Enron email

Algorithmic Indexing

22 messages for from:asem.atta@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:asem.atta@enron.com means Asem Atta (asem.atta@enron.com).

  1. 10 Sep 2001

    Asem Atta to Corry Bentley, Cara Semperger and 8 more

    Preschedule Workspace

    A new version of Preschedule Workspace has been migrated to Stage addressing the 'EDIT' bug of copying workspace. regards, Asem Atta x31700 Enron Net Works

  2. 10 Sep 2001

    Asem Atta to Corry Bentley, Will Smith and 6 more

    RE: PSW/PSC 0910 Test

    Corry, As per Will, the understanding was that deals with transmissions were far and few in between and were currently being manually routed, and this was not a feature t…

  3. 7 Sep 2001

    Asem Atta to Cara Semperger, Corry Bentley, David Poston and 4 more

    RE: Status Report and Production Release Note

    Just got done talking with Corry, and Deal Scheduling showing the incorrect status of a physical routed flag is an issue. Corry will proceed and test against pwrtestp on …

  4. 6 Sep 2001

    Asem Atta to Cara Semperger, Corry Bentley and 8 more

    RE: Testing PSW and Path confirmation for Target date 6/20

    Cara, Thanks for stepping me through Deal Scheduling to see exactly what the problem was in regards to the Physical/Non-Physical issue. Addressed this issue and we have s…

  5. 6 Sep 2001

    Asem Atta to Cara Semperger, Corry Bentley and 8 more

    RE: Testing PSW and Path confirmation for Target date 6/20

    Cara et all, Following list of bug fixes are moving out to stage to address the recently reported issues: New versions of both applications have been moved out to stage..…

  6. 6 Sep 2001

    Asem Atta to David Poston, Cara Semperger

    RE: Testing the PSW and Path Confirm Report

    Cara / David, Checking the second email Cara sent had the psc files I was in need of.. this allowed me to replicate her problems exactly.. so I wont be needing to do the …

  7. 5 Sep 2001

    Asem Atta to Cara Semperger and 8 more

    RE: Testing the PSW and Path Confirm Report

    Cara, Could I get a copy of the psc file for the preschedworkspace tests you ran today? Id like to mimic your actions to see exactly how these errors were generated and p…

  8. 29 Aug 2001

    Asem Atta to Cara Semperger and 10 more

    RE: Testing PSW and Path Confirmation done on 8/23

    Cara, Looking at the Stage and Production versions of the deal scheduling application it looks like the stage version has some issues/differences.. [e.g being that check …

  9. 29 Aug 2001

    Asem Atta to Cara Semperger, Corry Bentley, David Poston and 2 more

    RE: Testing PSW and Path Confirmation done on 8/23

    Cara, You are correct, if run with the params you supplied there are no results.. I did go ahead and check the option to 'Include Cross Portfolio Deals' and deals did the…

  10. 24 Aug 2001

    Asem Atta to Cara Semperger and 8 more

    RE: Testing PSW and Path Confirmation done on 8/23

    Cara, Trying to figure out why Im seeing a discrepancy.. could you please send me a snapshot of the deal criteria screeen from within scheduling so that I can see exactly…

  11. 23 Aug 2001

    Asem Atta to Cara Semperger, Corry Bentley and 8 more

    PreSchedule Workspace

    Cara / Corry, Having released versions of Path Confirmation and PreSchedule Workspace, we definitely would like to hear as to how the applications do testing-wise before …

  12. 14 Aug 2001

    Asem Atta to Cara Semperger

    RE: Further Testing of PSW

    Cara, Dont worry about the code for Ive taken the time to go through it and make it so that when you export from within our PreschedWS all it needs is a pre-existing Phys…

  13. 14 Aug 2001

    Asem Atta to Cara Semperger and 4 more

    RE: Further Testing of PSW

    Cara, Understood, and your plan sounds fine.. any chance of you copying that production sheet onto your local machine and using it as your own 'test' copy then? The plan …

  14. 13 Aug 2001

    Asem Atta to Cara Semperger

    RE: Further Testing of PSW

    Cara, Not a prob, the application wont look at the prod summary file unless you log in against PWRPRODN, so if you are logging against the test db's yer safe.. and for th…

  15. 13 Aug 2001

    Asem Atta to Cara Semperger and 4 more

    RE: Further Testing of PSW

    Cara, Reason for the error is that the file it was looking for was titled PhysicalAndBookoutSummary_v2_54_WESTTestP.xls . Ive gone ahead and made changes to the applicati…

  16. 4 Aug 2001

    Asem Atta to Cara Semperger

    RE: California Regions

    Cara, How goes it? ;> thanks for the mapping rules [got it all ironed out].. I do have one more question.. what do we map records with a 'SCHED_TERM' of 'WEEK' to? All th…

  17. 3 Aug 2001

    Asem Atta to Cara Semperger and 6 more

    RE: California Regions

    Cara, Looking into the Physical and Bookout summary reports, upon recreating the functionality there are certain sections to the report which we aren't clear on.. we are …

  18. 19 Jul 2001

    Asem Atta to Cara Semperger

    RE: Preparing for Next Test Day

    Cara, Following issues are handled in this version.. Slowness - Overall optimization of handling all routines dealing with data extraction within sheets. "Variant Convers…

  19. 19 Jul 2001

    Asem Atta to Cara Semperger, Corry Bentley and 4 more

    RE: Preparing for Next Test Day

    New version of PreSchedWS has been migrated to Stage.. Corry - TVA routing records have been deleted for 6/22/01 Cara - All specified delivery points records have been de…

  20. 13 Jun 2001

    Asem Atta to Holden Salisbury and 2 more

    RE: Foster

    Holden, Attached are some documents Ive developed for just that purpose..but Nikolay Kraltchev is now the main Foster contact. regards Asem x31700

  21. 25 May 2001

    Asem Atta to Michael S. White and 12 more

    FW: Status?

    Michael, Holden Salisbury, trader in our PDX office, seems to be having problems [emails included below] with getting full access to the Foster project's applications. Se…

  22. 23 May 2001

    Asem Atta to Chip Cox and 6 more

    RE: Status?

    Chip, The issue seems to be that of an Information Risk Management problem where they haven't pushed out all the application access to Holden's profile.. I had put in a t…