Enron email

Algorithmic Indexing

34 messages for from:donald.robinson@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:donald.robinson@enron.com means Donald Robinson (donald.robinson@enron.com).

  1. 6 Feb 2002

    Donald Robinson to Cara Semperger

    game

    http://www.zone.msn.com/doubletrouble/

  2. 15 Jan 2002

    Donald Robinson to Sean Crandall, Diana Scholtes, Heather Dunton and 6 more

    Annuity for PGE transmission for Dec 2000.

    I have created an sale annuity for PGE transmission for December 2001 per Elsie Lew's instruction. Deal #896701.1 Please call Elsie if you have any questions. Thanks, Don…

  3. 4 Jan 2002

    Donald Robinson to Laura Wente and 4 more

    DECEMBER_COBMIDCPGE_EVERYTHING.xls

    COB and MIDC were done seperately until Dec. 19. I have indicated in the tab name which location. Any questions? Please ask. Donald.

  4. 16 Oct 2001

    Donald Robinson to shift.dl-portland@enron.com and 4 more

    Short due to lending at PGE System for Wednesday, 10/17.

    We are short at PGE system for Wednesday, 10/17/01. HE1-6, 23-24pdt, we are 13mw short (total of 104mw). This is due to a lending deal done by the NW Cash desk. Please su…

  5. 3 Oct 2001

    Donald Robinson to Kathy Axford, Jill Chatterton, Sean Crandall and 7 more

    Out of the office for Thursday and Friday, 10/04-05

    I will be returning Monday, 10/08. Cara will be doing COB and PGE system stuff in my absence. Thank you for your support. Donald.

  6. 2 Oct 2001

    Donald Robinson to shift.dl-portland@enron.com and 6 more

    Short due to lending at PGE System for Wednesday, 10/03.

    We are short at PGE system for Wednesday, 10/03/01. HE7-22pdt, we are 25mw short (total of 400mw). This is due to a lending deal done by the NW Cash desk. Please supply P…

  7. 2 Oct 2001

    Donald Robinson to shift.dl-portland@enron.com and 6 more

    Short due to lending at PGE System for Wednesday, 10/03.

    We are short at PGE system for Wednesday, 10/03/01. HE7-22pdt, we are 25mw short (total of 400mw). This is due to a lending deal done by the NW Cash desk. Please supply P…

  8. 27 Sep 2001

    Donald Robinson to shift.dl-portland@enron.com and 6 more

    Lending at PGE System for Saturday 09/29/01.

    We are short at PGE system for Saturday, 9/29/01. HE1-6, 23-24 we are 50mw short, HE15-20pdt, we are 25mw short (total of 550mw short). This is due to a lending deal done…

  9. 26 Sep 2001

    Donald Robinson to shift.dl-portland@enron.com and 6 more

    Short at PGE system for Thurs and Fri, 09/27-28

    We are short at PGE system for Thursday and Friday, 9/27-28/01. HE15-20pdt, we are 25mw short (total of 150mw short each day). This is due to a lending deal done by the N…

  10. 25 Sep 2001

    Donald Robinson to shift.dl-portland@enron.com and 6 more

    Length at PGE system for 9/26.

    We are long at PGE system for Wednesday, 9/26/01. HE7-13 at 46mw, HE14 at 45mw, HE15-20 at 25mw, and HE21-22 at 46mw. Please sell from Portland system. Deal #789284.1. Th…

  11. 24 Sep 2001

    Donald Robinson to shift.dl-portland@enron.com and 6 more

    Lending at PGE System for Tuesday, 09/25/01.

    We are short at PGE system for Tuesday, 9/25/01. HE1-6 , 15-20, and 23-24pdt, we are 25mw short (total of 350mw short). This is due to a lending deal done by the NW Cash …

  12. 21 Sep 2001

    Donald Robinson to shift.dl-portland@enron.com and 6 more

    Interesting Monday, 09/24. We are long and short.

    We are short at PGE system for Monday, 9/24/01. HE1-6 , 23-24pdt, we are 100mw short. This is due to a lending deal done by the NW Cash desk. Please supply Portland at th…

  13. 20 Sep 2001

    Donald Robinson to shift.dl-portland@enron.com

    Update: Short at Portland System for 9/20-22

    Friday's PGE system deal # is 783528.1 Saturday's is #783646.1 Thanks, Donald.

  14. 20 Sep 2001

    Donald Robinson to shift.dl-portland@enron.com and 6 more

    Short at Portland System for 9/20-22

    We are short at PGE system for 9/21/01 and 9/22/01. HE15-20pdt, we are 25mw short. This is due to a lending deal done by the NW Cash desk. Please supply Portland at their…

  15. 18 Sep 2001

    Donald Robinson to shift.dl-portland@enron.com and 6 more

    Short at Portland System for 9/19/01.

    We are short at PGE system for 9/19/01. HE15-18pdt, we are 25mw short. HE 19-20pdt, we are 26mw short. This is due to a lending deal done by the NW Cash desk. Please supp…

  16. 14 Aug 2001

    Donald Robinson to Cara Semperger, Susie Wilson, Lisa Gang and 7 more

    I will be gone from 8/15 to 8/19.

    I will return to work on 8/20. Cara will be scheduling Light load COB and Light load MIDC while I am gone. Thank you. Donald

  17. 19 Jul 2001

    Donald Robinson to shift.portland@enron.com and 2 more

    Preschedule path going Real-Time for Friday, 07/20/01.

    7/20, HLH, 19MW: BPA C#23634-EPMI-MORGAN-PINW-CPS-PPLM-SNOH(T)BPAP/HTSP #96092NF-PPLM PPLM failed to buy the transmission for Friday. This path will go real-time. Our rea…

  18. 30 Jun 2001

    Donald Robinson to Cara Semperger, Mark Fischer, Tom Alonso and 5 more

    Preschedule paths going real-time for Sunday and Monday, 07/01 and 07/02.

    Preschedule had a heck-u-va day on Friday. Due to many problems, some of our tags were not completed until after the 3pm preschedule deadline. Apparently, some of our cou…

  19. 30 Jun 2001

    Donald Robinson to Cara Semperger, Mark Fischer, Tom Alonso and 5 more

    Preschedule paths going real-time for Sunday and Monday, 07/01 and 07/02.

    Preschedule had a heck-u-va day on Friday. Due to many problems, some of our tags were not completed until after the 3pm preschedule deadline. Apparently, some of our cou…

  20. 14 Jun 2001

    Donald Robinson to Cara Semperger, Stacy Runswick, Lisa Gang and 7 more

    Vacation, again.

    I will be out of the office from 06/16 through 06/24 due to vacation. Thank you for your support. Donald Robinson.

  21. 4 Jun 2001

    Donald Robinson to Cara Semperger, shift.portland@enron.com

    MIDC path going real-time

    Due to problems with a Mirant downstream, I had to change a couple of paths late Monday. The new and improved paths are: LADWP-CISO(T)LDWP/SYL GF-LDWP(T)SYL/MALIN #LDWP00…

  22. 25 May 2001

    Donald Robinson to Cara Semperger, Diane Cutsforth, Stacy Runswick and 7 more

    Out of the office.

    I will be out of the office from 05/26 through 06/03. Cara will be scheduling Mid Columbia in my absence. Thanks, Donald.

  23. 21 May 2001

    Donald Robinson to shift.portland@enron.com

    Regarding previous note.

    It seems I failed to mention in the previous note that the MPC-DETM-EPMI-AVISTA-GCPD path is a Mid Columbia Light load path. The deal number for the Duke purchase is: 273…

  24. 21 May 2001

    Donald Robinson to shift.portland@enron.com and 2 more

    LLH Schedule going real-time for 05/22.

    MPC-DETM-EPMI-AVISTA-GCPD. Duke was unable to purchase transmission for this path on preschedule. Duke has notified everyone in the path that they will be purchasing the …

  25. 18 May 2001

    Donald Robinson to shift.portland@enron.com

    Regarding Grant PUD cut from previous note.

    As stated in the previous note, the detm-epmi-gcpd schedule was cut to zero for HE23-24pdt on 5/21, Monday. Duke will resupply in real-time. EPMI real time will need to m…