from:clem.cernosek@enron.com means Clem Cernosek (clem.cernosek@enron.com).
to:mary.poorman@enron.com means Mary Poorman (mary.poorman@enron.com).
-
8 Jan 2001
Clem Cernosek to Daren J Farmer and 2 more
HPL Meter #987195 Tatton Central Point
Daren: On 8/1/99 recorded flow of 9 Mmbtus from HPL's pipeline. Currently, this volume is being booked to the HPL Strangers Gas Contract. Logistics needs either (10 Deal …
-
5 Jan 2001
Clem Cernosek to Kimberly Vaughn and 8 more
HPL Meter # 985225 FREEPORT OFFSHORE-RUTHERFORD
Kim: Effective 7/1/2000 the volumes of gas that were previously purchased from Cinergy under Contract #96017060 should be allocated and purchased under the Fairways contr…
-
3 Jan 2001
Clem Cernosek to Daren J Farmer and 4 more
HPL Meter #986679 HUGHES #1 CMP
Daren: During the months of October 1999 and November 1999, gas flowed into HPL's pipeline at the above meter. This gas was previously transported by EOG Resources to Mob…
-
28 Dec 2000
Clem Cernosek to Daren J Farmer and 4 more
HPL Meter #984179 HOFF-HELLER UNIT #22 CDP
Daren: During the period of 9/1/2000 through 9/13/2000, the above meter has recorded flow on the following days: Days Mmbtus 9/1/2000 4,873 9/2/2000 4,968 9/3/2000 4,970 …
-
27 Dec 2000
Clem Cernosek to Daren J Farmer and 4 more
HPL Meter #981052 PASADENA PLANT PHILLIPS HPL
Daren: During the period of 11/10/99 through 11/11/99, the above meter recorded flow of 1,613 Mmbtus. There was no deal at this meter the month prior or after. Currently,…
-
27 Dec 2000
Clem Cernosek to Daren J Farmer and 4 more
HPL Meter #980070 RUSK D/P - LONE STAR HPL
Daren: During the period of 11/4/99 to 12/4/99, the above meter has recorded flow on the following days: Days Mmbtus 11/4/99 2,813 11/7/99 4,248 11/8/99 2,287 11/10/99 23…
-
21 Dec 2000
Clem Cernosek to Daren J Farmer and 2 more
HPL Meter #986631TEXOMA-TEJAS HPL I/C
Daren: During the period of 1/1/2000 to 1/4/2000, the above meter has recorded flow on the following days with no deals attached: Days Mmbtus 1/1/00 3,737 1/2/00 3,713 1/…
-
19 Dec 2000
Clem Cernosek to Daren J Farmer and 2 more
HPL Meter #981046 BUTANE PLANT NECHES GAS DIST H
Daren: During the period of 9/5/99 thru 9/6/99, the above meter recorded flow of 3,962 Mmbtus. There was no deal at this meter the month prior or after. Currently, Logist…
-
19 Dec 2000
Clem Cernosek to Daren J Farmer and 2 more
HPL Meter #989648 TRAM/HPL - TRANSTEXAS THOMPSON
Daren: On 9/24/99, the above meter recorded flow of 437 Mmbtus. There was no deal at this meter the month prior or after. Logistics needs either a deal to record these vo…
-
18 Dec 2000
Clem Cernosek to Daren J Farmer and 2 more
HPL Meter #986290 INDIAN HILLS PLANT -TEJAS
Daren: On 9/15/99, the above meter recorded flow of 2,476 Mmbtus. There was Deal #113050 at the meter for 9/14/99 , but it expired on 9/14/99. Logistics needs either (1) …
-
15 Nov 2000
Clem Cernosek to Mary Poorman and 8 more
Re: Indian Springs
Mary: Deal #487040 has been setup with demand charge equally to the amounts that Teco paid HPL at Indian Spring for the following months: August & September 1999 February…