from:jesse.alvarado@enron.com means Jesse Alvarado (jesse.alvarado@enron.com).
-
22 Mar 2002
Jesse Alvarado to controllers.dl-ets@enron.com
COYANOSA REGULATOR
The COYANOSA REG. is fixed and is back in operations !!!!!!!!!!!!!!!!!!!
-
22 Mar 2002
Jesse Alvarado to controllers.dl-ets@enron.com
PLAINS TURBINE GEN. OR A/C POWER ALARM
If you get a Alarm on the Generator Running or on a A/C Power Failure Alarm at the Plains Sta. let LEWIS RENEAU with the ANDREWS TEAM know right away . Thanks JESSE A.
-
17 Mar 2002
Jesse Alvarado to controllers.dl-ets@enron.com
GALLUP SUC. SETPT.
The suc set has been rasied back up to 687 which is about as low as we can go on this unit. We were real close to tripping the unit on low suc press. The reason is that t…
-
28 Feb 2002
Jesse Alvarado to controllers.dl-ets@enron.com
PINNICLE LEA --- SPS POWER
Jeff in their Dispatch Center in Colorado has advised me that they now take care of this I/C their Amarillo Dispatch does not handle it any more if you have any issues ca…
-
28 Feb 2002
Jesse Alvarado to controllers.dl-ets@enron.com
NNG ESTES TW to NNG POI 61334
This I/C has to be shut in manually when it is not flowing because there is a GAS LEAK !! on the valve stem. PLEASE CALL the MONAHANS TEAM on call person to shut this in …
-
31 Jan 2002
Jesse Alvarado to controllers.dl-ets@enron.com
WT-1 UNIT #3
Unit # 3 has electric drive problems the GE Rep .will be on site tomorrow to make a more complete inspection of the unit. As of now the unit is unavailable to run.
-
31 Jan 2002
Jesse Alvarado to controllers.dl-ets@enron.com
WFS -LA MAQUINA FLOW
Brian with the Bloomfield Team called to let us know that when the flow gets to fluctuating up and down we are starting to fight for the gas against TransColorado,and El …
-
20 Jan 2002
Jesse Alvarado to controllers.dl-ets@enron.com
SKELLYTOWN H2O MONITER
Eric Hiaduk called to say that he worked on this moniter and it is still not right . He said that we are only showing 2# of water. the moniter is showing 6.4# he said tha…
-
20 Jan 2002
Jesse Alvarado to controllers.dl-ets@enron.com
GPM LINAM RANCH I/C POI 1709
Shut run # 2 in low nom, going through one run only. If the nom increases have the on call for this I/C go out and open the # 2 run back up.
-
16 Oct 2001
Jesse Alvarado to controllers.dl-ets@enron.com
PLAINVIEW DELMAR
Andrew advised me today that it will be another 2wks. before the delmar is ready @ Plainview had to reorder parts for it.