  1. 12 Mar 2001

    Larry Campbell to Rich Jolly, William Kendrick, Randy Rice and 4 more

    Additional Noters on SoCals Meeting with Southwest Gas over PCBs

    I spoke with Ralph Komai, PCB person with SoCal, concerning the SWG meeting about PBCs on the SWG system. As mentioned in the last note, SWG has discovered PCBs and has b…

  2. 8 Mar 2001

    Larry.Campbell@enron.com to Kenny_Maltby@eott.com, enron@eott.com, bob_jacobs@eott.com and 8 more

    Re: Rogas Pipelines

    Kenny, as you may know, there were 9 environmental applications submitted to various local, state, and regional agencies requesting approval to initiate this project and …

  3. 6 Mar 2001

    Larry Campbell to Arnold L Eisenstein, Earl Chanley, Donna Martens and 8 more

    Re: TRANSWESTERN RB211

    Arnold, I think I will pass on the meeting. Please apprise me of anything I may need to know from the meeting. To bring you up to date on the environmental events of the …

  4. 21 Feb 2001

    Larry Campbell to John Shafer, William Kendrick, Louis Soldano and 4 more

    SoCal Meeting with Southwest Gas

    I wanted to let everyone know that the meeting between Southwest Gas and SoCal concerning presence of PCBs on the Southwest Gas system will be this tuesday. I had an oppo…

  5. 21 Feb 2001

    Larry Campbell to Richard McCurdy and 10 more

    Line 300 Liquid Sample SummaryFeb01TW.xls

    Rich, thanx for the sampling update. Ill pass it along to the apropriate parties. A cursory look at the data shows it to be inconsistently up and down, as expected, with …

  6. 21 Feb 2001

    Larry Campbell to George Robinson and 4 more

    Re: Meeting with the Laguna's over the PCB remediation at C/S 6

    Thanx, George. Please let us know what their initial reaction and evaluation is of the conditions at Sta. 6. Im interested in what their thoughts are with respect to the …

  7. 21 Feb 2001

    Larry Campbell to Arnold L Eisenstein, Earl Chanley, Donna Martens and 10 more

    Arizona Mainline Expansion

    This is a gentle reminder, and Im sure that most are aware, but under no circumstances is there to be any construction activiy initiated for the turbine installation at t…

  8. 21 Feb 2001

    Larry.Campbell@enron.com to John Shafer, scott.jones@enron.com and 20 more

    Re: Rogas Line -- USFW Approval

    John, Scott Jones, I believe is still on vacation in Hawaii of all places. And I believe you are correct that we have around 15 acres of existing credit. Kenny, let me kn…

  9. 21 Feb 2001

    Larry Campbell to William Kendrick and 8 more

    RE: TW Expansion Project

    Bill, the baseline noise surveys, which have been completed, were performed by Hoover and Keith out of Houston, Tx. I have a meeting scheduled with the permit engineers f…

  10. 16 Feb 2001

    Larry Campbell to John Shafer, Louis Soldano, Cutty Cunningham and 3 more

    Meeting with the Laguna's over the PCB remediation at C/S 6

    John, Lou, Cutty, Bill, I want to bring this issue back up for your attention, as I know that everyone is very busy. During the EPA Title V inspection at the Laguna C/S t…

  11. 12 Feb 2001

    Larry Campbell to John Shafer and 8 more

    Permitting Status, Rogas Construction Project

    John, this is a short note to let you know where we stand on the 7 mile pipeline construction Rogas Project with respect to environmental permitting and approvals. The fo…

  12. 5 Feb 2001

    Larry Campbell to John Shafer

    Re: Annual Report

    John, I had asked Randi to complete an annual report for the F&G 2081 permit, as I did not want to have this hang over our head when EOTT's 2081 application was reviewed.…

  13. 1 Feb 2001

    Larry Campbell to Edward Attanasio and 14 more

    Re: No. Coles Levee to Rogas Interconnect - Permit & Property Owner R equirements

    Ed the 6" project you are talking about is a small project independant of Rogas where a 6"line will be constructed from North Coles and run above ground, if possible, to …

  14. 24 Jan 2001

    Larry Campbell to John Shafer, Louis Soldano, Cutty Cunningham and 13 more

    Meeting with the Laguna's over the PCB remediation at C/S 6

    I wanted to present this summary of the meeting Transwestern had with representatives of the Laguna Pueblo concerning the status of the PCB remediation activities by TW. …

  15. 10 Jan 2001

    Larry Campbell to William Kendrick, John Shafer, Louis Soldano and 8 more

    Re: Environmental -- NCL

    Bill, Just a short note to let you know whats going on at Bakersfield. I have spoken to the agency inspector about one of the NOV issues and have been told that EOTT will…

  16. 12 Dec 2000

    Larry Campbell to Louis Soldano, John Shafer and 6 more

    Discoveries of PCB's on Regulator Sites on Southwest Gas

    I received a call from Ralph Komai, PCB person for SoCal concerning new hits of PCBs at regulator sites on the Southwest Gas system. It appears that SWG did some liquids …

  17. 29 Nov 2000

    Larry Campbell to Louis Soldano, John Shafer and 8 more

    EOTT concerns with Fuller's resignation

    I had dinner tonight with a Robert Jacobs EOTT V.P. West Coast and Ed Attanasio EOTT Senior Counsel. This dinner meeting was put together by Gary Fuller. Both Jacobs and …

  18. 28 Aug 2000

    Larry Campbell to Louis Soldano, John Shafer

    Due Diligence, Equilon Pipeline Company

    Louie/John, this memo summerizes the results of the environmental due diligence which was performed on the Texas Panhandle and Cortez, Colorado portions of Equilon piplin…

  19. 11 Aug 2000

    Larry Campbell to Louis Soldano, John Shafer and 14 more

    PCB Study on the SoCal System

    I received a call from Ralph Komai, PCB engineer with SoCal, about a pipeline liquids collection SoCal wants to take at our Needles facility. Ralph said that SoCal will b…

  20. 5 Jul 2000

    Larry Campbell to Michel Nelson, Rich Jolly, David Roensch and 10 more

    Latest deconning Activity-Topock Lateral

    As a result of the latest meeting with PG&E over the greater than 500 ppm PCB liquids collection at the PGE Topock C/S filter separator (F/S), presented below is a summar…

  21. 12 Jun 2000

    Larry Campbell to Michel Nelson, John Shafer, Rich Jolly and 11 more

    Additonal PCB Sampling on the SoCal System

    During the quarterly conference call with SoCal in which we discuss PCB costs on the SoCal system, for which Transwesten is 86% responsible, Ralph Komai, SoCal's PCB pers…

  22. Undated

    Larry Campbell to John Shafer and 12 more

    RE: Red Rock Air Permits Heads up!

    From: John Shafer/ENRON@enronXgate on 09/16/2001 09:07 PM CDT To: Phil Lowry/ENRON@enronXgate, Jerry D Martin/ENRON@enronXgate cc: Louis Soldano/ENRON@enronXgate, William…