from:dale.ratliff@enron.com means Dale Ratliff (dale.ratliff@enron.com).
-
18 Mar 2002
Dale Ratliff to controllers.dl-ets@enron.com
OQ (Operator Qualification)
All gas controllers must complete the Skills Qualification Manual (SQM) by June 1,2002. For those who have not completed SMQ please contact you assigned verifier when you…
-
1 Mar 2002
Dale Ratliff to controllers.dl-ets@enron.com
OQ (Operator Qualification)
All gas controllers must complete the Skills Qualification Manual (SQM) by June 1,2002. For those who have not completed SMQ please contact you assigned verifier when you…
-
22 Feb 2002
Dale Ratliff to controllers.dl-ets@enron.com
Permian linepack
It is no longer necessary to inhibit the suction and discharge pressures at Seminole and Brownfield for correct Permian linepack. These point have been enabled in the GUI…
-
6 Feb 2002
Dale Ratliff to controllers.dl-ets@enron.com
Operator Qualification
The Operator Qualification (OQ) Rule, 49 CFR 192.801 requires that all pipelines develop a qualification program to evaluate individual's ability to perform covered tasks…
-
4 Feb 2002
Dale Ratliff to Darrell Schoolcraft, Gary Spraggins, Jerry Graves and 2 more
Operator Qualification
Please meet in my office at 10:00 am to discuss NNG/TW operator qualification. Dale
-
28 Jan 2002
Dale Ratliff to Darrell Schoolcraft, Gary Spraggins, Jerry Graves and 5 more
RE: Verifier Training
The Verifier Training will be held in EB42C1 from 8:00am to 5:00pm on Thursday January 31, 2002. If you have any questions call me at 713-853-1534 Dale
-
23 Jan 2002
Dale Ratliff to Shelley Corman
Cost numbers
Shelley, I'm currently at the loading dock loading equipment for the hanger. Did you have any questions regarding the GMS cost numbers I gave you yesterday. If so send me…
-
17 Jan 2002
Dale Ratliff to Darrell Schoolcraft, Gary Spraggins, Jerry Graves and 5 more
RE: Verifier Training
After talking with Cliff the later part of the week of January 28 will work out the best. Please let me know if this will not work for anyone. Dale
-
9 Jan 2002
Dale Ratliff to controllers.dl-ets@enron.com
Morning Meeting Reports
The reports used in the Morning Meeting have been changed. A new sheet called the "ets_west_region_tw_summary" has been added to the TWMAINLINE spread sheet, it is used t…
-
19 Oct 2001
Dale Ratliff to Edward Welsh, controllers.dl-ets@enron.com, team.sublette@enron.com and 1 more
RE: H20 Readings at Sublette station
We will continue monitoring the A line H2O reading at Sublette which is now reading approximately 13.8 pounds of water. This is the H2O content of the Haskell and Sublett…
-
17 Oct 2001
Dale Ratliff to controllers.dl-ets@enron.com
Gas Control Changes
The Gas Control Morning Meeting Report has been change to improve the presentation of the information in the morning meeting. To facilitate this a number of changes were …
-
12 Oct 2001
Dale Ratliff to controllers.dl-ets@enron.com
Gallup Peak
All GC's After utilizing the Gallup Peak Avoidance program and talking with Gary Choquette the following procedures should be used to minimize power usage during peak per…
-
11 May 2001
Dale Ratliff to Kevin Hyatt and 22 more
FW: TW 10 year capacity posting
Kevin, Per our conversation, we will change the posting of sustainable capacity to be more consistent with NNG, in that TW will post all points and groups for five years.…