Annuity for PGE transmission for Dec 2000.
I have created an sale annuity for PGE transmission for December 2001 per Elsie Lew's instruction. Deal #896701.1 Please call Elsie if you have any questions. Thanks, Don…
-
4 Jan 2002
Donald Robinson to Laura Wente and 4 more
DECEMBER_COBMIDCPGE_EVERYTHING.xls
COB and MIDC were done seperately until Dec. 19. I have indicated in the tab name which location. Any questions? Please ask. Donald.
-
16 Oct 2001
Donald Robinson to shift.dl-portland@enron.com and 4 more
Short due to lending at PGE System for Wednesday, 10/17.
We are short at PGE system for Wednesday, 10/17/01. HE1-6, 23-24pdt, we are 13mw short (total of 104mw). This is due to a lending deal done by the NW Cash desk. Please su…
-
3 Oct 2001
Donald Robinson to Kathy Axford, Jill Chatterton, Sean Crandall and 7 more
Out of the office for Thursday and Friday, 10/04-05
I will be returning Monday, 10/08. Cara will be doing COB and PGE system stuff in my absence. Thank you for your support. Donald.
-
2 Oct 2001
Donald Robinson to shift.dl-portland@enron.com and 6 more
Short due to lending at PGE System for Wednesday, 10/03.
We are short at PGE system for Wednesday, 10/03/01. HE7-22pdt, we are 25mw short (total of 400mw). This is due to a lending deal done by the NW Cash desk. Please supply P…
-
2 Oct 2001
Donald Robinson to shift.dl-portland@enron.com and 6 more
Short due to lending at PGE System for Wednesday, 10/03.
We are short at PGE system for Wednesday, 10/03/01. HE7-22pdt, we are 25mw short (total of 400mw). This is due to a lending deal done by the NW Cash desk. Please supply P…
-
27 Sep 2001
Donald Robinson to shift.dl-portland@enron.com and 6 more
Lending at PGE System for Saturday 09/29/01.
We are short at PGE system for Saturday, 9/29/01. HE1-6, 23-24 we are 50mw short, HE15-20pdt, we are 25mw short (total of 550mw short). This is due to a lending deal done…
-
26 Sep 2001
Donald Robinson to shift.dl-portland@enron.com and 6 more
Short at PGE system for Thurs and Fri, 09/27-28
We are short at PGE system for Thursday and Friday, 9/27-28/01. HE15-20pdt, we are 25mw short (total of 150mw short each day). This is due to a lending deal done by the N…
-
25 Sep 2001
Donald Robinson to shift.dl-portland@enron.com and 6 more
Length at PGE system for 9/26.
We are long at PGE system for Wednesday, 9/26/01. HE7-13 at 46mw, HE14 at 45mw, HE15-20 at 25mw, and HE21-22 at 46mw. Please sell from Portland system. Deal #789284.1. Th…
-
24 Sep 2001
Donald Robinson to shift.dl-portland@enron.com and 6 more
Lending at PGE System for Tuesday, 09/25/01.
We are short at PGE system for Tuesday, 9/25/01. HE1-6 , 15-20, and 23-24pdt, we are 25mw short (total of 350mw short). This is due to a lending deal done by the NW Cash …
-
21 Sep 2001
Donald Robinson to shift.dl-portland@enron.com and 6 more
Interesting Monday, 09/24. We are long and short.
We are short at PGE system for Monday, 9/24/01. HE1-6 , 23-24pdt, we are 100mw short. This is due to a lending deal done by the NW Cash desk. Please supply Portland at th…
-
20 Sep 2001
Donald Robinson to shift.dl-portland@enron.com
Update: Short at Portland System for 9/20-22
Friday's PGE system deal # is 783528.1 Saturday's is #783646.1 Thanks, Donald.
-
20 Sep 2001
Donald Robinson to shift.dl-portland@enron.com and 6 more
Short at Portland System for 9/20-22
We are short at PGE system for 9/21/01 and 9/22/01. HE15-20pdt, we are 25mw short. This is due to a lending deal done by the NW Cash desk. Please supply Portland at their…
-
18 Sep 2001
Donald Robinson to shift.dl-portland@enron.com and 6 more
Short at Portland System for 9/19/01.
We are short at PGE system for 9/19/01. HE15-18pdt, we are 25mw short. HE 19-20pdt, we are 26mw short. This is due to a lending deal done by the NW Cash desk. Please supp…
-
14 Aug 2001
Donald Robinson to Cara Semperger, Susie Wilson, Lisa Gang and 7 more
I will be gone from 8/15 to 8/19.
I will return to work on 8/20. Cara will be scheduling Light load COB and Light load MIDC while I am gone. Thank you. Donald
-
19 Jul 2001
Donald Robinson to shift.portland@enron.com and 2 more
Preschedule path going Real-Time for Friday, 07/20/01.
7/20, HLH, 19MW: BPA C#23634-EPMI-MORGAN-PINW-CPS-PPLM-SNOH(T)BPAP/HTSP #96092NF-PPLM PPLM failed to buy the transmission for Friday. This path will go real-time. Our rea…
-
30 Jun 2001
Donald Robinson to Cara Semperger, Mark Fischer, Tom Alonso and 5 more
Preschedule paths going real-time for Sunday and Monday, 07/01 and 07/02.
Preschedule had a heck-u-va day on Friday. Due to many problems, some of our tags were not completed until after the 3pm preschedule deadline. Apparently, some of our cou…
-
30 Jun 2001
Donald Robinson to Cara Semperger, Mark Fischer, Tom Alonso and 5 more
Preschedule paths going real-time for Sunday and Monday, 07/01 and 07/02.
Preschedule had a heck-u-va day on Friday. Due to many problems, some of our tags were not completed until after the 3pm preschedule deadline. Apparently, some of our cou…
-
14 Jun 2001
Donald Robinson to Cara Semperger, Stacy Runswick, Lisa Gang and 7 more
Vacation, again.
I will be out of the office from 06/16 through 06/24 due to vacation. Thank you for your support. Donald Robinson.
-
4 Jun 2001
Donald Robinson to Cara Semperger, shift.portland@enron.com
MIDC path going real-time
Due to problems with a Mirant downstream, I had to change a couple of paths late Monday. The new and improved paths are: LADWP-CISO(T)LDWP/SYL GF-LDWP(T)SYL/MALIN #LDWP00…
-
25 May 2001
Donald Robinson to Cara Semperger, Diane Cutsforth, Stacy Runswick and 7 more
Out of the office.
I will be out of the office from 05/26 through 06/03. Cara will be scheduling Mid Columbia in my absence. Thanks, Donald.
-
21 May 2001
Donald Robinson to shift.portland@enron.com
Regarding previous note.
It seems I failed to mention in the previous note that the MPC-DETM-EPMI-AVISTA-GCPD path is a Mid Columbia Light load path. The deal number for the Duke purchase is: 273…
-
21 May 2001
Donald Robinson to shift.portland@enron.com and 2 more
LLH Schedule going real-time for 05/22.
MPC-DETM-EPMI-AVISTA-GCPD. Duke was unable to purchase transmission for this path on preschedule. Duke has notified everyone in the path that they will be purchasing the …
-
18 May 2001
Donald Robinson to shift.portland@enron.com
Regarding Grant PUD cut from previous note.
As stated in the previous note, the detm-epmi-gcpd schedule was cut to zero for HE23-24pdt on 5/21, Monday. Duke will resupply in real-time. EPMI real time will need to m…