mark: We have not yet started the Final SCADA test. I will keep you informed when we start this test. Regards KLC

  10. 14 Mar 2002
  11. 6 Mar 2002

    Kevin Cousineau to Mark Fisher and 2 more

    Re: Indian Mesa Testing

    Mark: The initial testing was delayed due to not being able to get Garrad Hassan inspector on site in time. I will let you know but I was told that we would proceed durin…