  1. 4 Jun 2001

    Donald Robinson to Cara Semperger, shift.portland@enron.com

    MIDC path going real-time

    Due to problems with a Mirant downstream, I had to change a couple of paths late Monday. The new and improved paths are: LADWP-CISO(T)LDWP/SYL GF-LDWP(T)SYL/MALIN #LDWP00…

  2. 4 Jun 2001

    Kate Symes to shift.portland@enron.com

    HOURLY TRADES ARE "NO CONFIRM"

    Just wanted to make sure everyone received and read this reminder. It's an important one.....

  3. 4 Jun 2001

    Cara Semperger to shift.portland@enron.com and 6 more

    Please respect the space and belongings of others on this row

    Good Afternoon, Although Real Time is forced to live in a quasi-communal way, I would ask that you please do not treat the prescheduler desks as part of the commune. Lisa…

  4. 4 Jun 2001

    Bill Williams III to shift.portland@enron.com

    FW: We have length at Colstrip all hours on Monday, June 4

    We need to make the Enpower sale for 7 mws under ST-NW all day. All length over 7 mws we treat as normal length. Call with questions. Thanks, Bill

  5. 2 Jun 2001

    Steven Merris to shift.portland@enron.com

    Trading status with CERS

    As of 6/2/01, our lawyers have not signed any agreement with CERS, and therefore we still are not allowed to trade with them.

  6. 2 Jun 2001

    Stacy Runswick to shift.portland@enron.com, Cara Semperger

    10 MW schedule Heavy Load for the June 2nd at Mead

    Please refer to Enron Tag #23876. The path is BHPLGS gen @ BHPLSYSTEM- BHPL (T) BHPL/STGL - BHPLGS - MEAN - LAPT(T)STEGW/DAVEJOHNSTON - MEAN - MIRANT- PPW(T)DAVEJOHNSTON/…

  7. 2 Jun 2001

    Stacy Runswick to shift.portland@enron.com, Cara Semperger

    10 MW schedule Heavy Load for the June 2nd at Mead

    Please refer to Enron Tag #23876. The path is BHPLGS gen @ BHPLSYSTEM- BHPL (T) BHPL/STGL - BHPLGS - MEAN - LAPT(T)STEGW/DAVEJOHNSTON - MEAN - MIRANT- PPW(T)DAVEJOHNSTON/…

  8. 1 Jun 2001

    Cara Semperger to shift.portland@enron.com and 4 more

    We have length at Colstrip all hours on Monday, June 4

    We are 7 MW long all hours at Montana System, which is our buy from MPC, deal number 615780.1 The upstream is PSEI-DUKE-WWP-MPCO. We put in a false schedule to Smurfit to…

  9. 1 Jun 2001

    Cara Semperger to shift.portland@enron.com

    POTENTIAL problem path for Sunday

    PSCO Tag # 1020226, The path: MPCO@COLS-MPCO(T)COLS/YT-MPC-DUKE-PSCO-MPCO(T)YT/HOTS-PSCO-DUKE-ENRON-SNPD-BPA(T)HOTS/SNOH for 5 mw flat The path is stable so far, but ther…

  10. 1 Jun 2001

    Cara Semperger to shift.portland@enron.com and 4 more

    We have length at Colstrip all hours on Monday, June 4

    We are 7 MW long all hours at Montana System, which is our buy from MPC, deal number 615780.1 The upstream is PSEI-DUKE-WWP-MPCO. We put in a false schedule to Smurfit to…

  11. 1 Jun 2001

    Stanley Cocke Jr. to shift.portland@enron.com

    Harbor Pmax

    Group, This evening, Friday, 6/1, you will need to call the ISO real-time desk to have them change Harbor Cogen's Pmax. This morning, we had them change it from 80mw to 8…

  12. 1 Jun 2001

    Stanley Cocke Jr. to shift.portland@enron.com

    Delano Length for Saturday

    Group, Please take note that Delano is long on Saturday, 6/2. Please sell 7mw for HE5, and 27mw for HE6-24. Also, please check in with the control room to make sure they …

  13. 1 Jun 2001

    Eric Linder to Kourtney Nelson and 2 more

    cut wheel 06/01/2001 HE07

    The wheel from 4C to malin EPMI_CISO_BIRD for HE7 for 29mw was a cut real time.

  14. 1 Jun 2001

    Cara Semperger to shift.portland@enron.com

    SCHEDULE GOING REAL TIME FOR JUNE 1

    This schedule was not called in properly to BPA, and is therefore going real time: BPA C#24243-GAC(T)BPA(T)BPAP/GCPD O#96107-GAC-BPA-EPMI-GCPD HE 0100-0600 AND 2300-2400 …

  15. 1 Jun 2001

    Cara Semperger to shift.portland@enron.com

    SCHEDULE GOING REAL TIME FOR JUNE 1

    This schedule was not called in properly to BPA, and is therefore going real time: BPA C#24243-GAC(T)BPA(T)BPAP/GCPD O#96107-GAC-BPA-EPMI-GCPD HE 0100-0600 AND 2300-2400 …

  16. 30 May 2001
  17. 25 May 2001

    Chris H. Foster to shift.portland@enron.com and 4 more

    Services Desk/Real Time Activity for Weekend of May 26 - May 29

    Real Time: 1. We need to sell 60 MW Peak Hours 7 - 22 on Sat 5/26 for Harbor. Anything north of $150 after commission is OK. South of $150 is a little dicey, and we might…

  18. 25 May 2001

    Donald Robinson to Cara Semperger, Diane Cutsforth, Stacy Runswick and 7 more

    Out of the office.

    I will be out of the office from 05/26 through 06/03. Cara will be scheduling Mid Columbia in my absence. Thanks, Donald.

  19. 22 May 2001

    Holden Salisbury to shift.portland@enron.com and 4 more

    PNM Parking for 5/23 at Four Corners

    STSW has parked megawatts with PNM for HE 1-4 on 5/23 at Four Corners. The schedule is as follows: HE 1 10 mw HE2 20 mw HE3 19 mw HE4 5 mw Day total is 54mws. Please sell…

  20. 21 May 2001

    Donald Robinson to shift.portland@enron.com

    Regarding previous note.

    It seems I failed to mention in the previous note that the MPC-DETM-EPMI-AVISTA-GCPD path is a Mid Columbia Light load path. The deal number for the Duke purchase is: 273…

  21. 21 May 2001

    Donald Robinson to shift.portland@enron.com and 2 more

    LLH Schedule going real-time for 05/22.

    MPC-DETM-EPMI-AVISTA-GCPD. Duke was unable to purchase transmission for this path on preschedule. Duke has notified everyone in the path that they will be purchasing the …

  22. 20 May 2001

    Leaf Harasin to shift.portland@enron.com

    PGE Cut for 5/21

    Iso cut a PGE to AZUZA schedule at malin from 10MW to 6MW in HE 7 the tag that was cut was 0022790 Mark at PGE agreed to take the 4MW towards losses for that hour. SRP ha…

  23. 20 May 2001

    Ryan Slinger to shift.portland@enron.com

    NEW JUNE REALTIME WORK SCHEDULE

    THE NEW SCHEDULE IS OUT FOR JUNE, I APOLOGIZE FOR THE IRREGULARITY. THERE WERE MANY REQUESTS FOR DAYS OFF AND IF I DID NOT ACCOMODATE YOU PLEASE LET ME KNOW. SLINGER

  24. 19 May 2001

    Monika Causholli to shift.portland@enron.com

    Disregard Donald Robinson email

    Guys, Please disregard the two previous emails from Donald Robinson about a schedule going real-time on Monday. Real time should not take any action about this tag as the…

  25. 18 May 2001

    Donald Robinson to shift.portland@enron.com

    Regarding Grant PUD cut from previous note.

    As stated in the previous note, the detm-epmi-gcpd schedule was cut to zero for HE23-24pdt on 5/21, Monday. Duke will resupply in real-time. EPMI real time will need to m…