from:john.sturn@enron.com means John Sturn (john.sturn@enron.com).
to:jerry.graves@enron.com means Jerry Graves (jerry.graves@enron.com).
-
25 Feb 2002
John Sturn to Ben Asante, Gary Choquette, Jerry Graves and 12 more
Bloomfield DRA Re-Application
Please note below, information on the conference call to discuss re-apply drag reducing agent to the Bloomfield to LaPlata line. Talk with you then. Thanks, John
-
22 Feb 2002
John Sturn to Ben Asante, Gary Choquette, Jerry Graves and 11 more
Bloomfield DRA Re-Application
I have been asked to proceed with plans for the installation of DRA on the SJ lateral for around mid-April. I am trying to schedule a conference call next week to discuss…
-
4 Feb 2002
John Sturn to team.ogden-field@enron.com and 58 more
Re: Operations - Ogden north configuration
Ron, To the best of my knowledge it should not cause any quality problems to compress Redfield to a common B-C discharge. There could be some concern with responding to a…
-
14 Jan 2002
John Sturn to team.bushton-operations@enron.com, team.lyons@enron.com, Jesse Alvarado and 34 more
Lyons Withdrawal Switch to Recompress Suction - Planned for Tuesday, 01/15/02
Have not heard of any problems for switching Lyons to Bushton recompress, so it is planned to make the switch. But the Bushton Treater inlet filters have developed high d…
-
11 Jan 2002
John Sturn to team.bushton-operations@enron.com, team.lyons@enron.com, Jesse Alvarado and 32 more
Lyons Withdrawal Switch to Recompress Suction
Please let me know if you see any problems with switching the Lyons withdrawal volumes to the Bushton recompress suction on Monday, 01/14/02. Lyons has been free flowing …
-
20 Nov 2001
John Sturn to Rich Jolly, David Roensch, Kimberly Watson and 22 more
La Plata to Bloomfield Drag Reducing Agent Application Evaluation - Estimated Costs
I also wanted to pass on to you the estimated costs that were used: Below are the rough cost estimates to apply drag reducing agent to the LaPlata to Bloomfield line. Fac…
-
16 Nov 2001
John Sturn to Jesse Alvarado, Roy Armitage, Rodney Barnes and 27 more
11/15/01 Gas Control Winter Operations Meeting Presentation
Attached is the PowerPoint presentation from today's meeting. John
-
22 Oct 2001
John Sturn to team.beaver-plant@enron.com, team.mullinville-maintenance@enron.com, team.mullinville-operations@enron.com and 53 more
Beaver to Bushton configuration without the Bushton turbine - REVISION
Well my plan lasted about 30 minutes. I had missed that Clifton unit 32 has been mothballed. It is in a preserved state, requiring an estimated 12 hours to place it back …
-
22 Oct 2001
John Sturn to team.beaver-plant@enron.com, team.mullinville-maintenance@enron.com, team.mullinville-operations@enron.com and 53 more
Beaver to Bushton configuration without the Bushton turbine
Below is a system configuration I was asked to put together to flow 1600 MM/D through Clifton without the Bushton turbine. A system weighted temperature of 29 F is foreca…