from:asem.atta@enron.com means Asem Atta (asem.atta@enron.com).
to:corry.bentley@enron.com means Corry Bentley (corry.bentley@enron.com).
-
10 Sep 2001
Asem Atta to Corry Bentley, Cara Semperger and 8 more
Preschedule Workspace
A new version of Preschedule Workspace has been migrated to Stage addressing the 'EDIT' bug of copying workspace. regards, Asem Atta x31700 Enron Net Works
-
10 Sep 2001
Asem Atta to Corry Bentley, Will Smith and 6 more
RE: PSW/PSC 0910 Test
Corry, As per Will, the understanding was that deals with transmissions were far and few in between and were currently being manually routed, and this was not a feature t…
-
7 Sep 2001
Asem Atta to Cara Semperger, Corry Bentley, David Poston and 4 more
RE: Status Report and Production Release Note
Just got done talking with Corry, and Deal Scheduling showing the incorrect status of a physical routed flag is an issue. Corry will proceed and test against pwrtestp on …
-
6 Sep 2001
Asem Atta to Cara Semperger, Corry Bentley and 8 more
RE: Testing PSW and Path confirmation for Target date 6/20
Cara, Thanks for stepping me through Deal Scheduling to see exactly what the problem was in regards to the Physical/Non-Physical issue. Addressed this issue and we have s…
-
6 Sep 2001
Asem Atta to Cara Semperger, Corry Bentley and 8 more
RE: Testing PSW and Path confirmation for Target date 6/20
Cara et all, Following list of bug fixes are moving out to stage to address the recently reported issues: New versions of both applications have been moved out to stage..…
-
29 Aug 2001
Asem Atta to Cara Semperger and 10 more
RE: Testing PSW and Path Confirmation done on 8/23
Cara, Looking at the Stage and Production versions of the deal scheduling application it looks like the stage version has some issues/differences.. [e.g being that check …
-
29 Aug 2001
Asem Atta to Cara Semperger, Corry Bentley, David Poston and 2 more
RE: Testing PSW and Path Confirmation done on 8/23
Cara, You are correct, if run with the params you supplied there are no results.. I did go ahead and check the option to 'Include Cross Portfolio Deals' and deals did the…
-
23 Aug 2001
Asem Atta to Cara Semperger, Corry Bentley and 8 more
PreSchedule Workspace
Cara / Corry, Having released versions of Path Confirmation and PreSchedule Workspace, we definitely would like to hear as to how the applications do testing-wise before …
-
3 Aug 2001
Asem Atta to Cara Semperger and 6 more
RE: California Regions
Cara, Looking into the Physical and Bookout summary reports, upon recreating the functionality there are certain sections to the report which we aren't clear on.. we are …
-
19 Jul 2001
Asem Atta to Cara Semperger, Corry Bentley and 4 more
RE: Preparing for Next Test Day
New version of PreSchedWS has been migrated to Stage.. Corry - TVA routing records have been deleted for 6/22/01 Cara - All specified delivery points records have been de…