to:shift.portland@enron.com means shift.portland@enron.com.
-
4 Jun 2001
Donald Robinson to Cara Semperger, shift.portland@enron.com
MIDC path going real-time
Due to problems with a Mirant downstream, I had to change a couple of paths late Monday. The new and improved paths are: LADWP-CISO(T)LDWP/SYL GF-LDWP(T)SYL/MALIN #LDWP00…
-
4 Jun 2001
Kate Symes to shift.portland@enron.com
HOURLY TRADES ARE "NO CONFIRM"
Just wanted to make sure everyone received and read this reminder. It's an important one.....
-
4 Jun 2001
Cara Semperger to shift.portland@enron.com and 6 more
Please respect the space and belongings of others on this row
Good Afternoon, Although Real Time is forced to live in a quasi-communal way, I would ask that you please do not treat the prescheduler desks as part of the commune. Lisa…
-
4 Jun 2001
Bill Williams III to shift.portland@enron.com
FW: We have length at Colstrip all hours on Monday, June 4
We need to make the Enpower sale for 7 mws under ST-NW all day. All length over 7 mws we treat as normal length. Call with questions. Thanks, Bill
-
2 Jun 2001
Steven Merris to shift.portland@enron.com
Trading status with CERS
As of 6/2/01, our lawyers have not signed any agreement with CERS, and therefore we still are not allowed to trade with them.
-
2 Jun 2001
Stacy Runswick to shift.portland@enron.com, Cara Semperger
10 MW schedule Heavy Load for the June 2nd at Mead
Please refer to Enron Tag #23876. The path is BHPLGS gen @ BHPLSYSTEM- BHPL (T) BHPL/STGL - BHPLGS - MEAN - LAPT(T)STEGW/DAVEJOHNSTON - MEAN - MIRANT- PPW(T)DAVEJOHNSTON/…
-
2 Jun 2001
Stacy Runswick to shift.portland@enron.com, Cara Semperger
10 MW schedule Heavy Load for the June 2nd at Mead
Please refer to Enron Tag #23876. The path is BHPLGS gen @ BHPLSYSTEM- BHPL (T) BHPL/STGL - BHPLGS - MEAN - LAPT(T)STEGW/DAVEJOHNSTON - MEAN - MIRANT- PPW(T)DAVEJOHNSTON/…
-
1 Jun 2001
Cara Semperger to shift.portland@enron.com and 4 more
We have length at Colstrip all hours on Monday, June 4
We are 7 MW long all hours at Montana System, which is our buy from MPC, deal number 615780.1 The upstream is PSEI-DUKE-WWP-MPCO. We put in a false schedule to Smurfit to…
-
1 Jun 2001
Cara Semperger to shift.portland@enron.com
POTENTIAL problem path for Sunday
PSCO Tag # 1020226, The path: MPCO@COLS-MPCO(T)COLS/YT-MPC-DUKE-PSCO-MPCO(T)YT/HOTS-PSCO-DUKE-ENRON-SNPD-BPA(T)HOTS/SNOH for 5 mw flat The path is stable so far, but ther…
-
1 Jun 2001
Cara Semperger to shift.portland@enron.com and 4 more
We have length at Colstrip all hours on Monday, June 4
We are 7 MW long all hours at Montana System, which is our buy from MPC, deal number 615780.1 The upstream is PSEI-DUKE-WWP-MPCO. We put in a false schedule to Smurfit to…
-
1 Jun 2001
Stanley Cocke Jr. to shift.portland@enron.com
Harbor Pmax
Group, This evening, Friday, 6/1, you will need to call the ISO real-time desk to have them change Harbor Cogen's Pmax. This morning, we had them change it from 80mw to 8…
-
1 Jun 2001
Stanley Cocke Jr. to shift.portland@enron.com
Delano Length for Saturday
Group, Please take note that Delano is long on Saturday, 6/2. Please sell 7mw for HE5, and 27mw for HE6-24. Also, please check in with the control room to make sure they …
-
1 Jun 2001
Eric Linder to Kourtney Nelson and 2 more
cut wheel 06/01/2001 HE07
The wheel from 4C to malin EPMI_CISO_BIRD for HE7 for 29mw was a cut real time.
-
1 Jun 2001
Cara Semperger to shift.portland@enron.com
SCHEDULE GOING REAL TIME FOR JUNE 1
This schedule was not called in properly to BPA, and is therefore going real time: BPA C#24243-GAC(T)BPA(T)BPAP/GCPD O#96107-GAC-BPA-EPMI-GCPD HE 0100-0600 AND 2300-2400 …
-
1 Jun 2001
Cara Semperger to shift.portland@enron.com
SCHEDULE GOING REAL TIME FOR JUNE 1
This schedule was not called in properly to BPA, and is therefore going real time: BPA C#24243-GAC(T)BPA(T)BPAP/GCPD O#96107-GAC-BPA-EPMI-GCPD HE 0100-0600 AND 2300-2400 …
-
30 May 2001
-
25 May 2001
Chris H. Foster to shift.portland@enron.com and 4 more
Services Desk/Real Time Activity for Weekend of May 26 - May 29
Real Time: 1. We need to sell 60 MW Peak Hours 7 - 22 on Sat 5/26 for Harbor. Anything north of $150 after commission is OK. South of $150 is a little dicey, and we might…
-
25 May 2001
Donald Robinson to Cara Semperger, Diane Cutsforth, Stacy Runswick and 7 more
Out of the office.
I will be out of the office from 05/26 through 06/03. Cara will be scheduling Mid Columbia in my absence. Thanks, Donald.
-
22 May 2001
Holden Salisbury to shift.portland@enron.com and 4 more
PNM Parking for 5/23 at Four Corners
STSW has parked megawatts with PNM for HE 1-4 on 5/23 at Four Corners. The schedule is as follows: HE 1 10 mw HE2 20 mw HE3 19 mw HE4 5 mw Day total is 54mws. Please sell…
-
21 May 2001
Donald Robinson to shift.portland@enron.com
Regarding previous note.
It seems I failed to mention in the previous note that the MPC-DETM-EPMI-AVISTA-GCPD path is a Mid Columbia Light load path. The deal number for the Duke purchase is: 273…
-
21 May 2001
Donald Robinson to shift.portland@enron.com and 2 more
LLH Schedule going real-time for 05/22.
MPC-DETM-EPMI-AVISTA-GCPD. Duke was unable to purchase transmission for this path on preschedule. Duke has notified everyone in the path that they will be purchasing the …
-
20 May 2001
Leaf Harasin to shift.portland@enron.com
PGE Cut for 5/21
Iso cut a PGE to AZUZA schedule at malin from 10MW to 6MW in HE 7 the tag that was cut was 0022790 Mark at PGE agreed to take the 4MW towards losses for that hour. SRP ha…
-
20 May 2001
Ryan Slinger to shift.portland@enron.com
NEW JUNE REALTIME WORK SCHEDULE
THE NEW SCHEDULE IS OUT FOR JUNE, I APOLOGIZE FOR THE IRREGULARITY. THERE WERE MANY REQUESTS FOR DAYS OFF AND IF I DID NOT ACCOMODATE YOU PLEASE LET ME KNOW. SLINGER
-
19 May 2001
Monika Causholli to shift.portland@enron.com
Disregard Donald Robinson email
Guys, Please disregard the two previous emails from Donald Robinson about a schedule going real-time on Monday. Real time should not take any action about this tag as the…
-
18 May 2001
Donald Robinson to shift.portland@enron.com
Regarding Grant PUD cut from previous note.
As stated in the previous note, the detm-epmi-gcpd schedule was cut to zero for HE23-24pdt on 5/21, Monday. Duke will resupply in real-time. EPMI real time will need to m…