14 Aug 2001
Larry Campbell to team.artesia@enron.com, team.big-lake@enron.com, team.carlsbad@enron.com and 54 more
Southwest Region Environmental Roundtable Oct. 16-18
The Southwest Region will be hosting its 2001 environmental roundtable in Albuquerque, NM on October 16-17 at the Holiday Inn Crowne Plaza (505) 821-3333. Room rates are …
-
9 Aug 2001
Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 13 more
PG&E Report
See attached for this months liquids gathered for this months samples. Also attached is an updated pigging report. Thanks, Randy
-
18 Jul 2001
Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 13 more
Sample run results
See attached for sample results for this months sample run. Larry I think the reson we got NDs on our samples is because the lab raised the reporting limit due to dilutio…
-
11 Jul 2001
Rich Jolly to Arnie Bailey, Rick Smith, David Roensch and 89 more
San Juan Team Advisor
Effective July 2nd David (Tiny) Roensch) accepted the responsibilities of being the Advisor for the San Juan Team. He will be the Advisor for the Kingman, Flagstaff and S…
-
22 Jun 2001
Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 13 more
PGE sample results
See attached for this months sample run.
-
12 Jun 2001
Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 13 more
PGE sample run
We had to change labs so i don't know when the results will be back. Here are the liquids gathered for this months sample run. See attached. Thanks, Randy
-
31 May 2001
Darrell Schoolcraft to Kenneth Young and 38 more
Re: TW 1090 Project Schedule - Stations 1-4
We need know everyday units need to be taken down and for how long. Depending on system conditions we may have to allocate. DS From: Kenneth Young 05/31/2001 09:36 AM To:…
-
31 May 2001
Darrell Schoolcraft to Kenneth Young and 38 more
Re: TW 1090 Project Schedule - Stations 1-4
Ken, We currently have a unit down at Station 4. If you need to work on something now is the time to do it and not wait until June. DS From: Kenneth Young 05/30/2001 11:5…
-
31 May 2001
Darrell Schoolcraft to Kenneth Young and 38 more
Re: TW 1090 Project - Stations 1-4
What is the time frame these units need to be down. There are no postings for volume deductions. Please someone give me some ideas. Thanks Ds From: Kenneth Young 05/30/20…
-
21 May 2001
Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 13 more
PG&E Samples
See attached PG&E sample results.
-
11 May 2001
Larry Campbell to team.flagstaff-sta2@enron.com, Team Flagstaff, team.kingman-sta1@enron.com and 6 more
pollution Prevention Training
Under the regulations of the state of Arizona, facilities which have a pollution prevention plan (sta.1, sta. 2 and Needles) are required to have an annual training to ev…
-
8 May 2001
Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 13 more
PG&E Sample Report
See attached for liquids gathered for this months sample run. Results will follow.
-
30 Apr 2001
Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 13 more
PG&E Pigging and Sample Report Update
Here are the latest results and updates.
-
19 Apr 2001
Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 13 more
April Sample Run
Here are the liquid amounts from this months sample run with PG&E. Please see attached spreadsheet.
-
15 Feb 2001
Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 14 more
PG&E Report
The topock Lat. is still dry as a bone at the Measurement station and at the SLX plant. See attached on liquids gathered for this months sample run. Results will follow a…
-
10 Jan 2001
Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 14 more
PG&E Activity Report.
See attached
-
20 Dec 2000
Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 14 more
PG&E Monthly Sample Results
These sample results are looking better. See attached for this months sample results.Thanks,Randy
-
23 Mar 2000
Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 12 more
Bi-Weekly Sample Run & Pigging Report
The pig that was run to PG&E on Monday came in dry with no liquids. As you will notice there are a few new sample points with liquids that were accumilated. Please see at…
-
23 Jul 1999
Larry Campbell to Michel Nelson, David Roensch, Rich Jolly and 9 more
Recent PCB Analytical Results, Topock Lateral
A 2:00 pm central time conference call has been scheduled to discuss the most recent PCB analytical results for the Topock Lateral. Your attendance is requested. The dial…