from:cara.semperger@enron.com means Cara Semperger (cara.semperger@enron.com).
to:will.smith@enron.com means Will Smith (will.smith@enron.com).
-
1 Feb 2002
Cara Semperger to Duong Luu and 8 more
I need estate logins by the end of business today for Mike Purcell and Serena Bishop
I have been told today that these folks will have to do all of our scheduling as of Monday, they are being trained today but will have to have working logins patterned af…
-
12 Dec 2001
Cara Semperger to Will Smith, Steve Nat and 2 more
Unsure of who to call
I am unable to log on to local enpower, I get a dialog box that says the following Script: W:\Scripts\enpower.vbs Line: 476 Char: 13 Error: Permission Denied Code: 800A00…
-
27 Nov 2001
-
27 Nov 2001
Cara Semperger to Corry Bentley, Duong Luu, David Poston and 4 more
Build Route Difficulties
I have re-started Enpower since the e-mail came out saying that the new version has been put into production. I ran the attatched sheet, and the last group of deals that …
-
26 Nov 2001
Cara Semperger to Vishwanatha Venkataswami and 8 more
The problem with running a whole new build route for the month when a problem occurrs
We need to be able to rely on the repeated running of the build route. Running a month long sheet from scratch is a huge problem for us, it forces us to do massive amount…
-
26 Nov 2001
Cara Semperger to Vishwanatha Venkataswami, Will Smith, William Crooks
I NEED SOMEONE TO CALL STACY RUNSWICK AS SOON AS POSSIBLE
Stacy just ran her build route for December and got data with no counterparty names, I just ran my build route for December and got new data blended with old data. We nee…
-
21 Nov 2001
Cara Semperger to Vishwanatha Venkataswami and 8 more
RE: Pre Schdule Work Space - Including Other Deals Section in Build Route
Other deals is fine, Build route has been selecting the hourly deals just fine, and including them in the off peak sections. We must be able to see these deals, as we hav…
-
15 Nov 2001
Cara Semperger to Corry Bentley, Duong Luu, David Poston and 8 more
another thing about PSW build Route
The old build route remembered what the user chose last for delivery points, and had it in the defaults each time Build route was opened. Can this be duplicated in the PS…
-
15 Nov 2001
Cara Semperger to Corry Bentley, Duong Luu, David Poston and 8 more
Another Change To Build Route Preferences
Please have the default set to "Starting on" not "Active on". We use Starting on Every day, and Active on much more rarely. Thanks, Cara
-
13 Nov 2001
Cara Semperger to shift.dl-portland@enron.com, Mike Purcell, Virginia Thompson and 17 more
All West Power Delivery Points in the new system as of Flow Date 11/15/01
Good Afternoon, The last of our kinks has been worked out and we are going to go ahead with all schedules in the new system as of 11/15. We will then have a good couple o…
-
9 Nov 2001
Cara Semperger to Corry Bentley, Duong Luu, David Poston and 2 more
Take a look at the off peak deals in this sheet
Good Evening I ran a master download for December 1 so that over the next few days I can test the overwriting fix, and found two deals that are 24 hour deals, show schedu…
-
5 Sep 2001
Cara Semperger to Asem Atta, Corry Bentley, David Poston and 8 more
Testing PSW and Path confirmation for Target date 6/20
Good Morning/Afternoon/Evening; I started working in June 22 to test path cut capabilities. I was able to save a cut path. Please make sure that Bill Williams III and Who…
-
5 Sep 2001
Cara Semperger to Asem Atta, Corry Bentley, David Poston and 8 more
Testing the PSW and Path Confirm Report
Good Morning/Afternoon/Evening; I started working in June 22 to test path cut capabilities. I was able to save a cut path. Please make sure that Bill Williams III and Who…
-
31 Jul 2001
Cara Semperger to Corry Bentley, David Poston, Will Smith and 1 more
RE: Outstanding Issues with Pre-Schedule and Path Confirmation
Please see my comments in blue What follows are known issues with the Pre-Schedule Workspace and Path Confirmation Report. Pre-Schedule Workspace: Generating Transmission…
-
27 Jul 2001
Cara Semperger to Corry Bentley, David Poston, Will Smith and 3 more
Path Confirmation Testing of latest Release
Good Afternoon: I am looking at version 1.0.0.47 the day I was checking was initally June 23, but switched over to June 20th (new data) TEXT WRAPPING: The text wraps in t…
-
18 Jul 2001
Cara Semperger to Corry Bentley, David Poston, Will Smith and 1 more
RE: Preschedule Workspace Testing-June 21 target date
Good Morning All, I will talk to Corry about how we need our transmission represented. The format is ok, I just need more information in the path or the ability to put th…
-
17 Jul 2001
Cara Semperger to Corry Bentley, David Poston, Will Smith and 13 more
Preschedule Workspace Testing-June 21 target date
Good Afternoon: I have created PSW documents for all 4 of my regions for June 21, here are my findings today: In PreSchedule Workspace: What worked: I was still able to s…
-
13 Jul 2001
Cara Semperger to Asem Atta, Will Smith and 6 more
Continuing testing of Preschedule Workspace, Path Confirmation and Path Cut software
I am working in the target date of June 20th. Today I added schedules from Palo Verde and the entire MidC sheet to the testing group. Once COB is added, we will have pret…
-
9 Jul 2001
Cara Semperger to Will Smith, Asem Atta and 4 more
Test of very tiny Preschedule sheet
I made a new sheet for the 18th of june, only 7 lines long. routing took only a few seconds. I changed all the counterparty names to match the Enpower extract I don't hav…
-
9 Jul 2001
Cara Semperger to Will Smith, Asem Atta
I made a new very small sheet for the 18th
Only 7 rows, nothing will route or confirm. Any hints??? c
-
9 Jul 2001
RE: Testing Preschedule workspace
I pulled it up, but the fields need some explaining, give me a call at your conveneince to walk me thru. c
-
9 Jul 2001
RE: Testing Preschedule workspace
I am trying to pull it up now, it's taking a long time
-
9 Jul 2001
RE: Testing Preschedule workspace
So, this table edit that Brett is asking me to test is really from you?
-
9 Jul 2001
Cara Semperger to Will Smith, Asem Atta and 4 more
FW: Testing Preschedule workspace
When I sent this e-mail, the Workspace error log popped up, the total running time for the 70 rows of path confirmation was 1 hour 30 minutes, and the rows that were not …
-
9 Jul 2001
Cara Semperger to Will Smith, Asem Atta and 4 more
Testing Preschedule workspace
Good Morning, My target testing date today is June 18th, I am running in Test P in Local Enpower using actual data from our scheduling sheets re-arranged to meet the new …