from:ben.asante@enron.com means Ben Asante (ben.asante@enron.com).
to:darrell.schoolcraft@enron.com means Darrell Schoolcraft (darrell.schoolcraft@enron.com).
-
11 Mar 2002
Ben Asante to Team San-Juan, Rich Jolly, David Roensch and 10 more
RE: San Juan Pigging/DRA
I am attaching a profile of the efficiencies between Bloomfield and Bisti for Feb 22- March 11. Summary 1) Before pigging, (i.e. 21-27th), the efficiency was about 96.5% …
-
8 Feb 2002
Ben Asante to David Roensch and 12 more
RE: San Juan Pig
David, Here is our efficiency analysis from the online model. This is just for the Bisti to Gallup section. The other sections have comparable results. You can see that b…
-
1 Feb 2002
Ben Asante to David Roensch, Team Gallup, Darrell Schoolcraft and 4 more
RE: San Juan Pig
Certainly Tiny
-
28 Jan 2002
Ben Asante to David Roensch, Team San-Juan and 20 more
RE: San Juan Lateral Eff.
The estimated throughput affected (at the pig speed of 5-7 mph) was about 600mmcfd. The run time was 18 hrs for the DRA. But we will monitor the efficiencies for two week…
-
25 Jan 2002
Ben Asante to David Roensch and 14 more
RE: San Juan Lateral Eff.
Tiny, The Ignacio line efficiencies are still unacceptably low. We've also seen about a 2-3 % decrease in line efficiencies on the Bloomfield to Gallup segment (particula…
-
24 Jan 2002
Ben Asante to Ben Asante, John Sturn, Mansoor Abdmoulaie and 79 more
ETS Optimization - Weekly Report (24 Jan)
Please find attached the weekly report for ETS Optimization up to 01/24/02. Ben Asante
-
12 Dec 2001
Ben Asante to David Roensch, bob.mcchane@enron.com, Ron Matthews and 10 more
RE: FW: La Plata to Bloomfield
Thanks Rich, Tiny and the san Juan team. We appreciate your prompt response. ben
-
2 Mar 2001
Ben Asante to Gary Choquette and 30 more
Re: Needles Pressure Requirement
Great Gary, Can you please do something quick to tell us what the Needles pressure need to be? Thx