to:earl.chanley@enron.com means Earl Chanley (earl.chanley@enron.com).
-
9 Mar 2001
Larry Campbell to Terry Hackett and 6 more
Re: Station 2 Concerns
Terry, the entire facility has not been disturbed. Only most of it. Id say approx 70%. The other 30% has been impacted but not tot the point of disturbing all the vegetat…
-
8 Mar 2001
Larry Campbell to Byron Rance, Arnold L Eisenstein, Earl Chanley
emissions levels for the auxillary units 1-4
Byron as per the Red Rock expansion conference call today presented below are the emissions estimates for the auxillary engines at sta. 1-4. Understand these are not actu…
-
8 Mar 2001
Lorraine Lindberg to Perry Frazier and 18 more
RE: EPFS interconnect
I need as close to the exact cost for both 65,000 and 90,000 MMBtu/d as we can get. EPFS is going to pay for this and I don't want ETS to fund anything so it's important …
-
8 Mar 2001
Perry Frazier to Lorraine Lindberg and 18 more
RE: EPFS interconnect
Let me know if you need a level A or level B, in my book a level B is a "good to go" estimate. The prior scope of 60 MMBtu/d was the max. the tap could handle, any thing …
-
7 Mar 2001
Lorraine Lindberg to Perry Frazier, Arnie Bailey and 16 more
RE: EPFS interconnect
I just got off the phone with El Paso Field Services. At this time, I now need 2 cost estimates. One to increase the facilities to be able to handle up to 65,000 MMBtu/d …
-
6 Mar 2001
Mike McCracken to Kevin Hyatt, Michelle Lokay, Jeffery Fawcett and 34 more
Marketing Roundtable Notes
All Thank you very much for the great attendance and participation! Thanks, also, to all those who had to juggle this meeting with others. Attached are the notes from the…
-
6 Mar 2001
Larry Campbell to Arnold L Eisenstein, Earl Chanley, Donna Martens and 8 more
Re: TRANSWESTERN RB211
Arnold, I think I will pass on the meeting. Please apprise me of anything I may need to know from the meeting. To bring you up to date on the environmental events of the …
-
3 Mar 2001
Donna Martens to Rich Jolly, Arnold L Eisenstein, David Roensch and 22 more
Red Rock Expansion
Please review attached redline draft and provide comments and the signed FERC approval form by 2 P.M. on Tuesday, March 6. Questions, let me know. Thanks. Donna
-
24 Feb 2001
Donna Martens to Rich Jolly, Arnold L Eisenstein, David Roensch and 24 more
Red Rock Expansion Filing
Attached is a draft copy of Transwestern's application requesting authorization to abandon the existing units at Stations 1, 2, 3 and 4 and install a 38,000 HP unit at ea…
-
23 Feb 2001
Rich Jolly to Mike McCracken and 12 more
Re: Agave & Atoka System
Mike thanks for the information and you're correct in stating that marketing would have to look this over. I'm sure they will want a full scope of work. With your and Ear…
-
21 Feb 2001
Larry Campbell to Arnold L Eisenstein, Earl Chanley, Donna Martens and 10 more
Arizona Mainline Expansion
This is a gentle reminder, and Im sure that most are aware, but under no circumstances is there to be any construction activiy initiated for the turbine installation at t…
-
21 Feb 2001
Larry Campbell to William Kendrick and 8 more
RE: TW Expansion Project
Bill, the baseline noise surveys, which have been completed, were performed by Hoover and Keith out of Houston, Tx. I have a meeting scheduled with the permit engineers f…
-
20 Feb 2001
Mike McCracken to Kevin Hyatt, Michelle Lokay, TK Lohman and 30 more
Marketing Roundtable Meeting
All, The agenda for next Monday's meeting is attached. The meeting will be held in the 6th floor lunchroom at 3 Allen Center. See everyone there, Mike McCracken 505-625-8…
-
20 Feb 2001
Mike McCracken to Kevin Hyatt, Michelle Lokay, TK Lohman and 30 more
Marketing Roundtable Meeting
All, The agenda for next Monday's meeting is attached. The meeting will be held in the 6th floor lunchroom at 3 Allen Center. See everyone there, Mike McCracken 505-625-8…
-
15 Feb 2001
Arnold L Eisenstein to Larry Campbell and 2 more
Re: loading range of the RB211
You will need this!! confirming our conversation......reserve emissions for a nom 350KW (gas if prime - diesel if standby) gen set at each site
-
15 Feb 2001
Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 14 more
PG&E Report
The topock Lat. is still dry as a bone at the Measurement station and at the SLX plant. See attached on liquids gathered for this months sample run. Results will follow a…
-
9 Feb 2001
Arnold L Eisenstein to Larry Campbell and 8 more
Re: TW Mainline Expansion
Larry, your ears are good! I just heard the same news. I sent some data on emissions on the RB211on 1/31 resending the e-mails attchments. In orfer to capture the emissio…
-
6 Feb 2001
Ben Asante to terry.galassini@enron.com and 40 more
Re: Transwestern Update Meeting
Atached is the updated expansion option summary sheet we will use at the 1:00 PM meeting. Ben Asante From: Terry Galassini 02/05/2001 04:26 PM Sent by: Candace Williams T…
-
3 Feb 2001
David Roensch to Bob Burleson, David Roensch, diane.corbett@enron.com and 13 more
Re: Gas Injection Project
The conf. call requested this week has been set up for Wednesday (02/07/01). Call Name: Mt. McKinley Host: David Roensch Date: 02/07/01 Time: 2:00 CST Call In Number: 877…
-
3 Feb 2001
Jeffery Fawcett to Eric Faucheaux, Ronald Matthews, Earl Chanley and 12 more
Caithness Big Sandy, LLP
Kirk Ketcherside with IGI Resources, Inc. (see website for info on company http://www.igires.com/index.html) called to say that IGI was taking over the gas procurement si…
-
31 Jan 2001
Michelle Lokay to Earl Chanley and 12 more
Re: Pogo Interconnect
Just to summarize and bring everyone up to speed...I spoke to John Havard with Pogo again. He would like us to continue with drawings, engineering, etc. using his prepaym…
-
31 Jan 2001
Michelle Lokay to Earl Chanley and 12 more
Re: Pogo Interconnect
Just to summarize and bring everyone up to speed...I spoke to John Havard with Pogo again. He would like us to continue with drawings, engineering, etc. using his prepaym…
-
29 Jan 2001
Rich Jolly to Bob Burleson and 30 more
Re: Conference call change
This is looking better all the time. Looks like a chance to help the State of California as well as ourselves and make a few dollars. Other comments in blue. Rich
-
27 Jan 2001
Bob Burleson to Rick_Suderman@eott.com, scott_jones@eoot.com and 26 more
Re: Conference call change
Rick/Scott: Thanks for the info. I wanted to give you an update on the CoGen project. I have met with several groups in ENA Development, and the potential for a fuel swit…
-
26 Jan 2001
Kenneth Chow to Rick_Suderman@eott.com and 26 more
Gas Modelling Results
Team, Attached is a file which outlines the conditions at which two phase flow will occur when 450,000 gpd of butane is injected. Also included are details of the gas mix…