Enron email

Algorithmic Indexing

18 messages for from:cara.semperger@enron.com to:corry.bentley@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:cara.semperger@enron.com means Cara Semperger (cara.semperger@enron.com).

to:corry.bentley@enron.com means Corry Bentley (corry.bentley@enron.com).

  1. 27 Nov 2001

    Cara Semperger to Vishwanatha Venkataswami and 6 more

    IMMEDIATE PROBLEM

    SOMETHING IS BROKEN WITH THE NEW RELEASE, NONE OF OUR LIGHT LOAD DEALS PULL IN! This is priority, why would heavy load and 24 hour deals pull in, but not light load deals…

  2. 27 Nov 2001

    Cara Semperger to Corry Bentley, Duong Luu, David Poston and 4 more

    Build Route Difficulties

    I have re-started Enpower since the e-mail came out saying that the new version has been put into production. I ran the attatched sheet, and the last group of deals that …

  3. 26 Nov 2001

    Cara Semperger to Vishwanatha Venkataswami and 8 more

    The problem with running a whole new build route for the month when a problem occurrs

    We need to be able to rely on the repeated running of the build route. Running a month long sheet from scratch is a huge problem for us, it forces us to do massive amount…

  4. 21 Nov 2001

    Cara Semperger to Vishwanatha Venkataswami and 8 more

    RE: Pre Schdule Work Space - Including Other Deals Section in Build Route

    Other deals is fine, Build route has been selecting the hourly deals just fine, and including them in the off peak sections. We must be able to see these deals, as we hav…

  5. 15 Nov 2001

    Cara Semperger to Corry Bentley, Duong Luu, David Poston and 8 more

    another thing about PSW build Route

    The old build route remembered what the user chose last for delivery points, and had it in the defaults each time Build route was opened. Can this be duplicated in the PS…

  6. 15 Nov 2001

    Cara Semperger to Corry Bentley, Duong Luu, David Poston and 8 more

    Another Change To Build Route Preferences

    Please have the default set to "Starting on" not "Active on". We use Starting on Every day, and Active on much more rarely. Thanks, Cara

  7. 13 Nov 2001

    Cara Semperger to shift.dl-portland@enron.com, Mike Purcell, Virginia Thompson and 17 more

    All West Power Delivery Points in the new system as of Flow Date 11/15/01

    Good Afternoon, The last of our kinks has been worked out and we are going to go ahead with all schedules in the new system as of 11/15. We will then have a good couple o…

  8. 9 Nov 2001

    Cara Semperger to Corry Bentley, Duong Luu, David Poston and 2 more

    Take a look at the off peak deals in this sheet

    Good Evening I ran a master download for December 1 so that over the next few days I can test the overwriting fix, and found two deals that are 24 hour deals, show schedu…

  9. 5 Sep 2001

    Cara Semperger to Asem Atta, Corry Bentley, David Poston and 8 more

    Testing PSW and Path confirmation for Target date 6/20

    Good Morning/Afternoon/Evening; I started working in June 22 to test path cut capabilities. I was able to save a cut path. Please make sure that Bill Williams III and Who…

  10. 5 Sep 2001

    Cara Semperger to Asem Atta, Corry Bentley, David Poston and 8 more

    Testing the PSW and Path Confirm Report

    Good Morning/Afternoon/Evening; I started working in June 22 to test path cut capabilities. I was able to save a cut path. Please make sure that Bill Williams III and Who…

  11. 31 Jul 2001

    Cara Semperger to Corry Bentley, David Poston, Will Smith and 1 more

    RE: Outstanding Issues with Pre-Schedule and Path Confirmation

    Please see my comments in blue What follows are known issues with the Pre-Schedule Workspace and Path Confirmation Report. Pre-Schedule Workspace: Generating Transmission…

  12. 27 Jul 2001

    Cara Semperger to Corry Bentley, David Poston, Will Smith and 3 more

    Path Confirmation Testing of latest Release

    Good Afternoon: I am looking at version 1.0.0.47 the day I was checking was initally June 23, but switched over to June 20th (new data) TEXT WRAPPING: The text wraps in t…

  13. 18 Jul 2001

    Cara Semperger to Corry Bentley, David Poston, Will Smith and 1 more

    RE: Preschedule Workspace Testing-June 21 target date

    Good Morning All, I will talk to Corry about how we need our transmission represented. The format is ok, I just need more information in the path or the ability to put th…

  14. 17 Jul 2001

    Cara Semperger to Corry Bentley, David Poston, Will Smith and 13 more

    Preschedule Workspace Testing-June 21 target date

    Good Afternoon: I have created PSW documents for all 4 of my regions for June 21, here are my findings today: In PreSchedule Workspace: What worked: I was still able to s…

  15. 13 Jul 2001

    Cara Semperger to Asem Atta, Will Smith and 6 more

    Continuing testing of Preschedule Workspace, Path Confirmation and Path Cut software

    I am working in the target date of June 20th. Today I added schedules from Palo Verde and the entire MidC sheet to the testing group. Once COB is added, we will have pret…

  16. 9 Jul 2001

    Cara Semperger to Will Smith, Asem Atta and 4 more

    Test of very tiny Preschedule sheet

    I made a new sheet for the 18th of june, only 7 lines long. routing took only a few seconds. I changed all the counterparty names to match the Enpower extract I don't hav…

  17. 9 Jul 2001

    Cara Semperger to Will Smith, Asem Atta and 4 more

    FW: Testing Preschedule workspace

    When I sent this e-mail, the Workspace error log popped up, the total running time for the 70 rows of path confirmation was 1 hour 30 minutes, and the rows that were not …

  18. 9 Jul 2001

    Cara Semperger to Will Smith, Asem Atta and 4 more

    Testing Preschedule workspace

    Good Morning, My target testing date today is June 18th, I am running in Test P in Local Enpower using actual data from our scheduling sheets re-arranged to meet the new …