Enron email

Algorithmic Indexing

2,140 messages for mailbox:presto-k

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

36 more fall outside these years.

  1. 9 Oct 2001

    Kevin M. Presto to Lloyd Will

    RE:

    He is a definite hire. I thought I communicated that last week.

  2. 8 Oct 2001
  3. 8 Oct 2001

    Kevin M. Presto to Billy Braddock

    RE: TEA - into MEAG

    Will he let us go hourly at least 5 times per month and change the source if we go hourly. This essentially would require they provide parking and lending for up 20 MW in…

  4. 8 Oct 2001

    Kevin M. Presto to Edward Sacks, Trey Hardy, Casey Evans and 15 more

    RE: PG&E Energy Trading - Power, L.P.

    There should be no credit on a TVA/Cin spread. The correlation between the 2 markets is 95% plus.

  5. 8 Oct 2001

    Kevin M. Presto to Billy Braddock

    RE: TEA - into MEAG

    Ask him if Scherer 1,2,3 and/or 4 would work? Let him know that an odd lot would command a $2.50-3.00/Mwh premium on top In addition, even if we used Scherer, it would be…

  6. 8 Oct 2001
  7. 8 Oct 2001
  8. 8 Oct 2001

    Kevin M. Presto to John Suarez

    RE: Ravi Thuraisingham

    Let's sit down and talk. I think we should fill from within our current desk. I have some ideas.

  9. 7 Oct 2001

    Kevin M. Presto to Casey Evans, Stacey W. White

    Position Report Format

    Please make the following revisions to the peak and off-peak position reports: Remove ERCOT wind position completely from the report (PPA has been terminated) Add ERCOT n…

  10. 6 Oct 2001

    Erik Simpson to Fletcher J. Sturm, Kevin M. Presto

    Letter of resignation

    Dear Fletch and Kevin: I have decided that due to my poor performance in the East Power group that I will need to resign from Enron Corporation. I want you both to know t…

  11. 6 Oct 2001

    Kevin M. Presto to Tammy R. Shepperd, Tamara Jae Black, Lloyd Will and 1 more

    RE: Updated floor plans

    TJ, Please provide me with the latest hard copy so I can have one final meeting with my direct reports to get final confirmation for East Power seating. Thanks.

  12. 5 Oct 2001

    Kevin M. Presto to Heather Kroll and 2 more

    RE: Entergy cancels merchant plant in Louisiana

    Thanks for the info Heather. In terms of forward curve, Entergy is the worst place to be long assets right now. The equipment is probably of more interest as it relates t…

  13. 5 Oct 2001

    Kevin M. Presto to Frank Hayden

    RE:

    We are already completely full. In fact, we are already 2 seats short for my own group.

  14. 5 Oct 2001

    Kevin M. Presto to John Suarez

    RE: Ravi Thuraisingham

    Sounds like he might fit in the LMP/transmission/congestion management group. As I mentioned, we are attempting to create an Eastern Interconnect LMP model to model conge…

  15. 3 Oct 2001

    Kevin M. Presto to Mike Curry

    RE: Wind $7MM

    This has not been booked. I was told Q4. What is this?

  16. 3 Oct 2001

    Kevin M. Presto to David Leboe

    RE: East Power - 3Q Analyst Conference Presentation Slide

    I don't like the 2nd bullet - not positive enough. We are the dominant player in the power market. With respect to volumes for term trades, the risk group will have to pr…

  17. 3 Oct 2001

    Kevin M. Presto to mark@evans-automation.com

    Presto Residence

    As a follow-up to our meeting on Saturday, I talked with the designer of my house (Todd Rice with Rice Residential Design) and the electrical plan is not on a CAD system.…

  18. 3 Oct 2001

    Kevin M. Presto to wendy@evans-automation.com

    RE: New address

    Lakes on Eldridge subdivision: 5410 Morning Breeze Houston, TX 77041

  19. 3 Oct 2001
  20. 3 Oct 2001

    Kevin M. Presto to John Cummings, Jim Goughary, John L. Wilson and 3 more

    RE: REFCO Pricing & Products Discussion - If you can make it

    I have a conflict on my calender. I can meet at 3:00 only on Thursday and will be out on Friday. -----Original Appointment-----

  21. 3 Oct 2001

    John Cummings to John Cummings, Jim Goughary, John L. Wilson and 4 more

    Updated: REFCO Pricing & Products Discussion - John Cummings

    I apologize about the previous mistake on the date. This is for tomorrow afternoon. Attending from REFCO: Joe Murphy, CEO Global Refco Futures Gary Weiss, SVP, Refco Grou…

  22. 2 Oct 2001

    Kevin M. Presto to Janet Dietrich

    RE: Meeting with Janet Dietrich

    I told TJ to coordinate with you. 5:00 pm is fine tommorow. Please confirm with TJ.

  23. 2 Oct 2001

    Kevin M. Presto to Tamara Jae Black

    FW: Meeting with Janet Dietrich

    Please coordinate with Kay to set up a time that works for both of us. 5:00 pm tomorrow is good.

  24. 2 Oct 2001

    Kevin M. Presto to Casey Evans

    Gas Trades

    Sold 150 contracts per month of Feb-Mar 02 at 2.81 Sold 50 contracts per month of Nov-Dec 02 at 3.24. Bought Cal 06 at 3.60.

  25. 2 Oct 2001