Enron email

Algorithmic Indexing

103 messages for from:larry.campbell@enron.com to:william.kendrick@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:larry.campbell@enron.com means Larry Campbell (larry.campbell@enron.com).

to:william.kendrick@enron.com means William Kendrick (william.kendrick@enron.com).

  1. 12 Dec 2000

    Larry Campbell to Louis Soldano, John Shafer and 6 more

    Discoveries of PCB's on Regulator Sites on Southwest Gas

    I received a call from Ralph Komai, PCB person for SoCal concerning new hits of PCBs at regulator sites on the Southwest Gas system. It appears that SWG did some liquids …

  2. 29 Nov 2000

    Larry Campbell to Louis Soldano, John Shafer and 8 more

    EOTT concerns with Fuller's resignation

    I had dinner tonight with a Robert Jacobs EOTT V.P. West Coast and Ed Attanasio EOTT Senior Counsel. This dinner meeting was put together by Gary Fuller. Both Jacobs and …

  3. 6 Nov 2000

    Larry Campbell to Rich Jolly, mike.bonnstetter@enron.com, david.boothe@enron.com and 5 more

    ADEQ Requirement for Notification of Mechanical Activities

    I received a call from a permit engineer with the Arizona Dept. of Environmental Quality (ADEQ) concerning the issue of notification of mechanical activities at C/S 2 Fla…

  4. 11 Aug 2000

    Larry Campbell to Louis Soldano, John Shafer and 14 more

    PCB Study on the SoCal System

    I received a call from Ralph Komai, PCB engineer with SoCal, about a pipeline liquids collection SoCal wants to take at our Needles facility. Ralph said that SoCal will b…

  5. 1 Aug 2000

    Larry Campbell to Rick Cates, Rich Jolly, William Kendrick and 4 more

    Testing at Station 3

    When we do the emissions testing at C/S No. 3, Luepp, we should be aware of the positives and negatives. The positives being the information which Steve and company will …

  6. 5 Jul 2000

    Larry Campbell to Michel Nelson, Rich Jolly, David Roensch and 10 more

    Latest deconning Activity-Topock Lateral

    As a result of the latest meeting with PG&E over the greater than 500 ppm PCB liquids collection at the PGE Topock C/S filter separator (F/S), presented below is a summar…

  7. 12 Jun 2000

    Larry Campbell to Michel Nelson, John Shafer, Rich Jolly and 11 more

    Additonal PCB Sampling on the SoCal System

    During the quarterly conference call with SoCal in which we discuss PCB costs on the SoCal system, for which Transwesten is 86% responsible, Ralph Komai, SoCal's PCB pers…

  8. 1 May 2000

    Larry Campbell to Rick Cates, William Kendrick, Mike Riedel and 11 more

    May Conference Call

    The issues discussed during the May 1, 2000 environmetnal conference call were as follows: Home Officing- Employees within OTS and EHS have been asked to pilot a telecomm…

  9. 28 Mar 2000

    Larry Campbell to Michel Nelson and 14 more

    Re: Ralph Komai, Training Presentation

    Mike, I spoke to Ralph and he gave me an open week of April 17th in San Francisco. He thought that one day would be more that adequate. I need to have somebody contact th…

  10. 15 Mar 2000

    Larry Campbell to Rick Craig, Michel Nelson, Michael Terraso and 8 more

    PG&E/Southwest Gas Meeting

    On tuesday of this week, Lou Soldano and I attended a meeting between the above referenced parties concerning the issue of PCB's which had migrated into the PG&E system. …

  11. 13 Mar 2000

    Larry Campbell to steve.sanmiguel@enron.com and 36 more

    Re: Request

    Steve, you have been given all the written permit history and portable analyzer correspondance from myself to and from the State of New Mexico. All of my air permit files…

  12. 13 Mar 2000

    Larry Campbell to Rick Craig, William Kendrick, Rick Cates and 5 more

    Media Statement

    Just a short note to let you know that I received a call from Rod Bosche of PG&E apprising me of a meeting PG&E will be having with SW Gas this tuesday. They will be disc…

  13. 6 Mar 2000

    Larry Campbell to Michael Adewumi and 10 more

    Re: Penn State meetings

    Michael, our liquids data collections have been pretty lean. Its only been in the last couple of months where we have actually collected any arsenic data. I will send to …

  14. 2 Mar 2000

    Larry Campbell to Michael Terraso, William Kendrick, Rick Cates and 2 more

    (no subject)

    Mike I wanted to give a short update on the latest events related to the PCB issue with PG&E. Transwestern met with PG&E this last Wednesday with an agenda that included …

  15. 2 Mar 2000

    Larry Campbell to Michael Terraso, William Kendrick, Rick Cates and 2 more

    (no subject)

    Mike I wanted to give a short update on the latest events related to the PCB issue with PG&E. Transwestern met with PG&E this last Wednesday with an agenda that included …

  16. 3 Feb 2000

    Larry Campbell to Bret Reich and 12 more

    Transwestern's Facilities List

    Bret, per ;you request, presented below is a list of Priority 1 and 2 sites in Arizona, New Mexico, Colorado and Texas for which we have running horsepower and emit emiss…

  17. 2 Feb 2000

    Larry Campbell to team.artesia@enron.com, team.monahans@enron.com, Team San-Juan and 8 more

    Nitrogen and Sulfur reporting and Recordkeeping for Turbines

    For those teams that have turbines installed after 1990 and/or for those turbines which have undergone power unit changouts, the following recordkeeping and monitoring co…

  18. 18 Nov 1999

    Larry Campbell to Michael Terraso, Rick Cates, William Kendrick and 6 more

    Results of the Environmental Meeting at C/S 6, Laguna

    A meeting was held at C/S 6, Laguna on Tuesday November 16th, to reintroduce the pueblo of Laguna to Transwestern's environmental activities at the facility. The Laguna's…

  19. 12 Nov 1999

    Larry Campbell to Michael Terraso, Rich Jolly, Louis Soldano and 9 more

    Conference Cal with Adewumi

    This is just a short update on the conference call just completed with Michael Adewumi of Penn State, concerning the PCB pipeline modeling project proposed for the Transw…

  20. 10 Nov 1999

    Larry Campbell to William Kendrick and 8 more

    Re: LaPlata

    Bill, we had an air inspection at the facility a couple of weeks ago and all went well. Prior to the state visit, we went through a "trouble shooting" scenario and found …

  21. 22 Oct 1999

    Larry Campbell to George Robinson and 6 more

    Re: TW Laguna Station Remediation

    George, I will attend this meeting with you on the 16th. George Robinson 10/22/99 01:42 PM To: Ted Ryther/OTS/Enron@Enron cc: William Kendrick/OTS/Enron@Enron, Larry Camp…

  22. 27 Aug 1999

    Larry Campbell to Earl Chanley, William Kendrick, Rich Jolly and 6 more

    PG&E PCB Meeting with John Woodyard

    In light of the recent PCB issue with PG&E on the Topock Lateral, I have asked Mr. John Woodyard of Roy F. Westin to c ome to Houston and make a presentation on PCB's in …

  23. 23 Jul 1999

    Larry Campbell to Michel Nelson, Rich Jolly, David Roensch and 11 more

    Recent PCB Results, Topock Lateral

    A 2:00 pm central time conference call has been scheduled to discuss the most recent analytical results from the Topock Lateral PCB sampling. Your attendence is requested…

  24. 15 Jul 1999

    Larry Campbell to team.monahans@enron.com and 10 more

    Groundwater Monitoring to be Discontinued at the Puckett Plant

    Approval was received from the Texas Railroad Commission to discontinue groundwater monitoring at the Pucket Plant. As you may remember, Transwestern constructed a permit…

  25. 11 Jun 1999

    Larry Campbell to Rich Jolly, Michel Nelson, David Roensch and 8 more

    Cleaning Postponement of the pipeline between TW PG&E M/S and the Topock C/S

    Based upon valving constraints and the innaccessability to the inside of the pipe between our M/S and the Topock C/S, a decision has been made to postpone cleaning of his…