Enron email

Algorithmic Indexing

12 messages for from:gerald.nemec@enron.com to:steve.schneider@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:gerald.nemec@enron.com means Gerald Nemec (gerald.nemec@enron.com).

to:steve.schneider@enron.com means Steve HPL Schneider (steve.schneider@enron.com).

  1. 28 Aug 2000

    Gerald Nemec to Jim Schwieger, Steve HPL Schneider

    Re: Kinder / Morgan MidCon Tx Interconnect agreement with HPL

    Jim, I forwarded those to Steve Schneider for signature. I think Steve was waiting on some Exhibits. Jim Schwieger 08/28/2000 05:00 PM To: Gerald Nemec/HOU/ECT@ECT cc: Su…

  2. 26 Apr 2000
  3. 19 Apr 2000

    Gerald Nemec to james.haden@enron.com and 4 more

    Southern Union Interconnect

    Oops. I just found the drawing you had already sent me. Sorry.

  4. 19 Apr 2000

    Gerald Nemec to james.haden@enron.com and 4 more

    Southern Union Interconnect

    Jim, Forgot to mention in the note, that we will need the drawing for Exhibit A to be attached to the agreement. Thanks.

  5. 19 Apr 2000

    Gerald Nemec to Steve HPL Schneider, james.haden@enron.com, Janet H Wallis and 3 more

    Southern Union Interconnect

    I recieved the interconnect agreements (executed by Southern Union) this morning. Attached is the form of interconnect agreement that was executed by Southern Union. I wi…

  6. 11 Apr 2000

    Gerald Nemec to Jim Schwieger and 8 more

    MidCon Agreements

    Attached are the revised agreements based on our discussion prior. Please review and if everything looks good, I will prepare executables for MidCon. Please note the foll…

  7. 4 Apr 2000

    Gerald Nemec to Brad Blevins, Jim Schwieger, Steve HPL Schneider and 1 more

    RE: Second Interconnect between MidCon Texas and HPL

    I will revise the documents to reflect Flagstaff and the items we discussed at the meeting previously. Kevin's email indicates he wants to remove the language concerning …

  8. 30 Mar 2000

    Gerald Nemec to Steve HPL Schneider and 4 more

    Re: CPS Revisions

    Steve, Those were CPS's suggested changes, not mine. I agree. I don't know what they want for Section 6 and Jim has agreed to get with CPS to get further definition. I al…

  9. 27 Jan 2000

    Gerald Nemec to Jim Schwieger and 4 more

    MidCon Agreements

    Jim, Attached are the interconnect agreements for the MidCon Flagstaff (formerly Greens Bayou) and Deer Park points. The pressure of 550 psig is in the Flagstaff agreemen…

  10. 15 Dec 1999

    Gerald Nemec to Steve HPL Schneider, Jim Schwieger, Brad Blevins and 2 more

    MidCon Interconnect Agreements

    Attached are drafts of the MidCon Interconnect Agreement for Deer Park and Greens Bayou. The agreements are written with the following key points. 1. HPL will install bot…

  11. 16 Jun 1999

    Gerald Nemec to Steve HPL Schneider and 8 more

    TUFCO Trawick I/C

    TUFCO has agreed to remove the exception to consequentials for breach of quality provisions. They are preparing executables and will forward to HPL for execution. Thanks …

  12. 15 Jun 1999

    Gerald Nemec to Steve HPL Schneider and 8 more

    TUFCO Trawick I/C

    Steve, We are currently negotiating an interconnect agreement for an upgrade of an existing interconnect off the Trawick System into TUFCO. The interconnect is solely a d…