to:morgan.gottsponer@enron.com means Morgan Gottsponer (morgan.gottsponer@enron.com).
-
7 Sep 2001
Ron Matthews to Kevin Hyatt and 4 more
Ssun Devil Expansion Project - Level A Estimate
Attached is the scope and Level A cost estimate for the above mentioned project. This is the same package given to Engineering for them to prepare their Level B. Ron M.
-
4 Sep 2001
Eric Faucheaux to Kimberly Watson and 4 more
Calpine Cost Estimates
I spoke with Earl regarding the cost differences indicated for the Calpine -Topock interconnect. The project files were discarded when the E&C Group moved to 3 Allen Cent…
-
31 Aug 2001
Kevin Hyatt to Dennis Alters, Nancy Bagot, Larry Campbell and 30 more
Sun Devil Open Season Results --CONFIDENTIAL--
Overall, the results from Thursday's open season on our Sun Devil Project were very favorable (see below). Contract terms ranged from two to sixteen years. San Juan 84% s…
-
31 Aug 2001
Bryan Reinecke to Kevin Hyatt, Ron Matthews and 4 more
Sun Devil Project Comparisons To El Paso
Kevin, Here are some numbers for you to look at. I worked up three cases, one looking at a San Juan route, and two others looking at El Paso's Line 2000. The first Line 2…
-
31 Aug 2001
Doug Cebryk to Ron Matthews, Norm Spalding, Morgan Gottsponer and 9 more
RE: Sun Devil Pipeline Lengths
To All: I was very optimistic in my target of getting the Level B estimate ready by Sept 21. Based on the amount of work that will need to be done to get a decent +/- 10%…
-
30 Aug 2001
Ron Matthews to Norm Spalding, Morgan Gottsponer, John R. Keller and 7 more
RE: Sun Devil Pipeline Lengths
A preliminary model has been developed based on the limited information Doug, Kevin, and I discussed yesterday. A finished product won't be complete until such time as el…
-
30 Aug 2001
John Sturn to Rich Jolly, David Roensch, Kimberly Watson and 17 more
La Plata DRA Conference Call - 9:00 CST, Friday, 8/31
The La Plata DRA conference call has been scheduled for 9:00 a.m., CST, Friday, 08/31. The dial in information is below. The purpose of the call is to review all we know …
-
29 Aug 2001
Darrell Schoolcraft to John Sturn, Rich Jolly, David Roensch and 17 more
RE: La Plata to Bloomfield Drag Reducing Agent Conference Call
How does 9:00 work for everyone. This is a very critical topic and needs to be discussed asap. DS
-
29 Aug 2001
John Sturn to Rich Jolly, David Roensch, Kimberly Watson and 17 more
La Plata to Bloomfield Drag Reducing Agent Conference Call
Well, that didn't work. Neither Thursday nor Friday at 2:00 will work. I'll try one more time for this week. Please let me know by noon, Thursday if you can not make any …
-
28 Aug 2001
Eric Faucheaux to David Roensch and 4 more
RE: Griffith
Good to know. Be on look out for e-mail inviting you to attend conference call Friday around 3:00pm
-
28 Aug 2001
Perry Frazier to Kimberly Watson and 4 more
PEPL unsubscribed for Sep-Dec 2001.
Kim: The PEPL Del point # 8042 and the NGPL Gray Del point 6839 has available unsubsribed as follows: Darrell will not allow FT at NGPL Hansford like Agave wants. Agave R…
-
28 Aug 2001
Morris Brassfield to Dan Pribble, Michel Nelson, Randy Rice and 286 more
Operations Support Services - Reorganization Announcement
<<OSS_Org_Announcement_Aug.doc>> <<OSS_Organization_Aug_2001.ppt>> Morris A. Brassfield Enron Transportation Services Senior Director Operations Support Services Three Al…
-
23 Aug 2001
Mansoor Abdmoulaie to Kimberly Watson and 2 more
TW/ Agave
Following- up on our conversation regarding mercaptan sulfur on Agave's gas: TW- Gas Quality requirements: Shall not contain not more than .3 grains mercaptan sulfur per …
-
22 Aug 2001
Ron Matthews to Kevin Hyatt, Morgan Gottsponer, Doug Cebryk and 4 more
Sun Devil Project - Level B Request "REVISED"
I found a mistake in the first Excel spreadsheet when discussing with Kim Kouri. Cost Estimate Summary sheet (2nd tab) did not add all of the rows down for the San Juan p…
-
21 Aug 2001
Ron Matthews to Kevin Hyatt, Morgan Gottsponer and 2 more
Sun Devil Project - Level B Request
Attached is a Level B request for the Sun Devil project. Keep in mind that this should include only right of way at this time. Details on the compression will probably ch…
-
21 Aug 2001
Kimberly Watson to Sasha Divelbiss, Morgan Gottsponer
RE: Pottery
Morgan, I am on the road on Tues and Wed back on Thursday. I would love to see everyone's handy work if people can wait that long. Otherwise, can you keep it in your offi…
-
20 Aug 2001
Ron Matthews to Kevin Hyatt, Morgan Gottsponer, Eric Faucheaux
Sun Devil Project
Attached is the latest and greatest breakdown of facilities and Level A costs related to Sun Devil. Facilities are not final and will be refined as the project unfolds.
-
20 Aug 2001
Sasha Divelbiss to Kimberly Watson, Morgan Gottsponer
Pottery
Kim/Morgan: The pottery is finally HERE!! Please let me know when you would like me to deliver your pottery. Thanks Sasha Sasha Divelbiss ETS - HR Analyst Wk(713)345-8714…
-
15 Aug 2001
Eric Faucheaux to Lorraine Lindberg and 6 more
RE: Duke Power Plant
Yes, Perry will help you. Please reply via e-mail with other specifics you might have such as flow and pressure requirements. EF ext. 33395
-
13 Aug 2001
Eric Faucheaux to Ron Matthews and 4 more
RE: Caithness - Big Sandy Project
They will also be required to sign a confidential, proprietary information form. This form is in the Supplement Section where you got the attachments in your original mes…
-
13 Aug 2001
Ron Matthews to ketchek@bp.com and 6 more
Caithness - Big Sandy Project
Attached are the engineering standards you requested on our latest telephone discussion with Kim Watson. Also attached is a cost estimate summary that the numbers were ma…
-
6 Aug 2001
Sasha Divelbiss to Morgan Gottsponer, Kimberly Watson, John R. Keller and 22 more
TEAM BUILDER
This is just a Reminder!!!! August 8th - Four Seasons Hotel Downtown 1300 Lamar Street (we will be located in the Conroe Room) Breakfast will be served at 7:15 AM and we …
-
6 Aug 2001
Lindy Donoho to Steven Harris, Kimberly Watson, TK Lohman and 20 more
TW's Firm Capacity Procedures
Attached is the current version of TW's Firm Capacity Procedures. (Posting requirements are defined in another document.) These procedures outline the definitions of cert…
-
1 Aug 2001
Michele Winckowski to m..allen@enron.com, ken.anderson@enron.com, doug.aschwege@enron.com and 127 more
Omaha - Certificate Status Report
Attached is the Certificate Status Report (Omaha) for August 2001. If you would like your name removed from the distribution list of this report, please let me know. than…
-
30 Jul 2001
Kimberly Watson to Sasha Divelbiss and 2 more
RE: TEAM BUILDER
Sasha, Great, sorry, I didn't see the scroll bar. Thanks! If you would just coordinate an assortment of pizza's, that would be great. I believe Morgan may have a couple o…