21 Sep 2001
Doug Cebryk to Eric Gadd, Kevin Hyatt, Jerry D. Martin and 2 more
Costs/Activities to FERC Filing- Sun Devil
Gentlemen We have completed the analysis of activities and costs to progress the Sun Devil Project to a FERC Filing by March 30/01 This file details the FERC ACTIVITIES T…
-
18 Sep 2001
Doug Cebryk to John Shafer, Larry Campbell and 8 more
RE: Additional Cost Estimate - Sun Devil Project
John I apologize for the tone of my e-mail, but hope you agree that from your e-mail, it could be interpreted that at the last minute, I was asking for a new,comprehensiv…
-
13 Sep 2001
Doug Cebryk to rich.plachy@enron.com, Jerry D. Martin, Kevin Hyatt
RE: GITA GIS for Oil and Gas meeting
Rich Thanks for the information. Please contact RUPP AERIAL PHOTOGRAPHY,INC. 740 E Highland Ave #100 Phoenix, AZ 85014 (602) 277-0439 Fax (602)277-0460 www.ruppaerialphot…
-
13 Sep 2001
Doug Cebryk to John Shafer, scott'.'patti@enron.com, armando.diaz@enron.com and 10 more
RE: Schedule for Preliminary Cost Estimate
To all We have covered most of the routes on the ground, but are unable to fly at this time. Current plans are to stay in Phoenix until we can fly the routes by helicopte…
-
31 Aug 2001
Doug Cebryk to Ron Matthews, Norm Spalding, Morgan Gottsponer and 9 more
RE: Sun Devil Pipeline Lengths
To All: I was very optimistic in my target of getting the Level B estimate ready by Sept 21. Based on the amount of work that will need to be done to get a decent +/- 10%…
-
29 Aug 2001
Doug Cebryk to Kevin Hyatt, Ron Matthews and 4 more
RE: Sun Devil Pipeline Lengths
Kevin I'll need to fly the routes and assess the terrain conditions. I plan to do this on Sept 11&12 Ron will need to run the hydraulics on the various options. We both t…