with:robert.cotten@enron.com means Robert Cotten (robert.cotten@enron.com).
-
24 Mar 2001
Cheryl Dudley to Lauri A Allen, Debbie R Brackett, Clem Cernosek and 31 more
04/01 Assignment, Termination, Expiration Report - Houston Pipe Line
Attached is the April 2001 Assignment, Termination & Expiration Report for Houston Pipe Line's contracts. (FYI - It contains all of the entries made by our group since th…
-
24 Mar 2001
-
24 Mar 2001
Robert Cotten to O'Neal D Winfree and 2 more
Volume Changes
O'Neal, The following volume changes were made today: Deal # Meter # Zone From To Effective 439825 9797 6 626 1000 3/24-3/31 439837 3543 3 808 1000 3/24-3/31 377169 9842 …
-
23 Mar 2001
Robert Cotten to Carlos J Rodriguez and 4 more
Phillips - 4/01
Carlos, I created the following deal for 4/01 production: Deal #: 689508 Meter #: 98-6782 Deal Volume: 5,000 Expected Vol.: 4,200 Price: IFHSC less $0.05 Bob
-
23 Mar 2001
Cheryl Dudley to Lauri A Allen, Debbie R Brackett, Clem Cernosek and 31 more
04/01 Assignment, Termination, Expiration Report - Houston Pipe Line
Attached is the April 2001 Assignment, Termination & Expiration Report for Houston Pipe Line's contracts. (FYI - It contains all of the entries made by our group since th…
-
23 Mar 2001
-
23 Mar 2001
Robert Cotten to O'Neal D Winfree and 2 more
Volume Changes
O'Neal, The following volume changes were made today: Deal # Meter # Zone From To Effective 439825 9797 6 626 1000 3/24-3/31 439837 3543 3 808 1000 3/24-3/31 377169 9842 …
-
23 Mar 2001
Cheryl Johnson to Laurel Adams, Amelia Alland, Lauri A Allen and 196 more
Name Change/Merger Report 0323
Attached is the FINAL Name Change/Merger report for March 2001. Please note that the most recent overlays are on top because unlike the others, prior notification has not…
-
23 Mar 2001
Robert Cotten to Carlos J Rodriguez and 4 more
Phillips - 4/01
Carlos, I created the following deal for 4/01 production: Deal #: 689508 Meter #: 98-6782 Deal Volume: 5,000 Expected Vol.: 4,200 Price: IFHSC less $0.05 Bob
-
22 Mar 2001
Robert Cotten to Daren J Farmer
Meter # 9842
Daren, Mike in Gas Control called and said meter # 9842 is flooded and has not flowed in a couple of days. The field tech said it will probably be a few days before it re…
-
22 Mar 2001
Veronica Espinoza to Debbie R Brackett, William S Bradford, andrew.conner@enron.com and 244 more
Revised Credit Watchlist--3/22/01
Attached is a revised Credit Watch listing as of 3/22/01. Please note that the status of both PG&E Energy Trading-Gas Corp. and PG&E Energy Trading-Canada Corp. is "NO TR…
-
22 Mar 2001
Robert Cotten to Daren J Farmer
Meter # 9842
Daren, Mike in Gas Control called and said meter # 9842 is flooded and has not flowed in a couple of days. The field tech said it will probably be a few days before it re…
-
22 Mar 2001
Robert Cotten to Daren J Farmer
April Wellhead Production Estimate
Daren, This didn't help as I am unable to access any information on the file. Bob
-
22 Mar 2001
Robert Cotten to Daren J Farmer
Re: FW: FIRST DELIVERY - RODESSA OPERATING CO.
Daren, I talked to Vance and he said it was the same well that he nominated during bidweek. I will ask Julie to change the price to Gas Daily. Thanks. Bob
-
22 Mar 2001
Daren J Farmer to Robert Cotten
Re: FW: FIRST DELIVERY - RODESSA OPERATING CO.
Bob, I guess you need to make sure that this is the same well that they nominated during bidweek. If it is, then we do need to change the price to GD. If it is a new well…
-
21 Mar 2001
-
21 Mar 2001
Robert Cotten to Daren J Farmer
FW: FIRST DELIVERY - RODESSA OPERATING CO.
Daren, Please read this memo and the one dated 2/21/01 from Vance. He told me all new production should be entered at IFHSC. The deal in question is 634075. Do you want i…
-
21 Mar 2001
Mary Poorman to Michael Olsen, Edward Terry, Tom Acton and 11 more
Rough list
I have compiled a list based on the RTU variance for current mo., and the imbalance report. Please verify, add or update the information based on your desk's activities. …
-
21 Mar 2001
Mary Poorman to Michael Olsen, Edward Terry, Tom Acton and 11 more
Urgent
Ed has requested that we compile a list this morning of all parties/points which we owe gas to, in the event that we need to find a home for excess volumes today. Please …
-
21 Mar 2001
Robert Cotten to Daren J Farmer
April Wellhead Production Estimate
Daren, This didn't help as I am unable to access any information on the file. Bob
-
21 Mar 2001
Robert Cotten to Daren J Farmer
Re: FW: FIRST DELIVERY - RODESSA OPERATING CO.
Daren, I talked to Vance and he said it was the same well that he nominated during bidweek. I will ask Julie to change the price to Gas Daily. Thanks. Bob
-
21 Mar 2001
Daren J Farmer to Robert Cotten
Re: FW: FIRST DELIVERY - RODESSA OPERATING CO.
Bob, I guess you need to make sure that this is the same well that they nominated during bidweek. If it is, then we do need to change the price to GD. If it is a new well…
-
21 Mar 2001
-
21 Mar 2001
Robert Cotten to Daren J Farmer
FW: FIRST DELIVERY - RODESSA OPERATING CO.
Daren, Please read this memo and the one dated 2/21/01 from Vance. He told me all new production should be entered at IFHSC. The deal in question is 634075. Do you want i…
-
21 Mar 2001
Mary Poorman to Michael Olsen, Edward Terry, Tom Acton and 11 more
Rough list
I have compiled a list based on the RTU variance for current mo., and the imbalance report. Please verify, add or update the information based on your desk's activities. …