from:cara.semperger@enron.com means Cara Semperger (cara.semperger@enron.com).
-
22 Dec 2000
Cara Semperger to portland.shift@enron.com, Sean Crandall, Donald Robinson and 2 more
LOUISIANA PACIFIC RAMPING DOWN 12/23
Louisiana Pacific, Deal # 421598 is ramping down from 7 mw's to 2 mw's, leaving us 5 long PGE deal # 268656. The start of the ramp down is HE18 pst on 12/23, and will sta…
-
21 Dec 2000
Cara Semperger to portland.shift@enron.com, Kate Symes
Scheduling Intranet Site
Here is the address of our internal intranet site. P:\Scheduling\EnronWestSchedulingWebsite.html
-
20 Dec 2000
-
13 Dec 2000
Cara Semperger to portland.shift@enron.com and 6 more
ATTENTION!!! THERE IS LENGTH AT MONTANA SYSTEM BORDER TO SELL FOR 12/14
We are long 7 mw's from HE 12-HE24 on 12/14, this length is the usual Portland generation, their share at Colstrip. In our system it is shown as Montana System border. Th…
-
13 Dec 2000
Cara Semperger to portland.shift@enron.com, Donald Robinson, Lisa Gang and 18 more
Some new things to make your life easier
We now have a self-calculating cuts template. There are two, one located in P:/RealTime/Cuts_Worksheet and one located in P:/Scheduling/Cuts_Template. These are both writ…
-
12 Dec 2000
Cara Semperger to Kate Symes, Diana Scholtes
Smurfit Deals
I show now two Smurfit Deals, 403522 for 25 flat, at 54.65, and 246859.1 for 15 hlh, AND 25 hlh, and 246859 for 15 llh AND 25 llh. I have zeroed out the 25's from 246859 …
-
11 Dec 2000
We are 511 long for 12/12, and this is accurate
---------------------- Forwarded by Cara Semperger/PDX/ECT on 12/11/2000 04:51 PM --------------------------- Cara Semperger 12/11/2000 03:30 PM To: Portland Shift cc: Su…
-
11 Dec 2000
Cara Semperger to portland.shift@enron.com
We are 511 long for 12/12, and this is accurate
1. There is length at Montana System Border 2 mw HE 7-24. The Smurfit is ramping down, and we will be Long PGE. The deal # 477754. Enpower says Montana System,but it is r…
-
11 Dec 2000
Cara Semperger to portland.shift@enron.com and 8 more
Something new when we get cuts on our Benton, Grays, Richland, and Franklin Transmission
Please do not just change the volume of these transmission deals, the unused portion needs to be kept in scheduling, as MidC to MidC transmission. Please take a moment to…
-
8 Dec 2000
Re: December 8 is balanced now except for Real time changes
Come to me first, and I can help you sort it out from there. The only stuff that I have no clue about is the traders intra-book swaps. c Kate Symes 12/08/2000 11:15 AM To…
-
8 Dec 2000
December 8 is balanced now except for Real time changes
Thanks for the itemization, It just needed some work that I couldn't do last night at 9 pm. c
-
6 Dec 2000
Cara Semperger to portland.shift@enron.com and 2 more
PreSchedule going real time for 12/7 !!! Please call in to our counterparties
There is a 13 MW LLH schedule That was changed at 3:30 and due to its lateness, has to go real time. Here is the path: IPC@ SYS-IPC(T)SYS/LAGRANDE O#82121 hnf- IPC-SNPD(T…
-
6 Dec 2000
Cara Semperger to Mark Fischer, Tom Alonso, Diana Scholtes and 11 more
The April NWPP meeting in Reno
We have been given responsibility for the Etag portion of the agenda, and it is going to be a panel discussion with Q & A, and then an E-tag practice session. I need your…
-
4 Dec 2000
Cara Semperger to portland.shift@enron.com and 8 more
NEW WAY TO SEE THE NOB EXPORTS!!!
The global ID field has been expanded to hold more data, and now you will be able to see who the network trans provider is and the sink. Right now we are only doing this …
-
2 Dec 2000
Cara Semperger to portland.shift@enron.com
You will see Mid Columbia Long 25 HLH
This is fake, there is a problem with a cross-desk transfer, and it is being resolved by our mighty developers in Houston. c